№ lp_2_3_45856
File format: docx
Character count: 6578
File size: 24 KB
The document contains detailed minutes of a collaborative council meeting regarding human services and emergency solutions programs in Eaton County, outlining grant allocations, project updates, and committee reports.
Year:
2025
Region / City:
Eaton County, Lansing
Subject:
Human services, housing, emergency solutions grants
Document Type:
Meeting minutes
Organization / Institution:
Eaton County Human Services Collaborative Council
Author:
K. Dempsey (Chair), various members of the council
Target Audience:
Council members, human services professionals
Effective Date:
May 12, 2025
Approval Date:
May 12, 2025
Amendment Date:
May 12, 2025
Funding Information:
Various grants and allocations for housing, emergency solutions, and shelter programs
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2024–2025
Region / City:
Eaton County, Michigan, USA
Document Type:
Work Program Template
Organization:
Michigan Department of Environment, Great Lakes, and Energy (EGLE)
Author:
Jared Bogdanov-Hanna
Target Audience:
County materials management planning committee, local government units, stakeholders
Approval Date:
March 11, 2025
Contact Email:
[email protected]
Contact Phone:
(517) 525-5223
Key Activities:
Planning, MMP development, public participation, data collection, recycling education, reporting, implementation
Year:
2016
Region / City:
Austin, Texas
Subject:
Maintenance of UPS and PDU Systems
Document Type:
Pre-Solicitation Notice
Agency:
Department of Veterans Affairs
Author:
Justin Helfman
Target Audience:
Contractors, Service Providers
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
Not specified
Region / Location:
Not specified
Subject:
Electrical equipment, manual transfer switches
Document type:
Technical specification / Guide specification
Organization:
Eaton
Standards:
UL 1008, CSA C22.2 No. 178, UL 991, NFPA 70, NFPA 99, NFPA 110, NEMA ICS 10, IEEE 446
Certification:
ISO 9001 or ISO 9002 manufacturer certification, seismic certification as specified
Intended audience:
Engineers, contractors, specification writers
Equipment type:
Low voltage manual transfer switches, molded case type
Installation:
Seismic mounting requirements, field measurements, handling and storage instructions
Submittals:
Product data sheets, schematics, drawings, test reports, installation manuals
Construction:
UL 1008 listed, double throw, mechanical interlocks, fixed mount, molded case switches or circuit breakers
Note:
Year
Topic:
Battery systems, UPS
Document Type:
Guide Specification
Organization / Institution:
Eaton
Target Audience:
Specwriters, Engineers
Note:
Year
Note:
Year
Document Type:
Guide Specification
Agency / Institution:
Eaton
Target Audience:
Specwriters, Engineers
Year:
2023
Region / City:
N/A
Topic:
Electrical Equipment Specifications
Document Type:
Guide Specification
Organization:
Eaton
Author:
N/A
Target Audience:
Specwriters, Engineers
Period of Validity:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Opening Date:
Currently Open
Closing Date:
Open Until Filled
Note:
Minimum Qualifications
Attn:
Chief Larry Joe Weeks
Year:
2025
Location:
Luton, Bedfordshire, UK
Subject:
Property inspection and structural assessment
Document Type:
Structural report
Client:
Mr Sam Allen
Engineer:
P R Carruthers BSc (Hons), CEng, MICE, MIStructE, ACIOB, FFB, FGS, FASI
Property Type:
Mid-terraced two-storey modular house (Jensel type)
Inspection Date:
21 May 2025
Weather Conditions:
Dry and mild
Issues Addressed:
Support beam above rear dining room opening, subsidence risk
Construction Details:
Precast columns, steel lattice beams, modular curtain walls, pitched modular roof
Findings:
Structural integrity confirmed, no evidence of subsidence or damage
Recommendations:
Maintain watertight drains, consult before planting trees
Year:
2026
Region / City:
Not specified
Topic:
Low Voltage Switchgear Specification
Document Type:
Guide Specification
Organization / Institution:
Eaton
Author:
Eaton Engineering Team
Target Audience:
Specifiers, Engineers, Contractors
Validity Period:
Not specified
Approval Date:
Not specified
Revision Date:
Not specified
Year:
2024
Region / City:
Ohio, United States
Subject:
Youth homelessness, Continuum of Care, Housing services, Policy recommendations
Document Type:
Request for Proposals
Organization / Institution:
Coalition on Homelessness and Housing in Ohio (COHHIO)
Author:
Coalition on Homelessness and Housing in Ohio
Target Audience:
Service providers, consultants, organizations focused on youth homelessness, policymakers
Effective Period:
October 29, 2025 - June 30, 2026
Approval Date:
October 29, 2025
Date of Last Revision:
Not provided
Year:
2025
Region / City:
Missouri
Topic:
Homelessness, Coordinated Entry System
Document Type:
Memorandum of Understanding
Agency / Organization:
Missouri Balance of State Continuum of Care
Author:
Missouri Balance of State Continuum of Care
Target Audience:
Member Agencies, Coordinated Entry System Participants
Period of Validity:
Ongoing
Approval Date:
August 1, 2025
Amendment Date:
August 1, 2025
Year:
2015
Region/City:
Charlotte-Mecklenburg
Topic:
Housing, Homelessness, Social Services
Document Type:
Application Form
Organization/Institution:
Charlotte-Mecklenburg Continuum of Care (CoC)
Author:
U.S. Department of Housing and Urban Development (HUD)
Target Audience:
Individuals and households experiencing chronic homelessness
Duration:
Ongoing
Approval Date:
Not specified
Revision Date:
Not specified
Note:
Year
Year:
2023
Region / City:
Georgia
Topic:
Environmental Review for Continuum of Care Projects
Document Type:
Environmental Review
Organization / Institution:
Georgia Housing and Finance Authority
Author:
Georgia Housing and Finance Authority
Target Audience:
Housing and urban development professionals, local government officials, and other stakeholders involved in HUD-funded projects
Period of Action:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Context:
Environmental review document for a housing assistance project to ensure compliance with various federal regulations and laws.
Note:
Year
Topic:
Environmental Review
Document Type:
Environmental Review Report
Agency / Institution:
HUD
Year:
Not specified
Region / City:
Not specified
Topic:
Decoding, fluency, and comprehension skills for guided reading levels
Document type:
Educational summary
Organization / Institution:
Not specified
Author:
Not specified
Target audience:
Educators, particularly those involved in guided reading instruction
Period of validity:
Not specified
Approval date:
Not specified
Date of changes:
Not specified
Year:
2023
Region / City:
Wuxi, Jiangnan University, China
Field:
Optics, Metamaterials, Photonics
Document Type:
Research Article
Institution:
Jiangnan University, Nanjing University
Authors:
Tian Sang, Qing Mi, Chaoyu Yang, Xianghu Zhang, Yueke Wang, Yongze Ren, Ting Xu
Target Audience:
Researchers in optics, photonics, and metamaterials
Period of Effect:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2025
Region / City:
Snohomish County
Theme:
Homelessness Services
Document Type:
Application Form
Organization:
Snohomish County
Author:
Office of Community and Homeless Services
Target Audience:
Non-profit organizations, government agencies
Effective Period:
FY2025
Approval Date:
Not specified
Modification Date:
Not specified