№ lp_1_17122
File format: docx
Character count: 115833
File size: 286 KB
The document provides standardized guidelines for the procurement of large-scale construction works using competitive bidding procedures for projects financed by the Millennium Challenge Corporation.
Year:
2024
Region / City:
N/A
Subject:
Procurement, Construction
Document Type:
Standard Bidding Document
Organization / Institution:
Millennium Challenge Corporation (MCC)
Author:
N/A
Target Audience:
Contractors, Procurement Officials
Effective Period:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2011
Region / Location:
Chile, NCSA
Document Type:
Commissioning Plan
Institution:
Large Synoptic Survey Telescope Project
Authors:
Chuck Claver, Christopher Stubbs
Target Audience:
LSST Project Staff, Scientific Community
Period Covered:
2-year commissioning phase
Last Release Date:
August 15, 2011
Change Log:
Versions 1.0–1.2 with updates to schedule, resources, and activity sequences
Related Documents:
LSST Science Requirements Document (LPM-17), LSST System Requirements (LSE-29), LSST Observatory System Specifications (LSE-30), LSST Telescope & Site Subsystem Requirement (LSE-60), LSST Camera Subsystem Requirements (LSE-59), LSST Data Management Subsystem Requirements (LSE-61), Telescope & Site Integration Plan (LTS-104), Camera Integration Plan (LCA-40), Data Management Integration Plan (TBD)
Acronyms Included:
BFP, CCS, DAC, ISR, FPA, LSR, M1M3, M2, SRD, RVC, OCS, OSS, ORR, TCS, WCS
Note:
Year
Subject:
Library Management
Document Type:
Job Description
Year:
Not provided
Region / City:
Not specified
Topic:
Research ethics, manuscript submission
Document type:
Template
Author:
Not specified
Target audience:
Authors submitting research articles
Period of validity:
Not provided
Approval date:
Not specified
Date of changes:
Not specified
Author:
Gregory Dubois-Felsmann
Organization:
Large Synoptic Survey Telescope (LSST) Project
Document identifier:
LSE-82
Related documents:
LSE-81; LPM-17; LSE-29; LSE-30; LDM-138; LDM-141
Document type:
Technical explanation report
Subject area:
Astronomy data management and survey science
Revision date:
August 15, 2011
Revision history:
Versions 1, 1.1, 1.2
Survey duration referenced:
10-year survey
Primary topics:
science estimates; camera specifications; survey cadence; data management sizing; storage and network requirements
Intended use context:
LSST data management and system design
Technical source type:
Project internal technical documentation
Year:
Not applicable
Region / City:
Not applicable
Subject:
Research ethics and manuscript submission
Document Type:
Submission Template
Organization / Institution:
Not applicable
Author:
Not applicable
Target Audience:
Researchers, Authors submitting manuscripts
Period of validity:
Not applicable
Approval Date:
Not applicable
Date of Changes:
Not applicable
Year:
2019
Region / city:
Not specified
Theme:
Obstetric anaesthesia, research funding
Document type:
Application form
Author:
Not specified
Target audience:
Researchers in obstetric anaesthesia
Period of validity:
Not specified
Approval date:
Not specified
Date of changes:
Not specified
Year:
2025
Region / City:
N/A
Subject:
Transmission system load assessment
Document Type:
Overview
Agency / Organization:
Southwest Power Pool, Inc.
Author:
N/A
Target Audience:
Transmission Customers, Transmission Owners
Period of validity:
N/A
Approval Date:
09/03/2025
Date of Amendments:
N/A
Year:
2023
Region / City:
Bhutan
Topic:
Procurement
Document Type:
Standard Bidding Document
Organization / Institution:
Royal Government of Bhutan, Ministry of Finance
Author:
Ministry of Finance
Target Audience:
Bidders
Period of Effect:
From 1st July 2023
Approval Date:
1st July 2023
Date of Last Change:
20th February 2023
Year:
2025
Region / City:
Southwest Power Pool (SPP)
Topic:
Transmission System Load Performance Requirements
Document Type:
Technical Specification
Agency/Institution:
SPP Operations & SPP Planning Policy & Research Team
Author:
SPP Operations & SPP Planning Policy & Research Team
Target Audience:
Energy professionals, power system engineers, technical stakeholders
Period of validity:
Ongoing, subject to updates
Approval Date:
08/15/2025
Revision Date:
07/24/2025
Purpose:
Binding requirements for interconnecting High Impact Large Loads (HILLs) to the SPP Transmission System
Applicability:
HILLs ≥10 MW (≤69 kV) or ≥50 MW (>69 kV)
Document Version:
0.1
Ride-through performance:
Voltage and frequency disturbance tolerance requirements for HILLs and associated resources
Control Methodology:
Power-electronic loads control strategies outlined
Evaluation and Compliance:
Compliance with technical standards for load behavior during voltage and frequency disturbances
Industry Alignment:
Aligns with ERCOT voltage ride-through requirements and NERC frequency standards
Terms and Acronyms:
Includes technical terms and acronyms used in power system operation
Context:
A technical specification outlining performance requirements for large electrical loads (HILLs) to ensure grid stability during voltage and frequency disturbances.
Year:
2025
Region / City:
Vienna, Austria
Subject:
Conference Paper Submission Guidelines
Document Type:
Submission Guidelines
Organization / Institution:
CIE (International Commission on Illumination)
Author:
Smith, M. D.; Johnson, A.B.; Wang, B.C.
Target Audience:
Researchers, Authors, Conference Participants
Period of Validity:
2025
Approval Date:
N/A
Modification Date:
N/A
Keywords:
Photometry, Colour Rendering, CIE, Full-length Paper
Note:
Contextual Description
Year:
2024
Region / City:
United States of America
Subject:
Procurement, Pre-Qualification, Large Works, Construction
Document Type:
Template
Organ / Institution:
Millennium Challenge Corporation (MCC)
Author:
Millennium Challenge Corporation
Target Audience:
Accountable Entities, Procurement Agents, Contractors
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2024
Region / City:
Uganda, Zambia
Theme:
Health capacity building, Global health partnerships, Volunteering
Document Type:
Grant Application Guidelines
Organization / Institution:
NHS England (NHSE), Tropical Health and Education Trust (THET)
Author:
NHS England, Tropical Health and Education Trust
Target Audience:
Health institutions in Uganda, Zambia, and England, NGOs, Health professionals
Period of validity:
2024 - 2025
Approval Date:
January 2024
Date of Changes:
N/A
Year:
2022
Region / City:
Town of Canandaigua
Subject:
Moratorium on Large Scale Solar Energy Systems
Document Type:
Local Law
Authority:
Town of Canandaigua
Target Audience:
Residents and local authorities of Canandaigua
Effective Period:
6 months from the effective date of the law
Approval Date:
2022
Amendments Date:
N/A
Year:
2008
Region / City:
Tasmania
Topic:
Project Closure
Document Type:
Template and Guide
Organization / Institution:
State of Tasmania (Department of Premier and Cabinet)
Author:
State of Tasmania
Target Audience:
Project Sponsors, Steering Committees, Project Managers
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Last Change:
Not specified
Note:
Year
Document Type:
Template
Organ / Institution:
Georgia Department of Natural Resources Environmental Protection Division
Target Audience:
Municipalities, stormwater management entities
Year:
2025
Region / City:
London
Topic:
Procurement
Document Type:
Contract Procurement Notice
Authority:
London LGPS CIV Ltd
Author:
Ian Inglis
Target Audience:
Suppliers in financial services
Effective Period:
January 2026 onwards
Approval Date:
February 2025
Amendment Date:
Not specified
Procurement Procedure:
Competitive Flexible Procedure
Deadline:
11th July 2025, 17:00
Introduction:
Procurement Act 2023
Services Requested:
Fund administration, custody, reporting, performance measurement
Client:
London Local Government Pension Schemes (LGPS)
Appendices:
Terms, conditions, and service levels
Jurisdiction:
Oregon
Region:
State of Oregon
Document type:
Checklist
Subject:
Public procurement and contracting
Procurement method:
Competitive Sealed Proposals (RFP)
Governing authorities:
Oregon statute; DOJ Model Rules; DAS rules
Issuing bodies:
DAS Procurement Services; Oregon Attorney General’s Office
Related manual:
Oregon Procurement Manual
Intended users:
Agency procurement professionals; DAS Procurement Services staff
Scope:
Development, verification, evaluation, and award of RFPs
Compliance requirements:
Oregon tax law compliance (ORS 305.385); non-discrimination requirements
Procurement phases covered:
Solicitation development; proposal submission; evaluation; award; negotiation; contract execution
Administrative elements:
Submission formats; deadlines; protests; addenda; certifications
Year:
2025
Region / City:
Maryland, USA
Topic:
Energy, Local Government Grants, Electrification
Document Type:
Application Form
Organization:
Maryland Energy Administration (MEA)
Author:
Maryland Energy Administration
Target Audience:
Local Governments in Maryland
Period of Validity:
2025-2026
Approval Date:
N/A
Amendment Date:
N/A
Year:
2025-2026
Region / city:
Rockville, Chesapeake Region
Subject:
Volleyball, Club Sports
Document Type:
Parent/Player Contract
Organization / Institution:
Rockville Volleyball Academy
Author:
Rockville Volleyball Academy
Target Audience:
Parents and players of the Rockville Volleyball Academy
Period of validity:
November 2025 - June 2026
Approval Date:
Not specified
Modification Date:
Not specified