№ lp_1_12771
File format: docx
Character count: 12422
File size: 272 KB
Year:
2025
Region / City:
Southwest Power Pool (SPP)
Topic:
Transmission System Load Performance Requirements
Document Type:
Technical Specification
Agency/Institution:
SPP Operations & SPP Planning Policy & Research Team
Author:
SPP Operations & SPP Planning Policy & Research Team
Target Audience:
Energy professionals, power system engineers, technical stakeholders
Period of validity:
Ongoing, subject to updates
Approval Date:
08/15/2025
Revision Date:
07/24/2025
Purpose:
Binding requirements for interconnecting High Impact Large Loads (HILLs) to the SPP Transmission System
Applicability:
HILLs ≥10 MW (≤69 kV) or ≥50 MW (>69 kV)
Document Version:
0.1
Ride-through performance:
Voltage and frequency disturbance tolerance requirements for HILLs and associated resources
Control Methodology:
Power-electronic loads control strategies outlined
Evaluation and Compliance:
Compliance with technical standards for load behavior during voltage and frequency disturbances
Industry Alignment:
Aligns with ERCOT voltage ride-through requirements and NERC frequency standards
Terms and Acronyms:
Includes technical terms and acronyms used in power system operation
Context:
A technical specification outlining performance requirements for large electrical loads (HILLs) to ensure grid stability during voltage and frequency disturbances.
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2025
Region / City:
N/A
Subject:
Voltage and frequency ride-through requirements for High Impact Large Loads (HILLs)
Document Type:
Technical Specification
Organization:
SPP Operations
Author:
Daniel Baker, Mostafa Sedighizadeh
Target Audience:
Industry stakeholders, Transmission Customers
Effective Period:
N/A
Approval Date:
2025-08-04
Revision Date:
2025-08-04
Reference number:
RFB 3024/2024
Document type:
Bid specification annexure
Procuring entity:
South African Police Service (SAPS)
Implementing agency:
State Information Technology Agency (SITA)
Country:
South Africa
Year:
2024
Subject matter:
Procurement of F5 load balancers and related services
Products covered:
F5 VELOS hardware, software, licenses and add-ons
Services included:
Maintenance, support and professional services
Service period:
Five years (60 months)
Scope of work:
Supply, design, installation, configuration and support of load balancing and application security solutions
Delivery locations:
SITA Centurion, SITA Beta, Pretoria
Evaluation framework:
Mandatory administrative, technical and contractual evaluation stages
Related annexes:
Annex A (Bidder substantiating evidence), Annex B (Addendum 1)
Year:
2020
Region / City:
Georgia
Subject:
Renewable energy procurement program
Document Type:
Regulatory Order
Agency / Organization:
Georgia Public Service Commission
Author:
Georgia Power
Target Audience:
Commercial and Industrial customers
Effective Period:
From 2020 onward
Approval Date:
January 23, 2020
Amendment Date:
N/A
Note:
Year
Subject:
Load Aggregation Point selection
Document type:
Instructional document
Organization / institution:
California Independent System Operator
Target audience:
Scheduling Coordinators, Load Serving Entities
Year:
2025
Region / City:
N/A
Subject:
Transmission system load assessment
Document Type:
Overview
Agency / Organization:
Southwest Power Pool, Inc.
Author:
N/A
Target Audience:
Transmission Customers, Transmission Owners
Period of validity:
N/A
Approval Date:
09/03/2025
Date of Amendments:
N/A
Year:
Not specified
Region / City:
Not specified
Topic:
Crane operation, safety protocols, risk assessment
Document Type:
Safety procedure
Organization / Institution:
MPC
Author:
Not specified
Target Audience:
Employees or contractors of MPC
Period of validity:
Not specified
Approval Date:
Not specified
Revision Date:
Not specified
Document type:
Regulatory guidance
Subject area:
Stormwater management
Program:
Municipal Regional Permit
Provision:
C.10 Trash Load Reduction
Fiscal year:
2024–2025
Regulatory authority:
Regional Water Board
Permittees:
Population-based Permittees; Flood Management Agencies
Compliance benchmarks:
100% trash load reduction
Key topics:
Trash load reduction calculation; full trash capture systems; control measures; compliance status reporting
Applicable entities:
Municipal agencies and flood management agencies
Geographic scope:
Jurisdictional areas generating Very High, High, or Moderate trash levels
Source type:
Permit reporting guidance
Year:
2024
Region / City:
California
Topic:
Renewables Portfolio Standard (RPS), Renewable Energy Credits (REC)
Document Type:
Guidance
Organization / Institution:
California Energy Commission (CEC)
Author:
California Energy Commission (CEC)
Target Audience:
Load Serving Entities (LSEs), Retail Sellers, Publicly Owned Electric Utilities (POU)
Effective Period:
2024
Approval Date:
Not specified
Modification Date:
Not specified
Registered Entity:
Registered name of entity being audited
NCR Number:
NCRnnnnn
Compliance Enforcement Authority:
Region or NERC performing audit
Compliance Assessment Date(s):
Month DD, YYYY, to Month DD, YYYY
Compliance Monitoring Method:
[On-site Audit | Off-site Audit | Spot Check]
Names of Auditors:
Supplied by CEA
Applicability of Requirements:
BA, DP, GO, GOP, PA/PC, RC, RP, RSG, TO, TOP, TP, TSP
Requirements Covered:
D.B.1, D.B.2, D.B.3, D.B.4, R6, R7, R8, R9, R10, D.B.11, D.B.12
UFLS Entities Definition:
Distribution Providers, UFLS-Only Distribution Providers, Transmission Owners, and Transmission Owners that own Elements identified in the UFLS program
Supporting Evidence:
Compliance narratives, reports, memorandums, emails, and other documentation demonstrating compliance with PRC-006-5 requirements
Subject Matter Experts:
SME Name, Title, Organization, Requirement(s)
Compliance Assessment Approach:
Verification of joint regional review participation, island identification, and UFLS program adoption within Western Interconnection
Time Horizon:
Long-term Planning
VRF Level:
Medium
Year:
2019
Region / City:
N/A
Subject:
Committee Structure, Strategic Planning, Faculty Review
Document Type:
Report
Organization / Institution:
N/A
Author:
N/A
Target Audience:
Faculty Members
Effective Period:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Note:
Year
Year:
2025
Region / city:
SPP
Topic:
Energy, Power Generation, Grid Interconnection
Document Type:
Report
Organization / Institution:
SPP
Author:
SPP
Target Audience:
Utility companies, energy producers, transmission operators
Effective Period:
2025-2026
Approval Date:
2025-10-24
Revision Date:
2025-11-25
Context:
A report outlining the High Impact Large Load Generator Assessment (HILLGA) process, its requirements, and its impact on the existing power grid interconnection procedures.
Year:
2025
Region / City:
California
Theme:
Energy, Forecasting, Grid Operations, Renewable Energy
Document Type:
Grant Funding Opportunity
Organization:
California Energy Commission
Author:
California Energy Commission
Target Audience:
Researchers, Utilities, Energy Market Participants, Policy Makers
Period of Validity:
October 2025 onwards
Approval Date:
October 2025
Date of Modifications:
N/A
Year:
2012
Region / city:
North America
Topic:
Energy management, Balancing Authority, Contingency Reserve
Document type:
Comment form
Organization / institution:
BARC SDT
Author:
N/A
Target audience:
Energy professionals, Balancing Authorities, Reserve Sharing Groups
Period of validity:
N/A
Approval date:
N/A
Amendment date:
N/A
Year:
2025
Region / City:
N/A
Subject:
Voltage and frequency ride-through requirements for High Impact Large Loads (HILLs)
Document Type:
Technical Specification
Organization:
SPP Operations
Author:
Daniel Baker, Mostafa Sedighizadeh
Target Audience:
Industry stakeholders, Transmission Customers
Effective Period:
N/A
Approval Date:
2025-08-04
Revision Date:
2025-08-04
Year:
2011
Region / Location:
Chile, NCSA
Document Type:
Commissioning Plan
Institution:
Large Synoptic Survey Telescope Project
Authors:
Chuck Claver, Christopher Stubbs
Target Audience:
LSST Project Staff, Scientific Community
Period Covered:
2-year commissioning phase
Last Release Date:
August 15, 2011
Change Log:
Versions 1.0–1.2 with updates to schedule, resources, and activity sequences
Related Documents:
LSST Science Requirements Document (LPM-17), LSST System Requirements (LSE-29), LSST Observatory System Specifications (LSE-30), LSST Telescope & Site Subsystem Requirement (LSE-60), LSST Camera Subsystem Requirements (LSE-59), LSST Data Management Subsystem Requirements (LSE-61), Telescope & Site Integration Plan (LTS-104), Camera Integration Plan (LCA-40), Data Management Integration Plan (TBD)
Acronyms Included:
BFP, CCS, DAC, ISR, FPA, LSR, M1M3, M2, SRD, RVC, OCS, OSS, ORR, TCS, WCS
Note:
Year
Subject:
Library Management
Document Type:
Job Description
Year:
Not provided
Region / City:
Not specified
Topic:
Research ethics, manuscript submission
Document type:
Template
Author:
Not specified
Target audience:
Authors submitting research articles
Period of validity:
Not provided
Approval date:
Not specified
Date of changes:
Not specified
Author:
Gregory Dubois-Felsmann
Organization:
Large Synoptic Survey Telescope (LSST) Project
Document identifier:
LSE-82
Related documents:
LSE-81; LPM-17; LSE-29; LSE-30; LDM-138; LDM-141
Document type:
Technical explanation report
Subject area:
Astronomy data management and survey science
Revision date:
August 15, 2011
Revision history:
Versions 1, 1.1, 1.2
Survey duration referenced:
10-year survey
Primary topics:
science estimates; camera specifications; survey cadence; data management sizing; storage and network requirements
Intended use context:
LSST data management and system design
Technical source type:
Project internal technical documentation