№ files_lp_4_process_3_084625
File format: docx
Character count: 2493
File size: 202 KB
Structured worksheet for documenting utility, infrastructure, transit, and educational impacts for large-scale development projects in Manatee County, Florida.
Note:
Year
Region / City:
Manatee County, Florida
Topic:
Urban Planning and Infrastructure
Document Type:
Application Worksheet
Authority / Institution:
Manatee County Government
Author:
Applicant (unspecified)
Target Audience:
Developers and planners
Relevant Period:
Project-specific
Submission Requirements:
Compliance with Florida Administrative Code Chapters 64E-8, 62-550, and 555; coordination with Manatee County School Board
Utilities Covered:
Water supply, sanitary sewer, stormwater management, solid waste, hazardous waste
Transportation:
Transit routes and proximity to bus stops
Educational Facilities:
Public schools serving the site
Land Use:
Large project zoning and development planning
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2025
Region / City:
Victoria, Australia
Topic:
Food Safety Program
Document Type:
Template
Organization / Institution:
PrimeSafe
Author:
PrimeSafe
Target Audience:
Businesses in the retail meat sector
Period of Validity:
Ongoing
Approval Date:
2025
Amendment Date:
N/A
Year:
2023
Region / City:
Illinois
Theme:
Family support, healthcare, youth services
Document Type:
Application Packet
Organization / Institution:
Department of Healthcare and Family Services (HFS), Acentra Health
Author:
Acentra Health
Target Audience:
Parents, guardians, youth, Care Coordination and Support Organizations (CCSO)
Period of Validity:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Document type:
User registration instructions
Subject area:
Supplier portal access
Organization:
Ford Motor Company
Platform:
Ford Supplier Portal (FSP)
Related system:
Covisint
Intended audience:
Supplier personnel
Access requirements:
Active Covisint account and GSDB supplier code
Geographic scope:
Global
Support contacts:
Ford Help Desk; Covisint Help Desk
Source type:
Corporate procedural guidance
Year:
2018
Organization:
Department of Healthcare and Family Services (HFS)
Supporting Agency:
eQHealth Solutions, Inc.
Document Type:
Enrollment Authorization Request Packet
Target Audience:
Youth participants and legal guardians
Submission Period:
Last 30 days of 180-day FSP eligibility
Required Documentation:
Completed forms, financial information, behavioral health treatment history, progress notes, guardian acknowledgements, and updated treatment plan
Method of Submission:
Fax or mail to eQHealth Solutions, Inc.
Location:
Lombard, IL, United States
Year:
2021
Region / city:
Africa Region
Topic:
Financial Service Provider Procurement for Cash and Voucher Assistance (CVA)
Document type:
Standard Operating Procedure (SOP)
Organization / Institution:
International Federation of the Red Cross and Red Crescent Societies (IFRC)
Authors:
Maja Tønning, Vanesa Colsa, Sergio Fernandes, Carren Auma Oyayo
Target audience:
IFRC staff, National Society (NS) staff, Partner National Society (PNS) staff involved in FSP procurement for CVA
Validity period:
Ongoing
Approval date:
Not specified
Amendment date:
Not specified
Year:
2019
Region / City:
Ireland
Subject:
Financial sector acquisitions
Document Type:
Regulatory form
Organization / Institution:
Central Bank of Ireland
Author:
Central Bank of Ireland
Target Audience:
MiFID & FSP authorised firms, financial sector professionals
Period of Effect:
Ongoing
Approval Date:
N/A
Amendment Date:
N/A
Year:
2011
Region / Location:
Chile, NCSA
Document Type:
Commissioning Plan
Institution:
Large Synoptic Survey Telescope Project
Authors:
Chuck Claver, Christopher Stubbs
Target Audience:
LSST Project Staff, Scientific Community
Period Covered:
2-year commissioning phase
Last Release Date:
August 15, 2011
Change Log:
Versions 1.0–1.2 with updates to schedule, resources, and activity sequences
Related Documents:
LSST Science Requirements Document (LPM-17), LSST System Requirements (LSE-29), LSST Observatory System Specifications (LSE-30), LSST Telescope & Site Subsystem Requirement (LSE-60), LSST Camera Subsystem Requirements (LSE-59), LSST Data Management Subsystem Requirements (LSE-61), Telescope & Site Integration Plan (LTS-104), Camera Integration Plan (LCA-40), Data Management Integration Plan (TBD)
Acronyms Included:
BFP, CCS, DAC, ISR, FPA, LSR, M1M3, M2, SRD, RVC, OCS, OSS, ORR, TCS, WCS
Note:
Year
Subject:
Library Management
Document Type:
Job Description
Year:
Not provided
Region / City:
Not specified
Topic:
Research ethics, manuscript submission
Document type:
Template
Author:
Not specified
Target audience:
Authors submitting research articles
Period of validity:
Not provided
Approval date:
Not specified
Date of changes:
Not specified
Author:
Gregory Dubois-Felsmann
Organization:
Large Synoptic Survey Telescope (LSST) Project
Document identifier:
LSE-82
Related documents:
LSE-81; LPM-17; LSE-29; LSE-30; LDM-138; LDM-141
Document type:
Technical explanation report
Subject area:
Astronomy data management and survey science
Revision date:
August 15, 2011
Revision history:
Versions 1, 1.1, 1.2
Survey duration referenced:
10-year survey
Primary topics:
science estimates; camera specifications; survey cadence; data management sizing; storage and network requirements
Intended use context:
LSST data management and system design
Technical source type:
Project internal technical documentation
Year:
Not applicable
Region / City:
Not applicable
Subject:
Research ethics and manuscript submission
Document Type:
Submission Template
Organization / Institution:
Not applicable
Author:
Not applicable
Target Audience:
Researchers, Authors submitting manuscripts
Period of validity:
Not applicable
Approval Date:
Not applicable
Date of Changes:
Not applicable
Year:
2019
Region / city:
Not specified
Theme:
Obstetric anaesthesia, research funding
Document type:
Application form
Author:
Not specified
Target audience:
Researchers in obstetric anaesthesia
Period of validity:
Not specified
Approval date:
Not specified
Date of changes:
Not specified
Year:
2025
Region / City:
N/A
Subject:
Transmission system load assessment
Document Type:
Overview
Agency / Organization:
Southwest Power Pool, Inc.
Author:
N/A
Target Audience:
Transmission Customers, Transmission Owners
Period of validity:
N/A
Approval Date:
09/03/2025
Date of Amendments:
N/A
Year:
2023
Region / City:
Bhutan
Topic:
Procurement
Document Type:
Standard Bidding Document
Organization / Institution:
Royal Government of Bhutan, Ministry of Finance
Author:
Ministry of Finance
Target Audience:
Bidders
Period of Effect:
From 1st July 2023
Approval Date:
1st July 2023
Date of Last Change:
20th February 2023
Year:
2025
Region / City:
Southwest Power Pool (SPP)
Topic:
Transmission System Load Performance Requirements
Document Type:
Technical Specification
Agency/Institution:
SPP Operations & SPP Planning Policy & Research Team
Author:
SPP Operations & SPP Planning Policy & Research Team
Target Audience:
Energy professionals, power system engineers, technical stakeholders
Period of validity:
Ongoing, subject to updates
Approval Date:
08/15/2025
Revision Date:
07/24/2025
Purpose:
Binding requirements for interconnecting High Impact Large Loads (HILLs) to the SPP Transmission System
Applicability:
HILLs ≥10 MW (≤69 kV) or ≥50 MW (>69 kV)
Document Version:
0.1
Ride-through performance:
Voltage and frequency disturbance tolerance requirements for HILLs and associated resources
Control Methodology:
Power-electronic loads control strategies outlined
Evaluation and Compliance:
Compliance with technical standards for load behavior during voltage and frequency disturbances
Industry Alignment:
Aligns with ERCOT voltage ride-through requirements and NERC frequency standards
Terms and Acronyms:
Includes technical terms and acronyms used in power system operation
Context:
A technical specification outlining performance requirements for large electrical loads (HILLs) to ensure grid stability during voltage and frequency disturbances.
Year:
2025
Region / City:
Vienna, Austria
Subject:
Conference Paper Submission Guidelines
Document Type:
Submission Guidelines
Organization / Institution:
CIE (International Commission on Illumination)
Author:
Smith, M. D.; Johnson, A.B.; Wang, B.C.
Target Audience:
Researchers, Authors, Conference Participants
Period of Validity:
2025
Approval Date:
N/A
Modification Date:
N/A
Keywords:
Photometry, Colour Rendering, CIE, Full-length Paper
Note:
Contextual Description
Year:
2024
Region / City:
N/A
Subject:
Procurement, Construction
Document Type:
Standard Bidding Document
Organization / Institution:
Millennium Challenge Corporation (MCC)
Author:
N/A
Target Audience:
Contractors, Procurement Officials
Effective Period:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Year:
2024
Region / City:
United States of America
Subject:
Procurement, Pre-Qualification, Large Works, Construction
Document Type:
Template
Organ / Institution:
Millennium Challenge Corporation (MCC)
Author:
Millennium Challenge Corporation
Target Audience:
Accountable Entities, Procurement Agents, Contractors
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified