№ files_lp_4_process_2_61841
File format: docx
Character count: 2470
File size: 27 KB
This is a change request that proposes adding new clauses to improve the security of RRC UE capability transfer for UEs with and without AS security in the EPS.
Year:
2020
Region / City:
Online
Topic:
Security
Document Type:
Change Request
Organization:
3GPP
Author:
Intel
Target Audience:
Working Group participants
Effective Period:
2020-03-02
Approval Date:
2020-03-02
Modification Date:
N/A
Work Item Code:
TEI15
Release:
Rel-15
Category:
F
Clauses Affected:
7.4.X (new), 7.4.Y (new)
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2020
Region / City:
Global
Topic:
Telecommunications
Document Type:
Change Request
Organization / Institution:
3GPP
Author:
Lenovo, Motorola Mobility
Target Audience:
WG1 members, 3GPP TSG
Period of Validity:
2020-08-13 to ongoing
Approval Date:
2020-08-13
Change Date:
N/A
Release:
Rel-16
Category:
F
Work Item Code:
TEI16
Proposed Change Affects:
UICC apps, ME, Radio Access Network, Core Network
Summary:
A Change Request to improve IMS session establishment by subscribing the P-CSCF to event notifications defined in TS 29.514 for EPS fallback.
Year:
1995
Region / City:
Not specified
Subject:
Pension Scheme
Document Type:
Application Form
Author:
Not specified
Target Audience:
Pension scheme applicants
Validity Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2023
Region / City:
England, Wales
Topic:
Electronic Prescription Service, Endorsement Guidance
Document Type:
Guidance
Organ / Institution:
NHSBSA
Author:
Martin Hagan, Phil Edwards, Tess Zahri, Susan Grieve
Target Audience:
Prescribers, Dispensers, Pharmaceutical Services, NHS Staff
Period of Validity:
Indefinite
Approval Date:
27/03/2023
Note:
Amendment History
28/09/2004:
First draft for comment
10/02/2005:
Second draft for review
23/08/2005:
Marked as approved
08/04/2005:
Updates following publication of the Drug Tariff
27/03/2023:
Changes relating to EPS in Wales
Year:
Not specified
Region / City:
Not specified
Topic:
Educational program, Grant proposal, Data Use Agreement
Document Type:
FAQ
Organization:
Not specified
Author:
Not specified
Target Audience:
Investigators, Scholars
Period of Validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Organisation:
NHS Digital
Programme:
Electronic Prescription Service (EPS)
Related system:
Electronic Transfer of Prescriptions (ETP)
Context:
COVID-19 pandemic
Audience:
EPS prescribers and pharmacy teams
Sector:
Primary care and urgent care
Geographic scope:
England
Systems referenced:
TPP SystmOne, EMIS, Microtest, Vision, Advanced Adastra, IC24
Subject:
Remote prescribing, Phase 4 roll-out, urgent prescriptions, one-off nomination
Document type:
Operational update and guidance
Year:
2020
Region / City:
United States, Saipan, Alaska, Hawaii
Subject:
Event Planning Services
Document Type:
Performance Work Statement
Author:
U.S. Government
Target Audience:
Contractors and Service Providers
Period of Action:
Up to 12 months prior to event execution
Approval Date:
4 May 2020
Modification Date:
N/A
Year:
2026
Region / City:
Not specified
Subject:
Construction Materials
Document Type:
Technical Specification
Organization / Agency:
Not specified
Author:
Not specified
Target Audience:
Construction engineers and contractors
Application Period:
During EPS geofoam block installation
Standards Referenced:
ASTM D6817, ASTM D7557, Section 96-1.02S, Section 96-1.02T
Materials Covered:
Expanded Polystyrene (EPS) geofoam blocks, gasoline resistant geomembrane
Construction Requirements:
Subgrade preparation, EPS block placement, geomembrane installation, quality assurance
Submission Requirements:
Manufacturer’s technical data, certificates of compliance, shop drawings
Quality Control:
Third-party verification, training, preconstruction meetings, on-site supervision
Construction Tolerances:
Vertical deviation <0.5 inches per 10 feet, finished grade tolerance <3 inches
Equipment Restrictions:
No direct operation on EPS blocks or geomembrane, protection from UV and petroleum products
Handling Instructions:
Proper placement, protection from damage, securement, seam bonding per manufacturer instructions
Year:
2014-2016
Region / City:
Not specified
Subject:
EPS Core Panel Technology adoption
Document Type:
Technical Requirement
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Construction firms and professionals in the EPS panel industry
Period of Application:
Ongoing
Date of Approval:
Not specified
Date of Amendments:
Not specified
Contextual Description:
Technical guidelines for adopting EPS Core Panel Technology, including equipment specifications and infrastructure requirements for construction firms.
Year:
2026
Region / city:
Goa, India
Topic:
Change request for GEO voice data transport
Document Type:
Change Request
Organization:
3GPP
Author:
vivo
Target Audience:
3GPP Working Groups, SA2
Period of Validity:
N/A
Approval Date:
2026-01-30
Amendment Date:
N/A
Proposed change:
Documentation of required normative work for GEO voice data transport over UP IP.
Consequences if not approved:
GEO voice data transport over UP IP will not be supported.
Year:
2018
Region / City:
Byron Center, Michigan, USA
Subject:
Thermal insulation materials
Document Type:
Product guide specification
Organization / Institution:
Atlas EPS, a Division of Atlas Roofing Corporation
Author:
Atlas EPS Technical Team
Target Audience:
Architects, designers, contractors
Standards Referenced:
ASTM C203, C272, C578, D1621, E84, E96/E96M; AWPA E7; CAN/ULC S701; ICC AC239; NFPA 285, 286
Products Covered:
ThermalStar X Grade, X Grade GX, LCi, LCi GX, LCi Perforated, EIFS, T&G, T&G GX
Applications:
Perimeter foundation, below-grade, below-slab, above-grade, cavity wall, continuous wall insulation, EIFS, one coat stucco
Warranty:
Lifetime insulation performance and termite resistance per AWPA E7
Delivery / Storage:
Original, unopened containers; protect from sunlight, high heat, and incompatible chemicals
Installation Requirements:
Follow manufacturer instructions; installer qualifications required; field test compatibility with other materials
Year:
1994
Region:
International / Internet
Subject:
Internet law, privacy, defamation
Document type:
Case study / educational material
Institution:
Not specified
Author:
Not specified
Target audience:
Law students, legal professionals
Legal references:
Le Roux v Dey (Freedom of Expression Institute and Another as amici curiae) 2011 3 SA 274 (CC), Electronic Communications and Transactions Act 25 of 2002
Key topics:
Defamation, privacy, Internet service providers, liability
Year:
2023
Location:
Athens, Greece
Subject:
3GPP RAN2 LTM RRC configuration
Document type:
Technical progress report
Organization:
3GPP TSG-RAN WG2
Author:
Ericsson
Intended audience:
RAN2 members, telecom engineers
Meeting number:
121
Discussion topics:
Reference configuration, LTM candidate configuration, RRC procedures, UE actions, configuration application options
Year:
2022
Region / city:
n/a
Topic:
RRC parameters, small data transmission, SDT
Document type:
Meeting Summary
Organization:
3GPP TSG-RAN WG1
Author:
ZTE Moderator
Target audience:
3GPP participants, telecommunications experts
Period of validity:
February 21st - March 3rd, 2022
Approval date:
n/a
Modification date:
n/a
Context:
Summary of discussions and comments on RRC parameters for small data transmission (SDT) in 3GPP TSG-RAN WG1 meeting.
Year:
2020
Region / city:
Not specified
Theme:
eMIMO, RRC
Document type:
Technical discussion
Organization / institution:
Ericsson
Author:
Not specified
Target audience:
Technical experts in wireless communication
Period of validity:
Not specified
Approval date:
Not specified
Modification date:
Not specified
Year:
2020
Region / City:
Online
Topic:
RAN, Core Network, Segmentation
Document Type:
Change Request
Organization / Institution:
3GPP
Author:
MediaTek Inc., Ericsson
Target Audience:
Technical Working Groups, Telecom Professionals
Effective Period:
2020
Approval Date:
2020-02-28
Revision History:
Rev 021
Category:
B (Addition of Feature)
Release:
Rel-16
Reason for Change:
Agreements related to LTE portions of the RACS work item need to be captured in TS 36.300
Changes Summary:
Describes segmentation of capability information, inclusion of ID representing AS capabilities in NAS signalling, and segmentation in both uplink and downlink.
Consequences if Not Approved:
Stage 2 description of RACS and DL RRC segmentation is missing
Affected Clauses:
7.x (new), 18
Note:
Context Description
Year:
2022
Version:
V16.8.0
Date of publication:
2022-03
Organization:
3rd Generation Partnership Project (3GPP)
Technical Specification Group:
Radio Access Network
Specification number:
TS 38.331
Release:
Release 16
Subject:
NR Radio Resource Control (RRC) protocol
Document type:
Technical Specification
Scope:
5G NR radio interface control procedures and signalling
Intellectual property notice:
© 2022 3GPP Organizational Partners (ARIB, ATIS, CCSA, ETSI, TSDSI, TTA, TTC)
Status:
Provided for future development work within 3GPP; not subject to approval by the Organizational Partners
Place of publication:
Valbonne, France
Year:
2024
Region / City:
Maastricht, Netherlands
Topic:
5G, RACH-less Handover, Network
Document Type:
Change Request
Organization / Institution:
3GPP TSG-RAN WG2
Author:
Ericsson
Target Audience:
Technical Working Group, 3GPP Members
Period of Validity:
2024-08-09 to 2024-08-23
Approval Date:
2024-08-09
Amendment Date:
Not specified
Release:
Rel-18
Work Item Code:
NR_mobile_IAB-Core, NR_NTN_enh-Core, TEI18
Category:
F
Impact Analysis:
NR SA, NG EN-DC, NE-DC, NR-DC
Affected Functionality:
RACH-less Handover
Interoperability:
Network and UE Compatibility
Clauses Affected:
6.3.2
Other Specs Affected:
TS 38.321 CR 1881
Test Specifications:
Not specified
O&M Specifications:
Not specified
Other Comments:
Not specified
Year:
2023
Region / city:
Toulouse, France
Theme:
3GPP, RRC parameters, Rel-18 XR WI
Document type:
Discussion and Decision
Organ / institution:
3GPP TSG RAN WG1
Author:
Qualcomm (Moderator)
Target audience:
3GPP members, RAN1 working group
Period of validity:
August 21st – August 25th, 2023
Approval date:
August 2023
Date of changes:
Not specified
References:
R1-2307940, Initial higher layer parameters for Rel-18 XR enhancements, Qualcomm, Nokia (WI rapporteurs)
Year:
2025
Version:
V198.07.0
Release:
Release 198
Organization:
3rd Generation Partnership Project (3GPP)
Technical Specification Group:
Radio Access Network
Standard Number:
3GPP TS 36.331
Subject:
Evolved Universal Terrestrial Radio Access (E-UTRA)
Protocol:
Radio Resource Control (RRC)
Document Type:
Technical Specification
Status:
Provided for future development work within 3GPP; not subject to approval process; not for implementation
Copyright Holder:
3GPP Organizational Partners (ARIB, ATIS, CCSA, ETSI, TSDSI, TTA, TTC)
Postal Address:
650 Route des Lucioles - Sophia Antipolis, Valbonne, France
Scope:
Specification of RRC protocol procedures, system information handling, connection control, mobility, paging, and security for LTE including NB-IoT and related features