№ lp_1_2_56224
File format: docx
Character count: 2897
File size: 16 KB
This document outlines the updated policy for Large Woody Material (LWM) placement in aquatic environments, focusing on key piece volume, total piece count, and total wood volume in design calculations.
Year:
2023
Region / City:
Western Washington
Topic:
Large Woody Material Placement
Document Type:
Policy Update
Organization:
WSDOT
Author:
WSDOT
Target Audience:
Environmental Designers, Aquatic Habitat Planners
Effective Date:
Immediate
Revision Date:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2025
Region / City:
Wisconsin
Theme:
Native seed, woody vegetation, living snow fence installation and maintenance
Document Type:
Request for Qualifications
Organization / Institution:
Wisconsin Department of Transportation
Author:
Wisconsin Department of Transportation
Target Audience:
Contractors seeking pre-certification for installation and maintenance of native seed, woody vegetation, and living snow fence
Period of Validity:
Until next solicitation (maximum every 2 years)
Approval Date:
September 5, 2025
Date of Changes:
None
Note:
Year
Document Type:
Installation Guide
Year:
2013
Region / city:
Semangkok Forest Reserve, Selangor, Malaysia
Topic:
Coarse Woody Debris, Carbon Flux, Forest Ecosystems
Document Type:
Research Study
Organization / Institution:
Forestry and Forest Products Research Institute, Tsukuba, Ibaraki, Japan; Tohoku Research Center, Forestry and Forest Products Research Institute, Morioka, Iwate, Japan; Forest Research Institute Malaysia, Kepong, Selangor, Malaysia
Author(s):
Tamotsu Sato, Tsutomu Yagihashi, Kaoru Niiyama, Abd. Rahman bin Kassim, Azizi Ripin
Target Audience:
Researchers, Environmental Scientists, Ecologists
Date of Approval:
Not specified
Date of Modification:
Not specified
Year:
2020
Region / city:
Harvard Forest, USA
Theme:
Biomass estimation
Document type:
Research paper
Organization / institution:
Harvard Forest Long-Term Ecological Research Site
Author:
Finzi AC, Giasson M-A, Barker Plotkin AA, Aber JD, Boose ER, Davidson EA, Dietze MC, Ellison AM, Frey SD, Goldman E, Keenan TF, Melillo JM, Munger JW, Nadelhoffer KJ, Ollinger SV, Orwig DA, Pederson N, Richardson AD, Savage K, Tang J, Thompson JR, Williams CA, Wofsy SC, Zhou Z, Foster DR
Target audience:
Researchers, ecologists, environmental scientists
Effective date:
2020
Date of approval:
2020
Date of revisions:
2020
Keywords:
Biomass, woody species, equations, ForestGEO, Harvard Forest, ecological research
Year:
[Exercise year]
Region / City:
[Location]
Subject:
Public Health Emergency Preparedness, Exercise Report
Document Type:
After Action Report & Improvement Plan
Agency:
[Agency]
Author:
[Author]
Target Audience:
Local planners, public health officials, emergency responders
Period of validity:
[Exercise period]
Approval Date:
[Approval date]
Date of last changes:
[Last changes date]
Year:
1879
Region / city:
Pennsylvania
Theme:
Native American history, assimilation, education
Document type:
Documentary analysis
Organization / institution:
Carlisle Indian Industrial School
Author:
Not specified
Target audience:
Scholars, educators, students
Period of action:
1879–1918
Approval date:
Not specified
Modification date:
Not specified
Year:
Not specified
Region / City:
Not specified
Subject:
Account Types, Insurance Coverage
Document Type:
Informational Guide
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Account holders in a credit union
Period of Validity:
Not specified
Date of Approval:
Not specified
Date of Changes:
Not specified
Year:
2026
Location:
United States
Category:
Household Items / Electronics
Document Type:
Sales Listing
Seller:
Private Individual
Items Included:
Comforter set, metal rack, TV cabinet, home entertainment speakers and amplifiers, Microsoft X-Box 360, oak cocktail table, decorative duck decoys
Condition:
Good to Very Good, Nearly New
Price Range:
$15–$975
Quantity:
Multiple
Brand Names:
Mirage, Paradigm, Klipsch, Onkyo, Microsoft
Measurements:
Provided for each furniture and electronic item
Year:
Not specified
Region / City:
Not specified
Topic:
Literature, Reading Response Journals
Document Type:
Educational Assignment
Institution:
Not specified
Author:
Geoffrey Trease
Target Audience:
Students
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Note:
Contextual Description
Year:
2011
Region / Location:
Chile, NCSA
Document Type:
Commissioning Plan
Institution:
Large Synoptic Survey Telescope Project
Authors:
Chuck Claver, Christopher Stubbs
Target Audience:
LSST Project Staff, Scientific Community
Period Covered:
2-year commissioning phase
Last Release Date:
August 15, 2011
Change Log:
Versions 1.0–1.2 with updates to schedule, resources, and activity sequences
Related Documents:
LSST Science Requirements Document (LPM-17), LSST System Requirements (LSE-29), LSST Observatory System Specifications (LSE-30), LSST Telescope & Site Subsystem Requirement (LSE-60), LSST Camera Subsystem Requirements (LSE-59), LSST Data Management Subsystem Requirements (LSE-61), Telescope & Site Integration Plan (LTS-104), Camera Integration Plan (LCA-40), Data Management Integration Plan (TBD)
Acronyms Included:
BFP, CCS, DAC, ISR, FPA, LSR, M1M3, M2, SRD, RVC, OCS, OSS, ORR, TCS, WCS
Note:
Year
Subject:
Library Management
Document Type:
Job Description
Year:
Not provided
Region / City:
Not specified
Topic:
Research ethics, manuscript submission
Document type:
Template
Author:
Not specified
Target audience:
Authors submitting research articles
Period of validity:
Not provided
Approval date:
Not specified
Date of changes:
Not specified
Author:
Gregory Dubois-Felsmann
Organization:
Large Synoptic Survey Telescope (LSST) Project
Document identifier:
LSE-82
Related documents:
LSE-81; LPM-17; LSE-29; LSE-30; LDM-138; LDM-141
Document type:
Technical explanation report
Subject area:
Astronomy data management and survey science
Revision date:
August 15, 2011
Revision history:
Versions 1, 1.1, 1.2
Survey duration referenced:
10-year survey
Primary topics:
science estimates; camera specifications; survey cadence; data management sizing; storage and network requirements
Intended use context:
LSST data management and system design
Technical source type:
Project internal technical documentation
Year:
Not applicable
Region / City:
Not applicable
Subject:
Research ethics and manuscript submission
Document Type:
Submission Template
Organization / Institution:
Not applicable
Author:
Not applicable
Target Audience:
Researchers, Authors submitting manuscripts
Period of validity:
Not applicable
Approval Date:
Not applicable
Date of Changes:
Not applicable
Year:
2019
Region / city:
Not specified
Theme:
Obstetric anaesthesia, research funding
Document type:
Application form
Author:
Not specified
Target audience:
Researchers in obstetric anaesthesia
Period of validity:
Not specified
Approval date:
Not specified
Date of changes:
Not specified
Year:
2025
Region / City:
N/A
Subject:
Transmission system load assessment
Document Type:
Overview
Agency / Organization:
Southwest Power Pool, Inc.
Author:
N/A
Target Audience:
Transmission Customers, Transmission Owners
Period of validity:
N/A
Approval Date:
09/03/2025
Date of Amendments:
N/A
Year:
2023
Region / City:
Bhutan
Topic:
Procurement
Document Type:
Standard Bidding Document
Organization / Institution:
Royal Government of Bhutan, Ministry of Finance
Author:
Ministry of Finance
Target Audience:
Bidders
Period of Effect:
From 1st July 2023
Approval Date:
1st July 2023
Date of Last Change:
20th February 2023
Year:
2025
Region / City:
Southwest Power Pool (SPP)
Topic:
Transmission System Load Performance Requirements
Document Type:
Technical Specification
Agency/Institution:
SPP Operations & SPP Planning Policy & Research Team
Author:
SPP Operations & SPP Planning Policy & Research Team
Target Audience:
Energy professionals, power system engineers, technical stakeholders
Period of validity:
Ongoing, subject to updates
Approval Date:
08/15/2025
Revision Date:
07/24/2025
Purpose:
Binding requirements for interconnecting High Impact Large Loads (HILLs) to the SPP Transmission System
Applicability:
HILLs ≥10 MW (≤69 kV) or ≥50 MW (>69 kV)
Document Version:
0.1
Ride-through performance:
Voltage and frequency disturbance tolerance requirements for HILLs and associated resources
Control Methodology:
Power-electronic loads control strategies outlined
Evaluation and Compliance:
Compliance with technical standards for load behavior during voltage and frequency disturbances
Industry Alignment:
Aligns with ERCOT voltage ride-through requirements and NERC frequency standards
Terms and Acronyms:
Includes technical terms and acronyms used in power system operation
Context:
A technical specification outlining performance requirements for large electrical loads (HILLs) to ensure grid stability during voltage and frequency disturbances.
Year:
2025
Region / City:
Vienna, Austria
Subject:
Conference Paper Submission Guidelines
Document Type:
Submission Guidelines
Organization / Institution:
CIE (International Commission on Illumination)
Author:
Smith, M. D.; Johnson, A.B.; Wang, B.C.
Target Audience:
Researchers, Authors, Conference Participants
Period of Validity:
2025
Approval Date:
N/A
Modification Date:
N/A
Keywords:
Photometry, Colour Rendering, CIE, Full-length Paper
Note:
Contextual Description
Year:
2024
Region / City:
N/A
Subject:
Procurement, Construction
Document Type:
Standard Bidding Document
Organization / Institution:
Millennium Challenge Corporation (MCC)
Author:
N/A
Target Audience:
Contractors, Procurement Officials
Effective Period:
N/A
Approval Date:
N/A
Amendment Date:
N/A