№ files_lp_4_process_2_84104
File format: docx
Character count: 147591
File size: 317 KB
Year:
2026
Region / city:
Goa, India
Topic:
Change request for GEO voice data transport
Document Type:
Change Request
Organization:
3GPP
Author:
vivo
Target Audience:
3GPP Working Groups, SA2
Period of Validity:
N/A
Approval Date:
2026-01-30
Amendment Date:
N/A
Proposed change:
Documentation of required normative work for GEO voice data transport over UP IP.
Consequences if not approved:
GEO voice data transport over UP IP will not be supported.
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2020
Region / City:
Global
Topic:
Telecommunications
Document Type:
Change Request
Organization / Institution:
3GPP
Author:
Lenovo, Motorola Mobility
Target Audience:
WG1 members, 3GPP TSG
Period of Validity:
2020-08-13 to ongoing
Approval Date:
2020-08-13
Change Date:
N/A
Release:
Rel-16
Category:
F
Work Item Code:
TEI16
Proposed Change Affects:
UICC apps, ME, Radio Access Network, Core Network
Summary:
A Change Request to improve IMS session establishment by subscribing the P-CSCF to event notifications defined in TS 29.514 for EPS fallback.
Year:
1995
Region / City:
Not specified
Subject:
Pension Scheme
Document Type:
Application Form
Author:
Not specified
Target Audience:
Pension scheme applicants
Validity Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2023
Region / City:
England, Wales
Topic:
Electronic Prescription Service, Endorsement Guidance
Document Type:
Guidance
Organ / Institution:
NHSBSA
Author:
Martin Hagan, Phil Edwards, Tess Zahri, Susan Grieve
Target Audience:
Prescribers, Dispensers, Pharmaceutical Services, NHS Staff
Period of Validity:
Indefinite
Approval Date:
27/03/2023
Note:
Amendment History
28/09/2004:
First draft for comment
10/02/2005:
Second draft for review
23/08/2005:
Marked as approved
08/04/2005:
Updates following publication of the Drug Tariff
27/03/2023:
Changes relating to EPS in Wales
Year:
Not specified
Region / City:
Not specified
Topic:
Educational program, Grant proposal, Data Use Agreement
Document Type:
FAQ
Organization:
Not specified
Author:
Not specified
Target Audience:
Investigators, Scholars
Period of Validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Organisation:
NHS Digital
Programme:
Electronic Prescription Service (EPS)
Related system:
Electronic Transfer of Prescriptions (ETP)
Context:
COVID-19 pandemic
Audience:
EPS prescribers and pharmacy teams
Sector:
Primary care and urgent care
Geographic scope:
England
Systems referenced:
TPP SystmOne, EMIS, Microtest, Vision, Advanced Adastra, IC24
Subject:
Remote prescribing, Phase 4 roll-out, urgent prescriptions, one-off nomination
Document type:
Operational update and guidance
Year:
2020
Region / City:
United States, Saipan, Alaska, Hawaii
Subject:
Event Planning Services
Document Type:
Performance Work Statement
Author:
U.S. Government
Target Audience:
Contractors and Service Providers
Period of Action:
Up to 12 months prior to event execution
Approval Date:
4 May 2020
Modification Date:
N/A
Year:
2026
Region / City:
Not specified
Subject:
Construction Materials
Document Type:
Technical Specification
Organization / Agency:
Not specified
Author:
Not specified
Target Audience:
Construction engineers and contractors
Application Period:
During EPS geofoam block installation
Standards Referenced:
ASTM D6817, ASTM D7557, Section 96-1.02S, Section 96-1.02T
Materials Covered:
Expanded Polystyrene (EPS) geofoam blocks, gasoline resistant geomembrane
Construction Requirements:
Subgrade preparation, EPS block placement, geomembrane installation, quality assurance
Submission Requirements:
Manufacturer’s technical data, certificates of compliance, shop drawings
Quality Control:
Third-party verification, training, preconstruction meetings, on-site supervision
Construction Tolerances:
Vertical deviation <0.5 inches per 10 feet, finished grade tolerance <3 inches
Equipment Restrictions:
No direct operation on EPS blocks or geomembrane, protection from UV and petroleum products
Handling Instructions:
Proper placement, protection from damage, securement, seam bonding per manufacturer instructions
Year:
2020
Region / City:
Online
Topic:
Security
Document Type:
Change Request
Organization:
3GPP
Author:
Intel
Target Audience:
Working Group participants
Effective Period:
2020-03-02
Approval Date:
2020-03-02
Modification Date:
N/A
Work Item Code:
TEI15
Release:
Rel-15
Category:
F
Clauses Affected:
7.4.X (new), 7.4.Y (new)
Year:
2014-2016
Region / City:
Not specified
Subject:
EPS Core Panel Technology adoption
Document Type:
Technical Requirement
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Construction firms and professionals in the EPS panel industry
Period of Application:
Ongoing
Date of Approval:
Not specified
Date of Amendments:
Not specified
Contextual Description:
Technical guidelines for adopting EPS Core Panel Technology, including equipment specifications and infrastructure requirements for construction firms.
Year:
2018
Region / City:
Byron Center, Michigan, USA
Subject:
Thermal insulation materials
Document Type:
Product guide specification
Organization / Institution:
Atlas EPS, a Division of Atlas Roofing Corporation
Author:
Atlas EPS Technical Team
Target Audience:
Architects, designers, contractors
Standards Referenced:
ASTM C203, C272, C578, D1621, E84, E96/E96M; AWPA E7; CAN/ULC S701; ICC AC239; NFPA 285, 286
Products Covered:
ThermalStar X Grade, X Grade GX, LCi, LCi GX, LCi Perforated, EIFS, T&G, T&G GX
Applications:
Perimeter foundation, below-grade, below-slab, above-grade, cavity wall, continuous wall insulation, EIFS, one coat stucco
Warranty:
Lifetime insulation performance and termite resistance per AWPA E7
Delivery / Storage:
Original, unopened containers; protect from sunlight, high heat, and incompatible chemicals
Installation Requirements:
Follow manufacturer instructions; installer qualifications required; field test compatibility with other materials
Year:
1994
Region:
International / Internet
Subject:
Internet law, privacy, defamation
Document type:
Case study / educational material
Institution:
Not specified
Author:
Not specified
Target audience:
Law students, legal professionals
Legal references:
Le Roux v Dey (Freedom of Expression Institute and Another as amici curiae) 2011 3 SA 274 (CC), Electronic Communications and Transactions Act 25 of 2002
Key topics:
Defamation, privacy, Internet service providers, liability
Year:
2026
Region / City:
Goa, India
Topic:
IMS signaling transport for GEO NB-IoT NTN access
Document Type:
Meeting Contribution
Organization / Institution:
3GPP
Author:
vivo
Target Audience:
3GPP TSG-SA WG2 members
Period of validity:
February 2026
Approval Date:
Not specified
Modification Date:
Not specified
Agenda Item:
20.1.1
Work Item / Release:
FS_5GSAT_Ph4_ARC / Rel-20
Abstract:
Updated conclusion on IMS signaling transport for GEO NB-IoT NTN access
Context:
Document proposing conclusions on IMS signaling transport for GEO NB-IoT NTN access.
Year:
2025
Region / city:
Göteborg, SE
Theme:
IMS voice call optimization via NB-IoT GEO
Document Type:
Technical Specification
Organization:
Huawei, HiSilicon, China Telecom, CSCN
Author:
Not specified
Target Audience:
Telecom engineers, 3GPP members
Period of validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2026
Region / City:
Goa, India
Theme:
Telecommunications
Document Type:
Meeting Conclusion
Organization:
3GPP TSG-WG SA2
Author:
Huawei, HiSilicon
Target Audience:
Telecommunications professionals, engineers, and network operators
Period of validity:
N/A
Approval Date:
9th Feb 2026
Amendment Date:
N/A
Year:
2026
Location:
Goa, India
Topic:
IMS enhancement for GEO NB-IoT NTN access
Document type:
Meeting contribution / Technical report
Organization:
3GPP TSG-WG SA2
Author:
Huawei, HiSilicon
Audience:
3GPP members, telecom engineers
Agenda item:
20.1.1
Work item / Release:
FS_5GSAT_Ph4-ARC / Rel-20
Reference document:
TR 23.700-19 v1.1.0
Meeting number:
#173
Date:
9–13 February 2026
Summary:
Interim conclusions for Key Issue #2 on IMS enhancement for GEO NB-IoT NTN access including SIP message size reduction, shortened call setup, and B2BUA interoperation
Year:
2025
Region / City:
Global / 3GPP Members
Subject:
Telecommunications; NB-IoT; IMS Voice; GEO Satellite
Document Type:
Technical contribution / Agreement
Organization:
3GPP, vivo Mobile Communication Co.
Authors:
Contributors from vivo, China Mobile, MediaTek, ZTE, Verizon, Ericsson, CATT, Nokia, Skylo, Thales, China Telecom, Spreadtrum, Xiaomi, OPPO, China Unicom, LG Electronics, Apple, Samsung, NTT DOCOMO, CSCN, SHARP
Target Audience:
3GPP Working Groups RAN1, RAN2, SA2, SA4
Period of Effect:
2025 – until next update
Approval Date:
August 2025
References:
3GPP TR 23.700-19, TS 26.132, TR 36.321, TR 36.763, TR 38.811, TR 38.821, FS_ULBC Tdocs
Year:
2026
Region / city:
Goa, India
Topic:
IMS Voice over GEO Satellite
Document Type:
Specification
Organization:
3GPP
Author:
Nokia
Target audience:
3GPP members
Period of validity:
N/A
Approval date:
N/A
Modification date:
N/A
Year:
2026
Location:
Goa, India
Subject:
IMS enhancement for GEO NB-IoT NTN access
Document Type:
Meeting contribution / Technical conclusion
Organization:
3GPP TSG-WG SA2
Author:
Huawei, HiSilicon
Agenda Item:
20.1.1
Work Item / Release:
FS_5GSAT_Ph4-ARC / Rel-20
Purpose:
Approval
Reference Document:
TR 23.700-19 v1.1.0
Interim Conclusions:
SigComp, SIP header slimming, SDP preconfiguration, shortened call setup, B2BUA support, dedicated bearer for IMS voice data
Year:
2026
Region / City:
India
Document Type:
Change Request
Organization / Committee:
3GPP TSG-SA5
Author:
Huawei
Work Item Code:
TEI19
Release:
Rel-19
Category:
C
Date Submitted:
2026-01-10
Meeting Number:
165
Clauses Affected:
TraceControlNrm.yaml
Related Specifications:
Other core specifications, Test specifications, O&M Specifications
Revision History:
1st Change at commit 09d56814c19dc9ad803b1dd962315a850f929df4
URL:
https://www.3gpp.org/Change-Requests