№ files_lp_3_process_9_45041
File format: docx
Character count: 6399
File size: 32 KB
Unit standard detailing the skills, knowledge, and performance criteria required to safely plan, execute, and manage excavation and loading of materials using an excavator in compliance with workplace and legal requirements.
Unit ID:
HPE2
Domain:
Heavy Equipment Operations
Level:
4
Credits:
15
Purpose:
Train individuals in planning, operating, and managing excavation and loading tasks with an excavator
Prerequisite:
Unit 1113 - Comply with health, safety and environmental rules and regulations pertaining to heavy equipment operations
Equipment:
Hydraulic excavators (wheeled or tracked), plant, tools, fuel, lubricants, attachments
Regulations:
Labour Act No. 11 of 2007; Occupational Health and Safety Regulations No. 18, 1997; industry-specific codes of practice
Quality Assurance:
Accreditation by Namibia Qualifications Authority and Namibia Training Authority; compliance with national assessment and moderation requirements
Performance Elements:
Planning and preparation, demonstrating understanding, excavation and loading, document completion, work area cleanup
Worksite Conditions:
Real or simulated workplaces, expected production targets, safe working practices
Registration Data:
Subfield – Heavy Equipment Operations; Date first registered – not specified; Date this version registered – not specified; Anticipated review – not specified; Body responsible for review – Namibia Training Authority
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2017
Region / City:
Mackay
Theme:
Construction, Civil Engineering
Document Type:
Inspection and Testing Plan (ITP)
Agency / Organization:
Mackay Regional Council
Author:
Not specified
Target Audience:
Contractors, Engineers, Inspectors
Effective Period:
Not specified
Approval Date:
Not specified
Date of Modifications:
Not specified
Year:
1984
Region / City:
North Lanarkshire
Theme:
Roadworks, Public Safety
Document Type:
Application Form
Authority / Institution:
North Lanarkshire Council
Author:
North Lanarkshire Council
Target Audience:
Contractors, Road Authorities, Statutory Undertakers
Period of Validity:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Year:
2025
Note:
Region / City
Topic:
Excavator operation and safety
Document Type:
Competency verification
Organization / Institution:
Big Cat Earthmoving
Author:
Phillip Teacher
Target Audience:
Excavator operators
Year:
2026
Region / City:
Kennedy Space Center
Topic:
Space exploration, Lunar excavation
Document type:
Technical report
Organization:
NASA
Target audience:
Engineers, researchers, space exploration professionals
Period of validity:
N/A
Approval date:
N/A
Modification date:
N/A
Experiment size:
Small, Medium, Large
Test variables:
Linear excavation speed, Cutting depth
Methodology:
Rotational force measurement, Excavation simulation
Description:
Technical report detailing the experimental results of scaling bucket drums for lunar regolith excavation.
Unit ID:
1126
Domain:
Heavy Equipment Operations
Level:
3
Credits:
30
Purpose:
Plan, operate, and maintain hydraulic excavators according to safety and operational standards
Prerequisite:
Unit 1113 - Comply with health, safety and environmental rules and regulations pertaining to heavy equipment operations
Equipment Type:
Hydraulic excavator (wheeled or tracked)
Main Activities:
Pre-use checks, start-up, operational activities, relocation, documentation, clean-up
Safety Requirements:
Compliance with Labour Act No. 11 of 2007, Occupational Health and Safety Regulations No. 18 of 1997, and workplace policies
Quality Assurance:
Accredited by Namibia Qualifications Authority and Namibia Training Authority
Date First Registered:
27 March 2013
Review Body:
Namibia Training Authority
Anticipated Review:
Not specified
Year:
2025
Region / City:
Chiloeches, Guadalajara (Spain)
Topic:
Demolition, Construction Equipment
Document Type:
Press Release
Organization:
Liebherr Ibérica, Hercal
Author:
María Villanueva
Target Audience:
Industry professionals, construction companies, demolition contractors
Period of validity:
2025 and onwards
Approval Date:
27th June 2025
Modification Date:
N/A
Reference number:
RFB 3024/2024
Document type:
Bid specification annexure
Procuring entity:
South African Police Service (SAPS)
Implementing agency:
State Information Technology Agency (SITA)
Country:
South Africa
Year:
2024
Subject matter:
Procurement of F5 load balancers and related services
Products covered:
F5 VELOS hardware, software, licenses and add-ons
Services included:
Maintenance, support and professional services
Service period:
Five years (60 months)
Scope of work:
Supply, design, installation, configuration and support of load balancing and application security solutions
Delivery locations:
SITA Centurion, SITA Beta, Pretoria
Evaluation framework:
Mandatory administrative, technical and contractual evaluation stages
Related annexes:
Annex A (Bidder substantiating evidence), Annex B (Addendum 1)
Year:
2020
Region / City:
Georgia
Subject:
Renewable energy procurement program
Document Type:
Regulatory Order
Agency / Organization:
Georgia Public Service Commission
Author:
Georgia Power
Target Audience:
Commercial and Industrial customers
Effective Period:
From 2020 onward
Approval Date:
January 23, 2020
Amendment Date:
N/A
Note:
Year
Subject:
Load Aggregation Point selection
Document type:
Instructional document
Organization / institution:
California Independent System Operator
Target audience:
Scheduling Coordinators, Load Serving Entities
Year:
2025
Region / City:
N/A
Subject:
Transmission system load assessment
Document Type:
Overview
Agency / Organization:
Southwest Power Pool, Inc.
Author:
N/A
Target Audience:
Transmission Customers, Transmission Owners
Period of validity:
N/A
Approval Date:
09/03/2025
Date of Amendments:
N/A
Year:
Not specified
Region / City:
Not specified
Topic:
Crane operation, safety protocols, risk assessment
Document Type:
Safety procedure
Organization / Institution:
MPC
Author:
Not specified
Target Audience:
Employees or contractors of MPC
Period of validity:
Not specified
Approval Date:
Not specified
Revision Date:
Not specified
Year:
2025
Region / City:
Southwest Power Pool (SPP)
Topic:
Transmission System Load Performance Requirements
Document Type:
Technical Specification
Agency/Institution:
SPP Operations & SPP Planning Policy & Research Team
Author:
SPP Operations & SPP Planning Policy & Research Team
Target Audience:
Energy professionals, power system engineers, technical stakeholders
Period of validity:
Ongoing, subject to updates
Approval Date:
08/15/2025
Revision Date:
07/24/2025
Purpose:
Binding requirements for interconnecting High Impact Large Loads (HILLs) to the SPP Transmission System
Applicability:
HILLs ≥10 MW (≤69 kV) or ≥50 MW (>69 kV)
Document Version:
0.1
Ride-through performance:
Voltage and frequency disturbance tolerance requirements for HILLs and associated resources
Control Methodology:
Power-electronic loads control strategies outlined
Evaluation and Compliance:
Compliance with technical standards for load behavior during voltage and frequency disturbances
Industry Alignment:
Aligns with ERCOT voltage ride-through requirements and NERC frequency standards
Terms and Acronyms:
Includes technical terms and acronyms used in power system operation
Context:
A technical specification outlining performance requirements for large electrical loads (HILLs) to ensure grid stability during voltage and frequency disturbances.
Document type:
Regulatory guidance
Subject area:
Stormwater management
Program:
Municipal Regional Permit
Provision:
C.10 Trash Load Reduction
Fiscal year:
2024–2025
Regulatory authority:
Regional Water Board
Permittees:
Population-based Permittees; Flood Management Agencies
Compliance benchmarks:
100% trash load reduction
Key topics:
Trash load reduction calculation; full trash capture systems; control measures; compliance status reporting
Applicable entities:
Municipal agencies and flood management agencies
Geographic scope:
Jurisdictional areas generating Very High, High, or Moderate trash levels
Source type:
Permit reporting guidance
Year:
2024
Region / City:
California
Topic:
Renewables Portfolio Standard (RPS), Renewable Energy Credits (REC)
Document Type:
Guidance
Organization / Institution:
California Energy Commission (CEC)
Author:
California Energy Commission (CEC)
Target Audience:
Load Serving Entities (LSEs), Retail Sellers, Publicly Owned Electric Utilities (POU)
Effective Period:
2024
Approval Date:
Not specified
Modification Date:
Not specified
Registered Entity:
Registered name of entity being audited
NCR Number:
NCRnnnnn
Compliance Enforcement Authority:
Region or NERC performing audit
Compliance Assessment Date(s):
Month DD, YYYY, to Month DD, YYYY
Compliance Monitoring Method:
[On-site Audit | Off-site Audit | Spot Check]
Names of Auditors:
Supplied by CEA
Applicability of Requirements:
BA, DP, GO, GOP, PA/PC, RC, RP, RSG, TO, TOP, TP, TSP
Requirements Covered:
D.B.1, D.B.2, D.B.3, D.B.4, R6, R7, R8, R9, R10, D.B.11, D.B.12
UFLS Entities Definition:
Distribution Providers, UFLS-Only Distribution Providers, Transmission Owners, and Transmission Owners that own Elements identified in the UFLS program
Supporting Evidence:
Compliance narratives, reports, memorandums, emails, and other documentation demonstrating compliance with PRC-006-5 requirements
Subject Matter Experts:
SME Name, Title, Organization, Requirement(s)
Compliance Assessment Approach:
Verification of joint regional review participation, island identification, and UFLS program adoption within Western Interconnection
Time Horizon:
Long-term Planning
VRF Level:
Medium
Year:
2019
Region / City:
N/A
Subject:
Committee Structure, Strategic Planning, Faculty Review
Document Type:
Report
Organization / Institution:
N/A
Author:
N/A
Target Audience:
Faculty Members
Effective Period:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Note:
Year
Year:
2025
Region / city:
SPP
Topic:
Energy, Power Generation, Grid Interconnection
Document Type:
Report
Organization / Institution:
SPP
Author:
SPP
Target Audience:
Utility companies, energy producers, transmission operators
Effective Period:
2025-2026
Approval Date:
2025-10-24
Revision Date:
2025-11-25
Context:
A report outlining the High Impact Large Load Generator Assessment (HILLGA) process, its requirements, and its impact on the existing power grid interconnection procedures.
Year:
2025
Region / City:
California
Theme:
Energy, Forecasting, Grid Operations, Renewable Energy
Document Type:
Grant Funding Opportunity
Organization:
California Energy Commission
Author:
California Energy Commission
Target Audience:
Researchers, Utilities, Energy Market Participants, Policy Makers
Period of Validity:
October 2025 onwards
Approval Date:
October 2025
Date of Modifications:
N/A