№ lp_1_2_36335
File format: docx
Character count: 10436
File size: 279 KB
This document provides a detailed guide for specifying primary unit substations as part of a CSI-compliant construction document, including technical requirements for equipment, installation, and testing.
Year:
2023
Region / City:
N/A
Topic:
Electrical Equipment Specifications
Document Type:
Guide Specification
Organization:
Eaton
Author:
N/A
Target Audience:
Specwriters, Engineers
Period of Validity:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2015
Region / City:
New Delhi
Subject:
Transmission Service Provider Selection
Document Type:
Request for Qualification (RFQ)
Organization:
PFC Consulting Limited
Author:
PFC Consulting Limited
Target Audience:
Bidders for Transmission Service Provider
Period of Validity:
N/A
Approval Date:
October 15, 2015
Amendment Date:
N/A
Year:
Not specified
Region / City:
Not specified
Topic:
Oil Stop Valves, Environmental Protection, Water Flow Systems
Document Type:
Technical Specification
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Engineers, Environmental Specialists, Contractors
Effective Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Context:
This technical specification outlines the minimum requirements for the design, installation, and performance of oil stop valves used in storm drains and similar systems for environmental protection against hydrocarbon contamination.
Year:
2012
Region / City:
Steelpoort, Phalaborwa
Topic:
Environmental assessment, Vegetation diversity
Document Type:
Report
Organization:
Nsovo Environmental Consulting
Author:
G.J. Bredenkamp
Target Audience:
Environmental specialists, ecologists, local government authorities
Period of validity:
2012
Approval Date:
March 2012
Date of Changes:
N/A
Year:
2018
Country:
Iraq
City / Region:
West Mosul
Development Area:
Power
Document Type:
Invitation to Bid
Procurement Process:
ITB – Invitation to Bid
Reference Number:
44101
Project:
Funding Facility for Expanded Stabilization
Atlas Project ID:
00100013
Issuing Organization:
United Nations Development Programme (UNDP)
Office:
UNDP Country Office – Iraq
Authorizing Official:
Anas Payyad Qarman
Position:
Operations Manager
Deadline for Bid Submission:
08 March 2018
Date Posted:
12 February 2018
Subject:
Rehabilitation of Badoosh 132 kV Substations
Submission Method:
UNDP eTendering online system
Related Institution:
Ministry of Electricity, Iraq
Year:
2013
Region / City:
New York, USA
Subject:
Cable system design, installation, and protection in substations
Document Type:
Draft IEEE Standard
Organization:
IEEE Power and Energy Society
Author:
IEEE Substations Committee
Target Audience:
Standards developers, engineers
Period of Validity:
Unapproved draft, subject to change
Approval Date:
Not approved yet
Date of Changes:
Not applicable
Year:
2024–2025
Region / City:
Eaton County, Michigan, USA
Document Type:
Work Program Template
Organization:
Michigan Department of Environment, Great Lakes, and Energy (EGLE)
Author:
Jared Bogdanov-Hanna
Target Audience:
County materials management planning committee, local government units, stakeholders
Approval Date:
March 11, 2025
Contact Email:
[email protected]
Contact Phone:
(517) 525-5223
Key Activities:
Planning, MMP development, public participation, data collection, recycling education, reporting, implementation
Year:
2016
Region / City:
Austin, Texas
Subject:
Maintenance of UPS and PDU Systems
Document Type:
Pre-Solicitation Notice
Agency:
Department of Veterans Affairs
Author:
Justin Helfman
Target Audience:
Contractors, Service Providers
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
Not specified
Region / Location:
Not specified
Subject:
Electrical equipment, manual transfer switches
Document type:
Technical specification / Guide specification
Organization:
Eaton
Standards:
UL 1008, CSA C22.2 No. 178, UL 991, NFPA 70, NFPA 99, NFPA 110, NEMA ICS 10, IEEE 446
Certification:
ISO 9001 or ISO 9002 manufacturer certification, seismic certification as specified
Intended audience:
Engineers, contractors, specification writers
Equipment type:
Low voltage manual transfer switches, molded case type
Installation:
Seismic mounting requirements, field measurements, handling and storage instructions
Submittals:
Product data sheets, schematics, drawings, test reports, installation manuals
Construction:
UL 1008 listed, double throw, mechanical interlocks, fixed mount, molded case switches or circuit breakers
Note:
Year
Topic:
Battery systems, UPS
Document Type:
Guide Specification
Organization / Institution:
Eaton
Target Audience:
Specwriters, Engineers
Note:
Year
Note:
Year
Document Type:
Guide Specification
Agency / Institution:
Eaton
Target Audience:
Specwriters, Engineers
Opening Date:
Currently Open
Closing Date:
Open Until Filled
Note:
Minimum Qualifications
Attn:
Chief Larry Joe Weeks
Year:
2025
Region / City:
Eaton County, Lansing
Subject:
Human services, housing, emergency solutions grants
Document Type:
Meeting minutes
Organization / Institution:
Eaton County Human Services Collaborative Council
Author:
K. Dempsey (Chair), various members of the council
Target Audience:
Council members, human services professionals
Effective Date:
May 12, 2025
Approval Date:
May 12, 2025
Amendment Date:
May 12, 2025
Funding Information:
Various grants and allocations for housing, emergency solutions, and shelter programs
Year:
2025
Location:
Luton, Bedfordshire, UK
Subject:
Property inspection and structural assessment
Document Type:
Structural report
Client:
Mr Sam Allen
Engineer:
P R Carruthers BSc (Hons), CEng, MICE, MIStructE, ACIOB, FFB, FGS, FASI
Property Type:
Mid-terraced two-storey modular house (Jensel type)
Inspection Date:
21 May 2025
Weather Conditions:
Dry and mild
Issues Addressed:
Support beam above rear dining room opening, subsidence risk
Construction Details:
Precast columns, steel lattice beams, modular curtain walls, pitched modular roof
Findings:
Structural integrity confirmed, no evidence of subsidence or damage
Recommendations:
Maintain watertight drains, consult before planting trees
Year:
2026
Region / City:
Not specified
Topic:
Low Voltage Switchgear Specification
Document Type:
Guide Specification
Organization / Institution:
Eaton
Author:
Eaton Engineering Team
Target Audience:
Specifiers, Engineers, Contractors
Validity Period:
Not specified
Approval Date:
Not specified
Revision Date:
Not specified
Year:
2023
Region / City:
KwaZulu Natal Province
Topic:
Sanitation Infrastructure Construction
Document Type:
Tender Document
Organization / Institution:
The Mvula Trust
Author:
The Mvula Trust
Target Audience:
Contractors, Bidders
Validity Period:
12 weeks
Approval Date:
15 September 2023
Amendment Date:
N/A
Project Number:
1
Cluster:
SAFE Batch 05
Bid Number:
TMT-DBE-23/24-SAFEB05-KZNCL17
Tender Closing Date:
02 October 2023
Contract Duration:
18 weeks
Tender Value:
VAT Inclusive
Type of Project:
VIP Sanitation
CIDB Grading:
5 GB or Higher
Contractor Requirements:
No Joint Venture / Consortium
Purpose:
Provision of sanitation facilities to schools
Issuing authority:
Ministry for Primary Industries
Jurisdiction:
New Zealand
Legal basis:
Biosecurity Act 1993
Document type:
Operating manual
Facility type:
Transitional Facility for uncleared risk goods
Approval status:
Approved Transitional Facility
Regulatory standards referenced:
TFGEN (Standard for General Transitional Facilities for Uncleared Risk Goods)
Scope of activities:
Receipt, holding, processing, treatment and inspection of uncleared risk goods; inspection of imported containers
Responsible roles:
Transitional Facility Operator; Deputy Transitional Facility Operator; Accredited Person
Compliance requirements:
MPI inspection and verification audits; access for MPI Inspectors at any reasonable time
Version control:
Review and amendments record with dates and sections
Training requirements:
MPI-approved training and refresher training for operators and accredited persons
Operational areas covered:
Security, biosecurity equipment, inspections, record keeping, hygiene management, pest control, audits, contingency plans
Year:
2020-2021
Region / City:
Not specified
Subject:
Teacher Training, Primary Education
Document Type:
Guidance Document
Institution:
Not specified
Author:
Not specified
Target Audience:
Trainee Teachers
Period of Validity:
2020-2021
Approval Date:
Not specified
Revision Date:
Not specified
Version:
1.5.0.0
Protocol Posting Date:
June 2024
CAP Laboratory Accreditation Program Protocol Required Use Date:
March 2025
Authors:
Gulisa Turashvili, MD, PhD; Uma G. Krishnamurti, MD, PhD; Barbara A. Crothers, DO; Giovanna A. Giannico, MD; Krisztina Hanley, MD; Anna Plotkin, MD; Anthony N. Karnezis, MD, PhD.
Note:
Accreditation Requirements
Date of Protocol Posting:
June 2024
Date of Required Use:
March 2025
Year:
2020-2021
Region / City:
N/A
Topic:
Primary Education, Teacher Training
Document Type:
Educational Guidance
Organization:
University
Author:
N/A
Target Audience:
Trainee Teachers
Period of Validity:
2020-2021 Academic Year
Approval Date:
N/A
Date of Changes:
N/A