№ lp_1_38809
File format: docx
Character count: 4204
File size: 22 KB
Year:
1995
Region / City:
Not specified
Subject:
Pension Scheme
Document Type:
Application Form
Author:
Not specified
Target Audience:
Pension scheme applicants
Validity Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2020
Region / City:
Global
Topic:
Telecommunications
Document Type:
Change Request
Organization / Institution:
3GPP
Author:
Lenovo, Motorola Mobility
Target Audience:
WG1 members, 3GPP TSG
Period of Validity:
2020-08-13 to ongoing
Approval Date:
2020-08-13
Change Date:
N/A
Release:
Rel-16
Category:
F
Work Item Code:
TEI16
Proposed Change Affects:
UICC apps, ME, Radio Access Network, Core Network
Summary:
A Change Request to improve IMS session establishment by subscribing the P-CSCF to event notifications defined in TS 29.514 for EPS fallback.
Year:
2023
Region / City:
England, Wales
Topic:
Electronic Prescription Service, Endorsement Guidance
Document Type:
Guidance
Organ / Institution:
NHSBSA
Author:
Martin Hagan, Phil Edwards, Tess Zahri, Susan Grieve
Target Audience:
Prescribers, Dispensers, Pharmaceutical Services, NHS Staff
Period of Validity:
Indefinite
Approval Date:
27/03/2023
Note:
Amendment History
28/09/2004:
First draft for comment
10/02/2005:
Second draft for review
23/08/2005:
Marked as approved
08/04/2005:
Updates following publication of the Drug Tariff
27/03/2023:
Changes relating to EPS in Wales
Year:
Not specified
Region / City:
Not specified
Topic:
Educational program, Grant proposal, Data Use Agreement
Document Type:
FAQ
Organization:
Not specified
Author:
Not specified
Target Audience:
Investigators, Scholars
Period of Validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Organisation:
NHS Digital
Programme:
Electronic Prescription Service (EPS)
Related system:
Electronic Transfer of Prescriptions (ETP)
Context:
COVID-19 pandemic
Audience:
EPS prescribers and pharmacy teams
Sector:
Primary care and urgent care
Geographic scope:
England
Systems referenced:
TPP SystmOne, EMIS, Microtest, Vision, Advanced Adastra, IC24
Subject:
Remote prescribing, Phase 4 roll-out, urgent prescriptions, one-off nomination
Document type:
Operational update and guidance
Year:
2020
Region / City:
United States, Saipan, Alaska, Hawaii
Subject:
Event Planning Services
Document Type:
Performance Work Statement
Author:
U.S. Government
Target Audience:
Contractors and Service Providers
Period of Action:
Up to 12 months prior to event execution
Approval Date:
4 May 2020
Modification Date:
N/A
Year:
2026
Region / City:
Not specified
Subject:
Construction Materials
Document Type:
Technical Specification
Organization / Agency:
Not specified
Author:
Not specified
Target Audience:
Construction engineers and contractors
Application Period:
During EPS geofoam block installation
Standards Referenced:
ASTM D6817, ASTM D7557, Section 96-1.02S, Section 96-1.02T
Materials Covered:
Expanded Polystyrene (EPS) geofoam blocks, gasoline resistant geomembrane
Construction Requirements:
Subgrade preparation, EPS block placement, geomembrane installation, quality assurance
Submission Requirements:
Manufacturer’s technical data, certificates of compliance, shop drawings
Quality Control:
Third-party verification, training, preconstruction meetings, on-site supervision
Construction Tolerances:
Vertical deviation <0.5 inches per 10 feet, finished grade tolerance <3 inches
Equipment Restrictions:
No direct operation on EPS blocks or geomembrane, protection from UV and petroleum products
Handling Instructions:
Proper placement, protection from damage, securement, seam bonding per manufacturer instructions
Year:
2020
Region / City:
Online
Topic:
Security
Document Type:
Change Request
Organization:
3GPP
Author:
Intel
Target Audience:
Working Group participants
Effective Period:
2020-03-02
Approval Date:
2020-03-02
Modification Date:
N/A
Work Item Code:
TEI15
Release:
Rel-15
Category:
F
Clauses Affected:
7.4.X (new), 7.4.Y (new)
Year:
2014-2016
Region / City:
Not specified
Subject:
EPS Core Panel Technology adoption
Document Type:
Technical Requirement
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Construction firms and professionals in the EPS panel industry
Period of Application:
Ongoing
Date of Approval:
Not specified
Date of Amendments:
Not specified
Contextual Description:
Technical guidelines for adopting EPS Core Panel Technology, including equipment specifications and infrastructure requirements for construction firms.
Year:
2026
Region / city:
Goa, India
Topic:
Change request for GEO voice data transport
Document Type:
Change Request
Organization:
3GPP
Author:
vivo
Target Audience:
3GPP Working Groups, SA2
Period of Validity:
N/A
Approval Date:
2026-01-30
Amendment Date:
N/A
Proposed change:
Documentation of required normative work for GEO voice data transport over UP IP.
Consequences if not approved:
GEO voice data transport over UP IP will not be supported.
Year:
2018
Region / City:
Byron Center, Michigan, USA
Subject:
Thermal insulation materials
Document Type:
Product guide specification
Organization / Institution:
Atlas EPS, a Division of Atlas Roofing Corporation
Author:
Atlas EPS Technical Team
Target Audience:
Architects, designers, contractors
Standards Referenced:
ASTM C203, C272, C578, D1621, E84, E96/E96M; AWPA E7; CAN/ULC S701; ICC AC239; NFPA 285, 286
Products Covered:
ThermalStar X Grade, X Grade GX, LCi, LCi GX, LCi Perforated, EIFS, T&G, T&G GX
Applications:
Perimeter foundation, below-grade, below-slab, above-grade, cavity wall, continuous wall insulation, EIFS, one coat stucco
Warranty:
Lifetime insulation performance and termite resistance per AWPA E7
Delivery / Storage:
Original, unopened containers; protect from sunlight, high heat, and incompatible chemicals
Installation Requirements:
Follow manufacturer instructions; installer qualifications required; field test compatibility with other materials
Year:
1994
Region:
International / Internet
Subject:
Internet law, privacy, defamation
Document type:
Case study / educational material
Institution:
Not specified
Author:
Not specified
Target audience:
Law students, legal professionals
Legal references:
Le Roux v Dey (Freedom of Expression Institute and Another as amici curiae) 2011 3 SA 274 (CC), Electronic Communications and Transactions Act 25 of 2002
Key topics:
Defamation, privacy, Internet service providers, liability
Year:
1995
Location:
West facing wall of Mountain Quarry, Boya
Map Name:
Perth BG34
Map scale:
1:20 000
Local Government Authority:
Shire of Mundaring
Site Type:
1499
Construction Date:
1870s
Source/Details:
Elliot, I. ibid. p. 206
Condition:
variable
Integrity:
low
Architect/Designer:
Not applicable
Owner:
Not applicable
Land Description:
Not applicable
Modification:
Not specified
Use(s) of Place:
Original: Quarries, Present: Reserves
Year:
1995
Region / city:
Tasmania
Topic:
Environmental protection, species conservation
Document type:
Nomination form
Institution:
Australian Government
Author:
Not specified
Target audience:
Scientists, conservationists, government agencies
Period of validity:
Ongoing
Approval date:
Not specified
Amendment date:
Not specified
Year:
2013
Region:
United Kingdom
Subject:
Electronic communications infrastructure, cabinet and pole siting
Document type:
Code of Practice
Issuing authority:
Planning Officer’s Society, National Parks England, BT, Virgin Media, UK Competitive Telecoms Association, English Heritage, JAG (UK), KCOM
Audience:
Fixed Line Code Operators, planning and highway authorities, contractors, agents
Legislation:
Electronic Communications Code, Telecommunications Act 1984, Communications Act 2003, Town and Country Planning Act 1990, GPDO 1995, Code Regulations 2003 and amendments
Scope:
Guidance on installation, maintenance, and use of cabinets and poles above ground
Coverage area:
England, Wales, Scotland, Northern Ireland (with legal variations by territory)
Context:
Provides formal guidance for the deployment, approval, and management of cabinets and poles as part of electronic communications infrastructure, detailing legal requirements and consultation processes for fixed line operators.
Organization:
Monadnock Center for Violence Prevention
Abbreviation:
MCVP
Document Type:
Volunteer Application Form and Internal Policy
Adopting Body:
MCVP Board of Directors
Adoption Date:
October 2, 1995
Purpose:
Standardized volunteer application and eligibility procedure
Scope:
Individuals seeking volunteer positions
Volunteer Roles:
Direct Client Services (In Office), Direct Client Services After Hours, Education and Outreach, Support Group Facilitator, Shelter Advocacy, Fundraising
Commitment Requirement:
One year of service
Application Requirements:
Completed form, three non-family references, resume, interview or New Volunteer Orientation
Confidentiality:
Information kept in strict confidence to the extent permitted by law
Termination Clause:
Participation may be terminated without cause at the discretion of the Executive Director and/or Volunteer Coordinator
Subject Focus:
Domestic violence crisis intervention and prevention
Year:
1995
Region / city:
Western Australia
Subject:
Mining safety regulations
Document type:
Regulations
Authority/Institution:
Western Australian Government
Author:
Western Australian Government
Target audience:
Mining industry professionals
Period of validity:
Ongoing
Approval date:
1995
Date of amendments:
Various
Context:
A set of legal regulations governing the safety and inspection of mining operations in Western Australia, including provisions for inspections, certifications, health surveillance, and emergency preparation.
Year:
1995
Region / City:
United States
Topic:
Constitutional Law, Commerce Clause, Gun Control
Document Type:
Supreme Court Case
Organization / Institution:
United States Supreme Court
Author:
The United States Supreme Court
Target Audience:
Legal Professionals, Students of Constitutional Law, General Public
Period of Effect:
1995 and ongoing
Date of Approval:
April 26, 1995
Date of Amendments:
N/A
Jurisdiction:
South Africa
Legislation Referenced:
Labour Relations Act 66 of 1995
Section Referenced:
Section 189(3)
Document Type:
Formal employer notice
Subject:
Proposed retrenchment based on operational requirements
Issuing Party:
Employer / Company
Recipient:
Employee
Purpose:
Commencement of consultation process
Legal Basis:
Operational requirements (retrenchment)
Proposed Selection Criteria:
Last in, first out with retention of key skills
Proposed Severance Pay:
One week per completed year of service
Consultation Meeting:
Date, time and venue to be inserted
Content Elements:
Reasons for retrenchment, alternatives considered, affected employees and categories, time frames, assistance, re-employment possibility, prior retrenchments
Status:
Template requiring completion with specific details
Year:
Not specified
Region / State:
South Australia
Country:
Australia
Subject:
Rent arrears management and termination process
Document type:
Procedural flowchart
Organization:
City Realty
Legislative framework:
Residential Tenancies Act of South Australia 1995
Tribunal:
South Australian Civil and Administrative Tribunal
Abbreviation used:
SACAT
Target audience:
Property owners and landlords
Key timelines:
2 days follow-up; 10 days phone contact; 16 days Notice of Termination; 7 days to vacate or remedy arrears
Possible outcomes:
Payment order; Possession order; Reletting of property