№ lp_2_3_32231
File format: docx
Character count: 2192
File size: 22 KB
Applicants can go to City of Eaton Rapids website for more information.
Opening Date:
Currently Open
Closing Date:
Open Until Filled
Note:
Minimum Qualifications
Attn:
Chief Larry Joe Weeks
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2024–2025
Region / City:
Eaton County, Michigan, USA
Document Type:
Work Program Template
Organization:
Michigan Department of Environment, Great Lakes, and Energy (EGLE)
Author:
Jared Bogdanov-Hanna
Target Audience:
County materials management planning committee, local government units, stakeholders
Approval Date:
March 11, 2025
Contact Email:
[email protected]
Contact Phone:
(517) 525-5223
Key Activities:
Planning, MMP development, public participation, data collection, recycling education, reporting, implementation
Year:
2016
Region / City:
Austin, Texas
Subject:
Maintenance of UPS and PDU Systems
Document Type:
Pre-Solicitation Notice
Agency:
Department of Veterans Affairs
Author:
Justin Helfman
Target Audience:
Contractors, Service Providers
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
Not specified
Region / Location:
Not specified
Subject:
Electrical equipment, manual transfer switches
Document type:
Technical specification / Guide specification
Organization:
Eaton
Standards:
UL 1008, CSA C22.2 No. 178, UL 991, NFPA 70, NFPA 99, NFPA 110, NEMA ICS 10, IEEE 446
Certification:
ISO 9001 or ISO 9002 manufacturer certification, seismic certification as specified
Intended audience:
Engineers, contractors, specification writers
Equipment type:
Low voltage manual transfer switches, molded case type
Installation:
Seismic mounting requirements, field measurements, handling and storage instructions
Submittals:
Product data sheets, schematics, drawings, test reports, installation manuals
Construction:
UL 1008 listed, double throw, mechanical interlocks, fixed mount, molded case switches or circuit breakers
Note:
Year
Topic:
Battery systems, UPS
Document Type:
Guide Specification
Organization / Institution:
Eaton
Target Audience:
Specwriters, Engineers
Note:
Year
Note:
Year
Document Type:
Guide Specification
Agency / Institution:
Eaton
Target Audience:
Specwriters, Engineers
Year:
2023
Region / City:
N/A
Topic:
Electrical Equipment Specifications
Document Type:
Guide Specification
Organization:
Eaton
Author:
N/A
Target Audience:
Specwriters, Engineers
Period of Validity:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Year:
2025
Region / City:
Eaton County, Lansing
Subject:
Human services, housing, emergency solutions grants
Document Type:
Meeting minutes
Organization / Institution:
Eaton County Human Services Collaborative Council
Author:
K. Dempsey (Chair), various members of the council
Target Audience:
Council members, human services professionals
Effective Date:
May 12, 2025
Approval Date:
May 12, 2025
Amendment Date:
May 12, 2025
Funding Information:
Various grants and allocations for housing, emergency solutions, and shelter programs
Year:
2025
Location:
Luton, Bedfordshire, UK
Subject:
Property inspection and structural assessment
Document Type:
Structural report
Client:
Mr Sam Allen
Engineer:
P R Carruthers BSc (Hons), CEng, MICE, MIStructE, ACIOB, FFB, FGS, FASI
Property Type:
Mid-terraced two-storey modular house (Jensel type)
Inspection Date:
21 May 2025
Weather Conditions:
Dry and mild
Issues Addressed:
Support beam above rear dining room opening, subsidence risk
Construction Details:
Precast columns, steel lattice beams, modular curtain walls, pitched modular roof
Findings:
Structural integrity confirmed, no evidence of subsidence or damage
Recommendations:
Maintain watertight drains, consult before planting trees
Year:
2026
Region / City:
Not specified
Topic:
Low Voltage Switchgear Specification
Document Type:
Guide Specification
Organization / Institution:
Eaton
Author:
Eaton Engineering Team
Target Audience:
Specifiers, Engineers, Contractors
Validity Period:
Not specified
Approval Date:
Not specified
Revision Date:
Not specified
Note:
Year
Context:
The document outlines a detailed work process schedule and related instructional outline for K-12 teacher apprenticeships, specifying required tasks, goals, and competencies to be achieved under mentorship.
Year:
2023
Region / City:
East Grand Rapids
Topic:
Road construction, street rehabilitation
Document Type:
Notice
Organization / Institution:
Strawser Construction
Target Audience:
East Grand Rapids residents
Effective Period:
9/7/2023 - 9/8/2023
Approval Date:
2023-09-07
Modification Date:
None
Year:
2025
Region / City:
East Grand Rapids
Theme:
Infrastructure Improvement, Road Rehabilitation
Document Type:
Notice
Organization / Institution:
East Grand Rapids Department of Public Works
Author:
East Grand Rapids Department of Public Works
Target Audience:
East Grand Rapids Residents/Property Owners
Period of Validity:
April – July 2025
Approval Date:
June 2025
Modification Date:
Not specified
Date:
March 1, 2017
Location:
Grant PUD, Wenatchee, WA
Participants:
USFWS, WDFW, YN, WDOE, CTUIR, CCT, BIAM, Grant PUD
Note:
Action Items
Review of 2016 draft reports:
white sturgeon and aquatic invasive species.
Year:
2017
Region / City:
Wenatchee, WA
Subject:
Fisheries Management
Document Type:
Meeting Minutes
Organization:
Priest Rapids Fish Forum (PRFF)
Author:
Tracy Hillman, Facilitator
Target Audience:
Fisheries managers, stakeholders, and related entities
Effective Period:
March 1, 2017
Approval Date:
March 1, 2017
Date of Amendments:
N/A
Year:
2026
Region / City:
Grand Rapids, MI
Theme:
Swimming Competition
Document Type:
Event Invitation
Organizer:
Grand Rapids Aquatics
Author:
Grand Rapids Aquatics
Target Audience:
Athletes, Coaches, Swimming Clubs
Start Date:
February 7, 2026
End Date:
February 8, 2026
Date Approved:
N/A
Date Modified:
N/A
Location:
Kentwood Aquatics Center
Facility:
8-lane pool with warm-up and cool-down areas
Meet Format:
Timed final meet, multiple age groups
Eligibility:
Open to USA Swimming or Michigan Swimming registered athletes
Entry Procedures:
Submit by January 31, 2026
Entry Fees:
$6.25 per event, $12.00 per relay
Scoring:
USA Swimming 8-lane scoring system
Awards:
Medals for 1st–3rd, Ribbons for 4th–8th
Programs:
Available for purchase, $12.00 for 2-day wristband
Concessions:
Available in the balcony concessions area
Lost and Found:
Articles retained for 14 days
Swimming Safety:
Feet-first entry required for warm-ups
Year:
2019
Region / City:
Sauk Rapids
Theme:
Youth Basketball Organization Meeting
Document Type:
Meeting Minutes
Organization:
Sauk Rapids-Rice Youth Basketball Organization
Author:
Not specified
Target Audience:
Board members, coaches, parents, and stakeholders
Action Period:
September 2019
Approval Date:
Not specified
Modification Date:
Not specified
Event Date:
September 4, 2019
Year:
2026
Region / City:
Sauk Rapids-Rice, Minnesota, USA
Subject:
Youth Volleyball Competitive Program
Document Type:
Handbook / Organizational Guidelines
Organization:
Sauk Rapids JO Volleyball (SRJOVB)
Target Audience:
Athletes, Parents, Coaches
Grade Levels:
4th through 12th Grade
Membership Fees:
$100 deposit per player with volunteer requirement
Program Start:
December-January
Practice Schedule:
Two practices per week, subject to gym availability
Team Formation:
Based on skill evaluations and age guidelines
Uniforms:
Jersey and warm-up provided; players supply shorts, socks, shoes, whistle, knee pads
Volunteer Requirements:
Minimum 4 hours per family per season
Evaluation:
Professional evaluators and coaches assess attitude, skill, sportsmanship, teamwork, and potential
Playing Up Policy:
Evaluator recommendation required; parental registration for older levels not allowed
Refund Policy:
Full refund if player not placed on team; no refund after roster acceptance except for board-approved injury cases
Competition:
Teams formed for 12’s through 18’s age groups with fair but not always equal playing time
Year:
2014
City:
Roanoke Rapids
Theme:
City Council Meeting Minutes
Document Type:
Meeting Minutes
Author:
City Council
Target Audience:
City Officials, Residents
Approval Date:
April 15, 2014
Amendment Date:
March 20, 2014
Location:
Lloyd Andrews City Meeting Hall
Event Date:
April 15, 2014
Year:
2026
Region / City:
Grant County, Washington, USA
Topic:
Electricity auction / Power sales
Document Type:
Bid Form / Contract Instructions
Organization:
Public Utility District No. 2 of Grant County, WA
Author:
Public Utility District No. 2
Target Audience:
Pre-qualified electricity buyers
Period Covered:
January 1, 2027 – December 31, 2027
Submission Deadline:
March 3, 2026, 11:00 a.m. PST
Contract Conditions:
Open-Market Sale of Priest Rapids Project 2027
Bid Amount:
TBD
Legal Terms:
Irrevocable bid, liquidated damages, contract execution requirements
Year:
2023
Region / City:
Cedar Rapids, Iowa
Topic:
Installation, Renovation
Document Type:
Scope of Work, Bid Specifications
Agency / Organization:
City of Cedar Rapids
Author:
City of Cedar Rapids
Target Audience:
Contractors, Bidders
Period of Action:
N/A
Approval Date:
N/A
Modification Date:
N/A