№ files_lp_4_process_3_083977
File format: docx
Character count: 23592
File size: 55 KB
Specification for Atlas EPS rigid foam insulation products including application methods, related sections, standards, submittals, quality assurance, storage, handling, and warranty provisions.
Year:
2018
Region / City:
Byron Center, Michigan, USA
Subject:
Thermal insulation materials
Document Type:
Product guide specification
Organization / Institution:
Atlas EPS, a Division of Atlas Roofing Corporation
Author:
Atlas EPS Technical Team
Target Audience:
Architects, designers, contractors
Standards Referenced:
ASTM C203, C272, C578, D1621, E84, E96/E96M; AWPA E7; CAN/ULC S701; ICC AC239; NFPA 285, 286
Products Covered:
ThermalStar X Grade, X Grade GX, LCi, LCi GX, LCi Perforated, EIFS, T&G, T&G GX
Applications:
Perimeter foundation, below-grade, below-slab, above-grade, cavity wall, continuous wall insulation, EIFS, one coat stucco
Warranty:
Lifetime insulation performance and termite resistance per AWPA E7
Delivery / Storage:
Original, unopened containers; protect from sunlight, high heat, and incompatible chemicals
Installation Requirements:
Follow manufacturer instructions; installer qualifications required; field test compatibility with other materials
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2020
Region / City:
Global
Topic:
Telecommunications
Document Type:
Change Request
Organization / Institution:
3GPP
Author:
Lenovo, Motorola Mobility
Target Audience:
WG1 members, 3GPP TSG
Period of Validity:
2020-08-13 to ongoing
Approval Date:
2020-08-13
Change Date:
N/A
Release:
Rel-16
Category:
F
Work Item Code:
TEI16
Proposed Change Affects:
UICC apps, ME, Radio Access Network, Core Network
Summary:
A Change Request to improve IMS session establishment by subscribing the P-CSCF to event notifications defined in TS 29.514 for EPS fallback.
Year:
1995
Region / City:
Not specified
Subject:
Pension Scheme
Document Type:
Application Form
Author:
Not specified
Target Audience:
Pension scheme applicants
Validity Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2023
Region / City:
England, Wales
Topic:
Electronic Prescription Service, Endorsement Guidance
Document Type:
Guidance
Organ / Institution:
NHSBSA
Author:
Martin Hagan, Phil Edwards, Tess Zahri, Susan Grieve
Target Audience:
Prescribers, Dispensers, Pharmaceutical Services, NHS Staff
Period of Validity:
Indefinite
Approval Date:
27/03/2023
Note:
Amendment History
28/09/2004:
First draft for comment
10/02/2005:
Second draft for review
23/08/2005:
Marked as approved
08/04/2005:
Updates following publication of the Drug Tariff
27/03/2023:
Changes relating to EPS in Wales
Year:
Not specified
Region / City:
Not specified
Topic:
Educational program, Grant proposal, Data Use Agreement
Document Type:
FAQ
Organization:
Not specified
Author:
Not specified
Target Audience:
Investigators, Scholars
Period of Validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Organisation:
NHS Digital
Programme:
Electronic Prescription Service (EPS)
Related system:
Electronic Transfer of Prescriptions (ETP)
Context:
COVID-19 pandemic
Audience:
EPS prescribers and pharmacy teams
Sector:
Primary care and urgent care
Geographic scope:
England
Systems referenced:
TPP SystmOne, EMIS, Microtest, Vision, Advanced Adastra, IC24
Subject:
Remote prescribing, Phase 4 roll-out, urgent prescriptions, one-off nomination
Document type:
Operational update and guidance
Year:
2020
Region / City:
United States, Saipan, Alaska, Hawaii
Subject:
Event Planning Services
Document Type:
Performance Work Statement
Author:
U.S. Government
Target Audience:
Contractors and Service Providers
Period of Action:
Up to 12 months prior to event execution
Approval Date:
4 May 2020
Modification Date:
N/A
Year:
2026
Region / City:
Not specified
Subject:
Construction Materials
Document Type:
Technical Specification
Organization / Agency:
Not specified
Author:
Not specified
Target Audience:
Construction engineers and contractors
Application Period:
During EPS geofoam block installation
Standards Referenced:
ASTM D6817, ASTM D7557, Section 96-1.02S, Section 96-1.02T
Materials Covered:
Expanded Polystyrene (EPS) geofoam blocks, gasoline resistant geomembrane
Construction Requirements:
Subgrade preparation, EPS block placement, geomembrane installation, quality assurance
Submission Requirements:
Manufacturer’s technical data, certificates of compliance, shop drawings
Quality Control:
Third-party verification, training, preconstruction meetings, on-site supervision
Construction Tolerances:
Vertical deviation <0.5 inches per 10 feet, finished grade tolerance <3 inches
Equipment Restrictions:
No direct operation on EPS blocks or geomembrane, protection from UV and petroleum products
Handling Instructions:
Proper placement, protection from damage, securement, seam bonding per manufacturer instructions
Year:
2020
Region / City:
Online
Topic:
Security
Document Type:
Change Request
Organization:
3GPP
Author:
Intel
Target Audience:
Working Group participants
Effective Period:
2020-03-02
Approval Date:
2020-03-02
Modification Date:
N/A
Work Item Code:
TEI15
Release:
Rel-15
Category:
F
Clauses Affected:
7.4.X (new), 7.4.Y (new)
Year:
2014-2016
Region / City:
Not specified
Subject:
EPS Core Panel Technology adoption
Document Type:
Technical Requirement
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Construction firms and professionals in the EPS panel industry
Period of Application:
Ongoing
Date of Approval:
Not specified
Date of Amendments:
Not specified
Contextual Description:
Technical guidelines for adopting EPS Core Panel Technology, including equipment specifications and infrastructure requirements for construction firms.
Year:
2026
Region / city:
Goa, India
Topic:
Change request for GEO voice data transport
Document Type:
Change Request
Organization:
3GPP
Author:
vivo
Target Audience:
3GPP Working Groups, SA2
Period of Validity:
N/A
Approval Date:
2026-01-30
Amendment Date:
N/A
Proposed change:
Documentation of required normative work for GEO voice data transport over UP IP.
Consequences if not approved:
GEO voice data transport over UP IP will not be supported.
Year:
1994
Region:
International / Internet
Subject:
Internet law, privacy, defamation
Document type:
Case study / educational material
Institution:
Not specified
Author:
Not specified
Target audience:
Law students, legal professionals
Legal references:
Le Roux v Dey (Freedom of Expression Institute and Another as amici curiae) 2011 3 SA 274 (CC), Electronic Communications and Transactions Act 25 of 2002
Key topics:
Defamation, privacy, Internet service providers, liability
Year:
2026
Organization:
Forum for the Harmonization of Herbal Medicines (FHH)
Committee:
Subcommittee 2
Chair:
Republic of Korea
Document Type:
Guideline
Scope:
Establishment of an Atlas for species discrimination of herbal materials
Purpose:
Harmonization of quality assurance techniques and international regulatory alignment
Target Audience:
FHH members and associate members
Contents:
Taxonomic, genetic, and physicochemical characteristics of herbal materials; sample collection and analysis; research proposal and selection process; management of Atlas
Access:
Free for FHH members
Country(ies):
Brazil
ATLAS Award ID:
00011660
PIMS Number:
543
GEF Focal Area:
Climate Change
GEF Strategic Objective:
Operational Programme 11
GEF Budget (USD):
12,274,000
Co-Financing Budget (USD):
4,684,993
Project Document Signature date:
October 15th, 2001
Date of first disbursement:
February 01st, 2002
Original Planned Closing Date:
November 30th, 2006
Executing Agency:
UNDP
Date of Project Closure:
December 31st, 2014
Year:
2013
Region / City:
Brazil
Theme:
Urban Transport, Clean Energy
Document Type:
Terms of Reference
Agency:
UNDP
Author:
UNDP/GEF
Target Audience:
Evaluation Consultants, Project Stakeholders
Effective Period:
2013-2014
Approval Date:
October 15th, 2001
Modification Date:
None
Year:
2016
Region / City:
Global
Topic:
Neuroimaging, Brain Atlas
Document Type:
Technical Documentation
Organization / Institution:
Human Connectome Project
Author:
Kathryn Mills
Target Audience:
Researchers, Neuroimaging Professionals
Period of Validity:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Year:
2019
Region / city:
New Zealand
Theme:
Groundwater Models
Document Type:
Consultancy Report
Organization:
GNS Science, Aqualinc Research Limited
Author:
P Johnson, F Mourot, ZJ Rawlinson, C Tschritter, J Weir
Target Audience:
Ministry for the Environment, scientists, environmental professionals
Period of validity:
Not specified
Date of approval:
October 2019
Date of changes:
Not specified
Year:
2020
Region / City:
Brussels
Theme:
Human Brain Project, Software Development, Neuroscience
Document Type:
Proposal Template
Organization:
Human Brain Project
Author:
Not specified
Target Audience:
Applicants, interested parties
Period of Validity:
2020-2021
Approval Date:
5 August 2020
Amendment Date:
Not specified
Call Publication Date:
5 August 2020
Pre-proposal Submission Deadline:
16 September 2020
Proposal Submission Deadline:
16 October 2020
Budget:
EUR 450,000
Keywords:
Brain atlas, The Virtual Brain, Knowledge Graph, HIP, software adapter
Contact Information:
[email protected]
Methodology:
Detailed methodology for proposal activities is outlined
Proposal Length:
Maximum 18 pages, with additional pages per partner
Proposal Submission Platform:
HBP Open Call Platform
Year:
2014
Document Type:
Technical Specification
Version:
0.321 Draft
Authors:
Dan Edmunds, Yuri Ermoline, Wade Fisher, Philippe Laurens
Organization:
ATLAS Collaboration, CERN
System:
ATLAS Level-1 Calorimeter Trigger (L1Calo)
Module:
FEX-Hub
Phase:
Phase-I (Run 3)
Prototype:
Yes
Installation Period:
Long Shutdown 2 (LS2)
Target Operation:
Run 3 and Run 4
Related Documents:
L1Calo Phase-I eFEX, jFEX, Hub-ROD Specifications; ATCA Short Form Specification; TTC-FMC Specification
Year:
2026
Region / City:
North Carolina
Topic:
GIS Tools
Document Type:
User Guide
Organization:
North Carolina Department of Transportation (NCDOT)
Author:
NCDOT
Target Audience:
NCDOT Staff and Authorized Users
Date of Approval:
2026
Date of Last Change:
2026
Description:
User guide for accessing and using the ATLAS Search & Screening Tool, providing instructions on layer selection, map features, and tool usage for geographic information system (GIS) tasks.
Year:
2026
Region / Country:
Kenya
Subject:
Herpetology
Document Type:
Checklist / Atlas
Institution:
National Museums of Kenya, Department of Herpetology
Authors:
Stephen Spawls, Beryl Bwong, Patrick Malonza, Vincent Muchai, Victor Wasonga
Funding:
Rufford Foundation
Species Covered:
Turtles, tortoises, lizards, worm lizards, crocodiles
Update Frequency:
Periodic updates
Reference Framework:
Reptile Database nomenclature
Availability:
Downloadable from kenyareptileatlas.com
Part:
1
Future Publications:
Snakes covered in Part 2