№ lp_1_2_11910
File format: docx
Character count: 35076
File size: 44 KB
This document is a template for creating a Stormwater Management Program (SWMP) for MS4s, outlining the requirements for compliance with NPDES permits and providing necessary components for SWMP development and submission.
Note:
Year
Document Type:
Template
Organ / Institution:
Georgia Department of Natural Resources Environmental Protection Division
Target Audience:
Municipalities, stormwater management entities
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2022-23
Permit Registrant:
City of Turner
Date Prepared/Submitted:
Oct. 31, 2023
Note:
DEQ File No.
Permit Registrant(s):
City of Turner
Legally Authorized Representative:
Scott McClure
Title:
City Administrator
Email:
[email protected]
Phone:
503-743-2155
Type(s):
City
Registrant Type:
Existing Registrant
Community Type:
Small Community
DEQ Permit No:
113607
EPA File No:
ORS113607
Physical Address:
5255 Chicago St.
City:
Turner
State:
Oregon
Zip:
97392
Area served by MS4:
1.45 square miles
Population served by MS4:
2,944
Receiving Waterbody:
Mill Creek
Impaired waterbody:
Yes
Impairment(s):
Bacteria, Temperature, Mercury
Public Education and Outreach:
Development Services Clerk/City Clerks conduct public education on stormwater discharge impacts.
Document type:
Annual regulatory report form
Program:
NPDES Stormwater Program
Permit type:
Phase II MS4 Generic Permit
Regulatory framework:
Florida Administrative Code subsection 62-621.300(7)(a)
Jurisdiction:
Florida, United States
Responsible authority:
MS4 Operator
Reporting cycle:
Annual
Permit year:
Years 1–5
Submitting authority:
NPDES Stormwater Notice Center
Submission format:
Electronic or paper
Subject area:
Municipal stormwater management
Key components:
Public education and outreach, public involvement, illicit discharge detection and elimination
Year:
2023
Region / City:
Springfield
Subject:
Urban planning, stormwater management
Document Type:
Legislative amendment proposal
Organization / Institution:
City of Springfield
Author:
Springfield Development Code Team
Target Audience:
Urban planners, developers, local government officials
Effective Period:
Ongoing
Approval Date:
June 13, 2023
Amendment Date:
June 13, 2023
Jurisdiction:
West Virginia
Program:
National Pollutant Discharge Elimination System (NPDES)
Permit number:
WV0116025
Permit type:
MS4 General Permit
Issuing authority:
West Virginia Department of Environmental Protection
Division:
Division of Water and Waste Management – MS4 Program
Document type:
Site registration application form
Regulated entities:
Small municipal separate storm sewer systems (MS4s)
Applicants:
Local governments and other regulated entities
Date of permit issuance:
June 22, 2009
Regulatory reference:
47CSR10
Submission requirement:
Two copies by mail
Subject matter:
Stormwater management program compliance and reporting
Year:
2025
Region / City:
Massachusetts
Topic:
Environmental Protection, Municipal Assistance Grant
Document Type:
Agency Document
Agency / Institution:
Massachusetts Department of Environmental Protection (MassDEP)
Author:
Not specified
Target Audience:
Municipalities, MS4 permittees
Effective Period:
FY26
Approval Date:
September 2, 2025
Modification Date:
September 26, 2025
Year:
2010
Month:
August
Region:
Minnesota
Country:
United States
Issuing organization:
Minnesota Pollution Control Agency (MPCA)
Program:
Stormwater Program; TMDL Program
Legal framework:
National Pollutant Discharge Elimination System (NPDES); Clean Water Act
Regulatory references:
40 CFR 130.2; 40 C.F.R. 122.44(d)(1)(vii)(B)
Subject:
Wasteload Allocation (WLA) for MS4 stormwater discharges
Document type:
Policy guidance
Scope:
Municipal Separate Storm Sewer Systems (MS4)
Applies to:
Regulated municipalities, townships, counties, watershed districts, MnDOT, nontraditional MS4 entities
Urban areas referenced:
Minneapolis–St. Paul; Rochester; Fargo–Moorhead; St. Cloud; Duluth; La Crosse–La Crescent; Grand Forks–East Grand Forks
Census basis:
2000 U.S. Census
Jurisdiction:
State of Utah
Legal Basis:
Utah Code 19-5-108.3
Regulatory Framework:
MS4 Permit; UPDES Storm Water General Permit; Construction General Permit (CGP); Common Plan Permit (CPP)
Subject:
Storm Water Runoff Control for Construction Activities
Document Type:
Standard Operating Procedure
Issuing Authority:
Municipal Separate Storm Sewer Systems (MS4s) in Utah
Responsible Oversight Entity:
MS4 Storm Water Staff
Enforcement Authority:
MS4 with authority to implement enforcement procedures; Division of Water Quality (DWQ)
Applies To:
Construction sites ≥ one acre or part of a common plan of development disturbing ≥ one acre
Inspection Types:
Electronic Oversight Inspection; Onsite Oversight Inspection
Inspection Frequency:
Monthly for non-priority sites; Biweekly for priority sites
Personnel Requirements:
Qualified person as defined in the DWQ MS4 Permit; Annual training required
Pre-Construction Requirements:
SWPPP review; Pre-construction meeting; Pre-construction inspection; Notice of Intent (NOI) submission via NeT NPDES eReporting Tool
During Construction Requirements:
Review of SWPPP, BMPs, discharge points, perimeter controls, inspection reports, and compliance documentation
Post-Construction Requirements:
Notice of Termination (NOT) submission; Final stabilization verification; NOT inspection documentation
Record Retention Period:
Minimum five years or until construction completion, whichever is longer
Referenced Forms:
Oversight Construction Inspection Form; State Storm Water NOT Inspection Form
Year:
2025
Region / City:
TCEQ Region 4, Fort Worth, Texas
Document Type:
Annual MS4 Report
Organization:
Tarrant County College District
MS4 Operator Level:
Level 2
Permit Number:
TXR040000
Authorization Number:
TXR040641
Reporting Period:
01/24/2025 – 11/10/2025
Compliance Status:
In compliance with SWMP and permit requirements
BMPs Implemented:
Public Education, Illicit Discharge Detection, Construction Site Control, Post-Construction Management, Pollution Prevention
Contact Name:
Alisha Lagrini
Contact Email:
[email protected]
Contact Phone:
817-653-5992
Reporting Type:
Calendar Year / Permit Year
Authorization Number:
TXR040645
Permit:
TPDES General Permit TXR040000
MS4 Name:
Tarrant County College District Trinity River Campus MS4
MS4 Operator Level:
Level 2
Reporting Year:
Year 7
Reporting Period Beginning Date:
January 24, 2025
Reporting Period End Date:
November 10, 2025
Annual Reporting Option:
Permit Year
Contact Name:
Alisha Lagrini
Telephone Number:
817-653-5992
Mailing Address:
5450 North Riverside Drive, Fort Worth, Texas 76137
Email Address:
[email protected]
Regulatory Authority Region:
TCEQ Region 4
Compliance Status with SWMP:
In compliance
Compliance with Recordkeeping and Reporting Requirements:
Confirmed
Stormwater Management Program Review:
Conducted during annual report preparation
Major Control Measures:
Public Education and Outreach; Illicit Discharge Detection and Elimination; Construction Site Stormwater Runoff Control; Post-Construction Stormwater Management; Pollution Prevention and Good Housekeeping for Municipal Operations
Best Management Practices Evaluated:
Public events and education materials; storm sewer mapping and inspections; construction site policies and inspections; post-construction inspection and design guidelines; municipal facility maintenance and training
Year:
2023
Region / City:
Texas, USA
Subject:
Stormwater Discharge Management
Document Type:
Application Form
Organization / Institution:
Texas Commission on Environmental Quality (TCEQ)
Author:
Texas Commission on Environmental Quality (TCEQ)
Target Audience:
Municipal authorities, environmental compliance officers, permit applicants
Effective Period:
Not specified
Approval Date:
Not specified
Revision Date:
Not specified
Contact Information:
Available in document
Application Fee:
$400
Payment Methods:
Online, Mail
Permit Type:
General Permit MS4 Phase II
Program:
Stormwater Management Program (SWMP)
Discharge Information:
Receiving waterbody names and classified segment numbers not specified
Level of MS4:
Varies by population size
Annual Reporting:
Calendar year or MS4 Fiscal year
Compliance Certification:
SWMP requirements verified by applicant
Year:
2023
Region / City:
Florida
Theme:
Environmental Protection, Stormwater Management
Document Type:
Government Notice
Agency / Organization:
NPDES Stormwater Program
Author:
NPDES Stormwater Program
Target Audience:
Municipal and Local Government Authorities, Environmental Agencies
Effective Period:
Ongoing until further notice
Approval Date:
Not specified
Date of Changes:
Not specified
Note:
Year
Subject:
Stormwater Management
Document Type:
Report
Year:
2011
Region / Location:
Chile, NCSA
Document Type:
Commissioning Plan
Institution:
Large Synoptic Survey Telescope Project
Authors:
Chuck Claver, Christopher Stubbs
Target Audience:
LSST Project Staff, Scientific Community
Period Covered:
2-year commissioning phase
Last Release Date:
August 15, 2011
Change Log:
Versions 1.0–1.2 with updates to schedule, resources, and activity sequences
Related Documents:
LSST Science Requirements Document (LPM-17), LSST System Requirements (LSE-29), LSST Observatory System Specifications (LSE-30), LSST Telescope & Site Subsystem Requirement (LSE-60), LSST Camera Subsystem Requirements (LSE-59), LSST Data Management Subsystem Requirements (LSE-61), Telescope & Site Integration Plan (LTS-104), Camera Integration Plan (LCA-40), Data Management Integration Plan (TBD)
Acronyms Included:
BFP, CCS, DAC, ISR, FPA, LSR, M1M3, M2, SRD, RVC, OCS, OSS, ORR, TCS, WCS
Note:
Year
Subject:
Library Management
Document Type:
Job Description
Year:
Not provided
Region / City:
Not specified
Topic:
Research ethics, manuscript submission
Document type:
Template
Author:
Not specified
Target audience:
Authors submitting research articles
Period of validity:
Not provided
Approval date:
Not specified
Date of changes:
Not specified
Author:
Gregory Dubois-Felsmann
Organization:
Large Synoptic Survey Telescope (LSST) Project
Document identifier:
LSE-82
Related documents:
LSE-81; LPM-17; LSE-29; LSE-30; LDM-138; LDM-141
Document type:
Technical explanation report
Subject area:
Astronomy data management and survey science
Revision date:
August 15, 2011
Revision history:
Versions 1, 1.1, 1.2
Survey duration referenced:
10-year survey
Primary topics:
science estimates; camera specifications; survey cadence; data management sizing; storage and network requirements
Intended use context:
LSST data management and system design
Technical source type:
Project internal technical documentation
Year:
Not applicable
Region / City:
Not applicable
Subject:
Research ethics and manuscript submission
Document Type:
Submission Template
Organization / Institution:
Not applicable
Author:
Not applicable
Target Audience:
Researchers, Authors submitting manuscripts
Period of validity:
Not applicable
Approval Date:
Not applicable
Date of Changes:
Not applicable
Year:
2019
Region / city:
Not specified
Theme:
Obstetric anaesthesia, research funding
Document type:
Application form
Author:
Not specified
Target audience:
Researchers in obstetric anaesthesia
Period of validity:
Not specified
Approval date:
Not specified
Date of changes:
Not specified
Year:
2025
Region / City:
N/A
Subject:
Transmission system load assessment
Document Type:
Overview
Agency / Organization:
Southwest Power Pool, Inc.
Author:
N/A
Target Audience:
Transmission Customers, Transmission Owners
Period of validity:
N/A
Approval Date:
09/03/2025
Date of Amendments:
N/A
Year:
2023
Region / City:
Bhutan
Topic:
Procurement
Document Type:
Standard Bidding Document
Organization / Institution:
Royal Government of Bhutan, Ministry of Finance
Author:
Ministry of Finance
Target Audience:
Bidders
Period of Effect:
From 1st July 2023
Approval Date:
1st July 2023
Date of Last Change:
20th February 2023