№ lp_1_2_30377
File format: docx
Character count: 15439
File size: 280 KB
This document provides detailed specifications for lithium-ion battery backup systems, focusing on the battery cabinet, management system, and associated components, ensuring compatibility with UPS systems for critical electrical loads.
Note:
Year
Topic:
Battery systems, UPS
Document Type:
Guide Specification
Organization / Institution:
Eaton
Target Audience:
Specwriters, Engineers
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2023
Region / City:
Egypt
Subject:
Electric Road Vehicles, Lithium-Ion Batteries
Document Type:
Notification Addendum
Organization:
Egyptian Organization for Standardization and Quality
Author:
Delegation of Egypt
Target Audience:
Producers and importers of electric road vehicles and batteries
Adoption Date:
18 December 2023
Date of Entry into Force:
5 January 2024
Date of Notification:
29 January 2024
Period for Comments:
Not applicable
Date of Publication:
Not applicable
Date of Withdrawal:
Not applicable
Closing Date:
15 August 2025
Supervisor:
Dr. Jude Onwudili
Associate Supervisor:
Dr. Anisa Mahomed
Institution:
Aston University
College:
Engineering and Physical Sciences
Department:
Chemical Engineering and Biotechnologies
Programme Length:
Three years
Contract Type:
Full time
Prospective Start Date:
1 January 2026
Academic Year:
2025/6
Funding:
Tuition fees covered for the duration of the programme
Industrial Partner:
EMR Metal Recycling
Location:
Aston Campus, Birmingham, UK
Eligibility:
Home and Overseas applicants
Research Area:
Lithium-ion battery recycling and hydrometallurgical metal recovery
Key Words:
lithium, critical metals, battery recycling, bio-based leaching agents, solvent extraction, sustainability
Application Requirements:
Transcripts and certificates, research statement, personal statement, CV, two academic references, proof of English language proficiency, passport copy
Interview Format:
Online via Microsoft Teams
Reference Code:
LCEI-LJMU-089
Document Type:
Request for Quotation (RfQ)
Project:
Low Carbon Eco-Innovatory (LCEI) Project
Funding Programme:
UK Shared Prosperity Fund (UKSPF)
Company Name:
Hutchinson Engineering Ltd
Company Address:
Everite Road, Widnes, WA8 8PT
Region:
Liverpool City Region, United Kingdom
Issuing Initiative:
Low Carbon Eco-Innovatory (LCEI)
Partner Institutions:
Liverpool John Moores University; University of Liverpool
Lead Authority:
Liverpool City Region Combined Authority
Subject:
Procurement of two 3-tonne lithium-ion electric forklifts
Purpose:
Decarbonisation of industrial operations
Indicative Budget:
£45,000 + VAT
Project Start:
November 2025
Project Completion Deadline:
31 December 2025
Submission Deadline:
13 November 2025, 17:00 Greenwich Mean Time
Publication Date:
22 October 2025
Evaluation Criteria:
Cost/Value for Money; Delivery Timescale; Specification Compliance; Quality and Technical Merit; Sustainability/ESG Commitment
Scoring Scale:
0–4 evaluation scale from Unacceptable to Excellent
Submission Method:
Email quotation submission
Contact Emails:
[email protected]; [email protected]; [email protected]
Tender Conditions:
Issuer reserves the right to discontinue the tender process and does not reimburse proposal preparation costs
Year:
2024–2025
Region / City:
Eaton County, Michigan, USA
Document Type:
Work Program Template
Organization:
Michigan Department of Environment, Great Lakes, and Energy (EGLE)
Author:
Jared Bogdanov-Hanna
Target Audience:
County materials management planning committee, local government units, stakeholders
Approval Date:
March 11, 2025
Contact Email:
[email protected]
Contact Phone:
(517) 525-5223
Key Activities:
Planning, MMP development, public participation, data collection, recycling education, reporting, implementation
Year:
2016
Region / City:
Austin, Texas
Subject:
Maintenance of UPS and PDU Systems
Document Type:
Pre-Solicitation Notice
Agency:
Department of Veterans Affairs
Author:
Justin Helfman
Target Audience:
Contractors, Service Providers
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
Not specified
Region / Location:
Not specified
Subject:
Electrical equipment, manual transfer switches
Document type:
Technical specification / Guide specification
Organization:
Eaton
Standards:
UL 1008, CSA C22.2 No. 178, UL 991, NFPA 70, NFPA 99, NFPA 110, NEMA ICS 10, IEEE 446
Certification:
ISO 9001 or ISO 9002 manufacturer certification, seismic certification as specified
Intended audience:
Engineers, contractors, specification writers
Equipment type:
Low voltage manual transfer switches, molded case type
Installation:
Seismic mounting requirements, field measurements, handling and storage instructions
Submittals:
Product data sheets, schematics, drawings, test reports, installation manuals
Construction:
UL 1008 listed, double throw, mechanical interlocks, fixed mount, molded case switches or circuit breakers
Note:
Year
Note:
Year
Document Type:
Guide Specification
Agency / Institution:
Eaton
Target Audience:
Specwriters, Engineers
Year:
2023
Region / City:
N/A
Topic:
Electrical Equipment Specifications
Document Type:
Guide Specification
Organization:
Eaton
Author:
N/A
Target Audience:
Specwriters, Engineers
Period of Validity:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Opening Date:
Currently Open
Closing Date:
Open Until Filled
Note:
Minimum Qualifications
Attn:
Chief Larry Joe Weeks
Year:
2025
Region / City:
Eaton County, Lansing
Subject:
Human services, housing, emergency solutions grants
Document Type:
Meeting minutes
Organization / Institution:
Eaton County Human Services Collaborative Council
Author:
K. Dempsey (Chair), various members of the council
Target Audience:
Council members, human services professionals
Effective Date:
May 12, 2025
Approval Date:
May 12, 2025
Amendment Date:
May 12, 2025
Funding Information:
Various grants and allocations for housing, emergency solutions, and shelter programs
Year:
2025
Location:
Luton, Bedfordshire, UK
Subject:
Property inspection and structural assessment
Document Type:
Structural report
Client:
Mr Sam Allen
Engineer:
P R Carruthers BSc (Hons), CEng, MICE, MIStructE, ACIOB, FFB, FGS, FASI
Property Type:
Mid-terraced two-storey modular house (Jensel type)
Inspection Date:
21 May 2025
Weather Conditions:
Dry and mild
Issues Addressed:
Support beam above rear dining room opening, subsidence risk
Construction Details:
Precast columns, steel lattice beams, modular curtain walls, pitched modular roof
Findings:
Structural integrity confirmed, no evidence of subsidence or damage
Recommendations:
Maintain watertight drains, consult before planting trees
Year:
2026
Region / City:
Not specified
Topic:
Low Voltage Switchgear Specification
Document Type:
Guide Specification
Organization / Institution:
Eaton
Author:
Eaton Engineering Team
Target Audience:
Specifiers, Engineers, Contractors
Validity Period:
Not specified
Approval Date:
Not specified
Revision Date:
Not specified
Document type:
Project proposal application form
Program:
BACKUP Health
Implementing organization:
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ)
Issuing organization:
BACKUP Health
Sector:
Global health, health systems strengthening
Intended applicants:
Civil society organizations, government institutions, academic institutions, private sector organizations
Geographic scope:
International
Funding modalities:
Technical assistance and financial support
Related initiatives:
Global Fund and other Global Health Initiatives
Language of document:
English
Year:
2023
Region / city:
Not specified
Topic:
CEO Succession, Interim Leadership, Organizational Policy
Document Type:
Plan
Organization / institution:
National Association of Community Health Centers
Author:
Not specified
Target Audience:
Health Center Boards
Period of validity:
Not specified
Date of approval:
Not specified
Date of amendments:
Not specified
Year:
2017
Region / City:
Maine
Topic:
Politics, Healthcare, Social Security, Abortion
Document Type:
Political Ad/Press Release
Author:
Unknown
Target Audience:
Voters, Political Constituents, General Public
Period of Validity:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Year:
2020
Country:
United Kingdom
City:
London
Organization:
Architects Registration Board
Legal status of organization:
Statutory regulator
Type of document:
Public procurement tender
Subject:
Managed backup as a service
Industry:
Information technology
Procurement method:
Competitive tender
Submission deadline:
31 January 2020
Tender stages:
Four-stage evaluation process
Contracting authority address:
8 Weymouth Street, London W1W 5BU
Existing service provider:
Databarracks Ltd.
IT environment:
VMware vSphere infrastructure with HPE Nimble Storage
Data volume:
Approximately 11 TB
Document scope:
Technical, commercial, and procedural requirements
Year:
2020
Region / City:
Pennsylvania
Topic:
IT Systems, Backup and Recovery, Disaster Recovery
Document Type:
Guideline
Organization / Institution:
Health & Human Services Information Technology Delivery Center (HHS IT DC)
Author:
Howard J. Eckman
Target Audience:
IT staff, disaster recovery teams
Effective Period:
Not specified
Approval Date:
2/14/2020
Revision Date:
1/15/2020
Change Log:
1/15/2020, Version 1.0, New Organization/Content Review by Paul Barkman, HHS IT DC
Link:
Intranet Link
Note:
, Internet Link
Abstract:
The document outlines backup and restoration procedures for enterprise systems within HHS IT DC, covering various technologies including Windows and VMware environments, and detailing recovery plans for critical applications and data.
Year:
2023
Region / City:
N/A
Theme:
IT backup, Data security
Document Type:
Policy
Organization / Institution:
MGL
Author:
Andrew Procter
Target Audience:
School staff, IT personnel
Period of validity:
N/A
Approval Date:
28/02/2023
Date of last update:
28/02/2023
Year:
2017
Region / City:
Maine
Topic:
Political Campaign, Social Security, Medicare, Health Care
Document Type:
Campaign Message / Advertisement
Organization / Institution:
N/A
Author:
N/A
Target Audience:
Voters in ME-02, Democrats, Pro-Choice Voters, General Public
Effective Date:
2017
Date of Approval:
N/A
Date of Changes:
N/A
Note:
Contextual Description