№ lp_1_2_19794
File format: docx
Character count: 6068
File size: 1364 KB
Year:
2025
Region / city:
SPP
Topic:
Energy, Power Generation, Grid Interconnection
Document Type:
Report
Organization / Institution:
SPP
Author:
SPP
Target Audience:
Utility companies, energy producers, transmission operators
Effective Period:
2025-2026
Approval Date:
2025-10-24
Revision Date:
2025-11-25
Context:
A report outlining the High Impact Large Load Generator Assessment (HILLGA) process, its requirements, and its impact on the existing power grid interconnection procedures.
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Note:
Year
Topic:
Electrofusion jointing, ECU, generators
Document type:
Guidance
Year:
2018
Note:
Facility Name
Year:
2025
Region / City:
Dhaka, Bangladesh
Topic:
Auction of used vehicles and generator
Document type:
Bid document
Organization / Institution:
Handicap International (Humanity & Inclusion)
Author:
Handicap International Bangladesh
Target audience:
Bidders
Period of validity:
From 09th to 30th April 2025
Approval date:
2025
Date of changes:
None
Year:
2024
Region / City:
Milton
Topic:
Electricity distribution rates, rate adjustments, and regulatory filings
Document Type:
Regulatory Filing
Organization:
Milton Hydro Inc.
Author:
Milton Hydro Inc.
Target Audience:
Ontario Energy Board (OEB) staff, regulatory bodies
Period of validity:
Q4 2024
Approval Date:
October 1, 2024
Date of changes:
None
Year:
2024
Region / City:
Perth
Topic:
Generator Performance Standards, Compliance Assessment
Document Type:
Template
Organization:
Western Power
Author:
Western Power
Target Audience:
Market Participants, Generating System Owners
Period of Validity:
Ongoing
Approval Date:
20 March 2024
Amendment Date:
Not specified
Year:
2021
Region / city:
Western Australia
Topic:
Generator Performance Standards, Trigger Events
Document type:
Technical Standard
Author:
Western Power
Target audience:
Market Participants, Network Operators, AEMO
Period of validity:
N/A
Approval date:
N/A
Date of changes:
N/A
RFQ Number:
32 NAC/KCO
Issue Date:
06 June 2022
Closing Date:
16 June 2022
Closing Time:
4:00 PM Kabul Time
Organization:
Norwegian Afghanistan Committee
Office Location:
Kabul Main Office, Shar-e-Naw, Kabul, Afghanistan
Type of Document:
Request for Quotations
Subject:
Procurement of FG Wilson Generator
Product Specification:
FG Wilson Generator, Perkins Engine, 70 KW, sound proof, model 2020, Made in UK
Quantity:
1 unit
Currency:
Afghani (AFN)
Delivery Location:
NAC Kabul Main Office
Payment Terms:
Payment after delivery via wire transfer or check
Tax Conditions:
2% tax for registered vendors; 7% tax for unregistered vendors
Eligible Vendors:
Locally registered vendors
Submission Method:
Sealed quotation
Submission Address:
NAC Kabul Office
Applicable Law:
Afghan Law
Time Frame for Evaluation:
June 2022
Procurement Authority:
Norwegian Afghanistan Committee
Year:
2025
Region / City:
Garden City, Kansas
Topic:
Electrical Design for Generator Installation
Document Type:
Design Memorandum
Organization / Institution:
City of Garden City
Author:
Wilson & Company
Target Audience:
Electrical contractors, city personnel, engineers
Effective Period:
2025
Approval Date:
May 23, 2025
Date of Last Modification:
N/A
Year:
2025
Region / City:
Garden City, Kansas
Theme:
Generator Installation
Document Type:
Invitation to Bid
Organization / Institution:
Lee Richardson Zoo, City of Garden City
Author:
Jakob Stegman, Kristi Newland
Target Audience:
Contractors and Bidders
Effective Period:
Until Bid Opening on August 8, 2025
Approval Date:
Not specified
Modification Date:
Not specified
Publication date:
12 January 2026
Publisher:
Ofgem (Office of Gas and Electricity Markets)
Copyright:
Crown copyright 2025
Document type:
Guidance / Regulatory guidance
Scope:
Data assurance requirements for data submissions to Ofgem
Applicable entities:
Electricity and gas network companies, National Energy System Operator, Nuclear Energy Generation, Carbon Dioxide Transport and Storage licensees
Framework:
RIIO
Includes:
Network Data Assurance Report (NetDAR) template, Risk Assessment (RA) template, Exceptional Submission Assurance Template (ESAT)
Risk management:
Risk assessment and data assurance activities for completeness, accuracy, and timeliness of submissions
Version history:
1.1–2.5 (release dates from 02/15 to 11/25)
Contact:
Daniel Kyei, Networks, Telephone: 020 7901 7345, Email: [email protected]
Address:
10 South Colonnade, Canary Wharf, London, E14 4PU
Availability:
www.ofgem.gov.uk
Re-use enquiries:
[email protected]
Description:
Guidance document outlining the data assurance requirements, risk assessment methodology, assurance activities, and reporting formats for licensee data submissions to Ofgem under the RIIO framework.
Year:
2024
Region / City:
MISO
Topic:
Generator Interconnection
Document Type:
Manual
Organization / Institution:
MISO
Author:
A. Godbole
Target Audience:
Users of MISO tariff and related documents
Effective Period:
Ongoing
Approval Date:
January 22, 2024
Revision Date:
January 22, 2024
Year:
2025
Region / City:
Dhaka, Bangladesh
Theme:
Auction of used vehicles and generator
Document Type:
Bidding Document
Organization:
Handicap International Federation (Humanity & Inclusion)
Author:
Handicap International Federation
Target Audience:
Potential bidders
Period of Action:
13th – 30th April 2025
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2020
Region / City:
Gilgit
Theme:
Hydro Power Projects
Document Type:
Request for Proposal (RFP)
Organization / Institution:
Karakoram International University
Author:
Karakoram International University
Target Audience:
Bidders, Suppliers, Contractors
Period of Validity:
Not specified
Approval Date:
June 17, 2020
Amendment Date:
Not specified
Contextual Description:
A request for proposal detailing requirements for the supply of materials and installation services for a hydro-power pump and electricity generator prototype for a funded project.
Year:
2024
Region / City:
Ontario
Subject:
Electricity Rates Adjustment and Settlement Issues
Document Type:
Regulatory Submission
Organization / Institution:
Ontario Energy Board (OEB)
Author:
Westario Power Inc.
Target Audience:
OEB Staff, Regulatory Authorities
Period of Validity:
2024
Approval Date:
November 13, 2024
Date of Last Change:
November 13, 2024
Reference number:
RFB 3024/2024
Document type:
Bid specification annexure
Procuring entity:
South African Police Service (SAPS)
Implementing agency:
State Information Technology Agency (SITA)
Country:
South Africa
Year:
2024
Subject matter:
Procurement of F5 load balancers and related services
Products covered:
F5 VELOS hardware, software, licenses and add-ons
Services included:
Maintenance, support and professional services
Service period:
Five years (60 months)
Scope of work:
Supply, design, installation, configuration and support of load balancing and application security solutions
Delivery locations:
SITA Centurion, SITA Beta, Pretoria
Evaluation framework:
Mandatory administrative, technical and contractual evaluation stages
Related annexes:
Annex A (Bidder substantiating evidence), Annex B (Addendum 1)
Year:
2020
Region / City:
Georgia
Subject:
Renewable energy procurement program
Document Type:
Regulatory Order
Agency / Organization:
Georgia Public Service Commission
Author:
Georgia Power
Target Audience:
Commercial and Industrial customers
Effective Period:
From 2020 onward
Approval Date:
January 23, 2020
Amendment Date:
N/A
Note:
Year
Subject:
Load Aggregation Point selection
Document type:
Instructional document
Organization / institution:
California Independent System Operator
Target audience:
Scheduling Coordinators, Load Serving Entities
Year:
2025
Region / City:
N/A
Subject:
Transmission system load assessment
Document Type:
Overview
Agency / Organization:
Southwest Power Pool, Inc.
Author:
N/A
Target Audience:
Transmission Customers, Transmission Owners
Period of validity:
N/A
Approval Date:
09/03/2025
Date of Amendments:
N/A
Year:
Not specified
Region / City:
Not specified
Topic:
Crane operation, safety protocols, risk assessment
Document Type:
Safety procedure
Organization / Institution:
MPC
Author:
Not specified
Target Audience:
Employees or contractors of MPC
Period of validity:
Not specified
Approval Date:
Not specified
Revision Date:
Not specified