№ lp_1_12027
File format: docx
Character count: 7345
File size: 38 KB
Application form for the FY26 Local Government Energy Modernization (L-GEM) grant program, detailing required fields for project submissions including contact details, project scope, and necessary supporting documents.
Year:
2025
Region / City:
Maryland, USA
Topic:
Energy, Local Government Grants, Electrification
Document Type:
Application Form
Organization:
Maryland Energy Administration (MEA)
Author:
Maryland Energy Administration
Target Audience:
Local Governments in Maryland
Period of Validity:
2025-2026
Approval Date:
N/A
Amendment Date:
N/A
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2026
Region / City:
Shariatpur
Topic:
Procurement, Infrastructure, Public Works
Document Type:
Tender Notice
Organization / Institution:
Public Works Department (PWD), Shariatpur PWD Division
Author:
Sharmin Aktar
Target Audience:
Contractors, Tenderers
Period of Validity:
20-Jan-2026 to 30-Mar-2026
Approval Date:
18-Jan-2026
Amendment Date:
-
Project Code:
PFD/HEF3122025
Project Name:
Implementation of essential incomplete work of PFD, HEF, IFM, HRD and SWPMM
Procurement Nature:
Goods
Procurement Type:
NCT
Tender Reference No:
Memo no.326(4)
Category:
Electricity, External Electrification
Description:
Public procurement document for tendering the external electrification work as part of the upgradation and renovation of Shariatpur District Hospital.
Year:
2082/83
Region / city:
Bardiya National Park
Topic:
Solar Power System Installation
Document Type:
Technical Specifications
Organization:
LI-BIRD
Author:
Not specified
Target Audience:
Suppliers, contractors, vendors
Period of Action:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2026
Region / City:
Maryland
Topic:
Local government energy modernization, grant application process
Document Type:
Grant application guidelines
Organization:
Maryland Energy Administration (MEA)
Author:
Maryland Energy Administration (MEA)
Target Audience:
Local government entities in Maryland
Period of Action:
FY26
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2025
Region / City:
California
Theme:
Vehicle Electrification, Energy Resources, Charging Infrastructure
Document Type:
Funding Opportunity
Organization:
California Energy Commission
Author:
California Energy Commission
Target Audience:
Entities interested in commercial electric vehicle charging and energy systems integration
Period of Validity:
September 2025
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2021
Region / city:
Tangerang
Topic:
Medium voltage switchgear
Document type:
Price list
Organization / institution:
ABB Electrification Products Division
Author:
ABB
Target audience:
Engineers, procurement managers
Period of validity:
Until February 2022
Approval date:
Not provided
Date of amendments:
Not provided
Year:
2024
Region / City:
San Diego, CA
Topic:
Energy, Electrification, Residential Programs
Document Type:
Proposal Request
Organization / Institution:
San Diego Gas & Electric Company
Author:
San Diego Gas & Electric Company
Target Audience:
Residential customers, Contractors, Service Providers
Period of Effectiveness:
August 2024
Approval Date:
N/A
Date of Changes:
N/A
Company:
ABB Electrification Products Division
Product Line:
UniSec Medium Voltage Switchgear
Document Type:
Price List and Technical Specification
Year:
2021
Validity Period:
Until February 2022
Delivery Term:
Ex-work ABB Tangerang Factory
Warranty Period:
18 months from delivery or 12 months from commissioning
Applicable Standard:
IEC 62271-200
Rated Voltage:
24kV
Service Voltage:
20kV
Rated Current:
630A
Rated Short Circuit Current:
16kA
Frequency:
50Hz
Degree of Protection:
IP3X
Internal Arc Classification:
IAC AFL
Country:
Indonesia
Factory Location:
Tangerang
Contact Phone:
+62 21 8060 0634
Contact Email:
[email protected]
Year:
Not specified
Region / City:
Not specified
Document Type:
Technical guideline
Organization:
Not specified
Target Audience:
Field Units, Maintenance Staff, Electrical Technicians
Scope:
Renovation, upgradation, and restoration of electrical installations in depots and ancillary buildings
Reference Standards:
CPWD specifications, ISI standards
Applicable Areas:
Labour Shed, Depot Office, QC Lab, Godown Unit Office, Tiffin Room/Canteen, Pump Room, Security Office, Switch Room
Electrical Components Covered:
Wiring, PVC/steel conduits, modular switches and sockets, distribution boards
Purpose:
Maintaining operational standards and aesthetic improvements of electrical installations
Year:
2024
Region / City:
California
Topic:
Energy, Utility Interconnection
Document Type:
Resolution
Agency / Institution:
Public Utilities Commission of the State of California
Author:
Pacific Gas and Electric Company
Target Audience:
Energy industry professionals, utility companies, transportation authorities
Period of Action:
March 7, 2024
Approval Date:
March 7, 2024
Date of Amendments:
N/A
Year:
2023
Organization:
World Bank
Initiative:
Global Electrification Platform (GEP)
Version:
3.0
Geographical Scope:
Sub-Saharan Africa
Country Coverage:
58 countries
Scenarios:
96 scenarios
Thematic Focus:
Electrification planning, power generation optimization, greenhouse gas emissions
Related Model:
Electricity Model Base for Africa (TEMBA)
Modelling Framework:
Open Source Spatial Electrification Tool (OnSSET); Open-Source Energy Modelling System (OSeMOSYS)
Subject:
Grid generation cost estimation and emissions associated with SDG7.1.1
Time Horizon:
2018–2040
Target Year:
2030
Indicator:
SDG7.1.1 (Universal access to electricity)
Technology Scope:
Centralized grid, mini-grids, solar home systems (SHS)
Key Metrics:
Levelized Cost of Electricity (LCOE), grid emission factor, technology mix, investment requirements
Carbon Pricing:
Inclusion of shadow price of carbon in scenario analysis
Year:
2021
Region / City:
Tangerang, Indonesia
Theme:
Medium Voltage Switchgear
Document Type:
Price List
Organization:
ABB Electrification Products Division
Author:
ABB
Target Audience:
Industry professionals and engineers involved in switchgear procurement and installation
Period of Validity:
Until February 2022
Approval Date:
Not specified
Date of Modifications:
Not specified
Year:
2013
Topic:
Rural Electrification
Document Type:
Project Restructuring Report
Institution:
World Bank
Author:
Veasna Bun, Julia M. Fraser, Ulrich Zachau
Target Audience:
Project Stakeholders, World Bank Management
Period of Action:
2010-2015
Approval Date:
01/12/2010
Date of Modifications:
11/25/2013
Completion Date:
06/30/2014
Proposed Closing Date:
06/30/2015
Disbursement:
20.45 million USD
EA Category:
B-Partial Assessment
Revised EA Category:
B-Partial Assessment
Policy Exceptions:
No
Safeguard Policies:
No
Development Objectives:
Increase rural household access to electricity and improve the financial performance of EdL.
Year:
2023
Region / State:
United States
Document Type:
Application Guidance / Checklist
Agency:
Department of Energy (DOE)
Programs Covered:
Home Efficiency Rebates (50121), Home Electrification & Appliance Rebates (50122)
Version:
1.1
Publication Date:
October 13, 2023
Modification Note:
Added two items to checklist table on page 2
Target Audience:
State Program Officers and ALRD Applicants
Submission Requirements:
Standard Forms 424 and 424A, Planned Activities, Budget Justification, Pre-Award Information, Narrative Document, Data and Tools Requirements
Launch Timeline:
States must submit Implementation Blueprint at least 90 days prior to planned rebate program
Checklist Type:
Optional, identifies which application requirements are submitted
Year:
2012–Present
Region / City:
West Bengal, India
Field:
Electrical Engineering, Rural Electrification
Document Type:
Curriculum Vitae / Resume
Organization:
RIVU Infrastructural Developers Pvt. Ltd.; Technofab Engineering Limited
Author:
Pijush Bhattacharyya
Target Audience:
Employers in Engineering and Construction Sector
Education:
Graduate in Arts (Economics & Geography) from Burdwan University; Certification in Financial Accounting with Tally from IMHT; Pursuing Post Graduate Diploma in Materials Management from Annamalai University
Professional Experience:
Planning, Billing, Materials Reconciliation, Documentation, Project Execution in HT & LT Lines, Transformers, Service Connections
Skills:
Financial accounts management, Documentation & Billing, Project Planning, Material Estimation, Team Leadership, Communication, Analytical problem-solving
Projects:
Rural Electrification under W.B.S.E.D.C.L. in Backward Region Grant Fund scheme in Dakshin Dinajpur and Purulia
Languages Known:
English, Hindi, Bengali
Date of Birth:
04-06-1991
Contact:
[email protected]
Note:
, +91-9874971600
Year:
2022
Region / City:
KZN Operating Unit, Central East Cluster
Theme:
Electrification, Tender Agreement
Document Type:
Tender Enquiry
Organization / Institution:
Distribution Division
Author:
Not specified
Target Audience:
Contractors, BBBEE EME Level 1 or Level 2 companies
Period of Validity:
30 months
Approval Date:
Not specified
Amendment Date:
Not specified
Tender Enquiry Number:
KZN055
Clarification Meeting Date:
08 November 2022
Link to Clarification Meeting:
MS Teams link
Context:
A tender document outlining the requirements for an enabling agreement with a maximum panel of 30 contractors for electrification projects in low-value household and infill connections.