№ lp_1_2_23600
File format: docx
Character count: 70573
File size: 118 KB
This document outlines procedures for overseeing reactor facilities in shutdown due to significant performance or operational issues, detailing oversight, assessment, and restart actions required by NRC.
Effective Date:
10/16/2023
Note:
Region / city
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2024
Region / City:
United Kingdom
Topic:
Holiday pay, employee benefits
Document type:
Guidelines
Organization:
ECA
Author:
ECA
Target Audience:
Employers, JIB operatives
Effective period:
December 2024 - January 2025
Approval date:
Not specified
Amendment date:
Not specified
Contextual description:
Guidelines for employers on holiday shutdown, pay rates, and allowances for JIB operatives during the Christmas period.
Effective Date:
01/01/2021
Year:
2021
Note:
Region / city
Subject:
Occupational Radiation Exposure
Document Type:
Inspection Procedure
Organization:
NRC
Target Audience:
Inspectors, Licensees
Approval Date:
01/01/2021
Year:
2025
Region / city:
Massachusetts
Topic:
Financial hardship, eviction, federal government shutdown
Document type:
Notice and certification
Organization / institution:
Massachusetts government
Author:
Massachusetts State Government
Target audience:
Federal workers, tenants in Massachusetts
Period of validity:
Indefinite
Approval date:
November 25, 2025
Date of changes:
Not specified
Year:
N/A
Region / city:
N/A
Topic:
Power system, wind energy, inverter systems
Document type:
Technical specification
Organization:
N/A
Author:
N/A
Target audience:
Engineers, power system designers
Effective period:
N/A
Approval date:
N/A
Date of amendments:
N/A
Publication date:
February 2024
Year:
2024
Facility:
Heysham 1 Nuclear Power Station
Reactor type:
Advanced Gas-Cooled Reactor
Reactor unit:
Reactor 1
Periodic shutdown identifier:
027
Shutdown period:
October–December 2023
Planned shutdown duration:
69 days
Document type:
Regulatory assessment report
Issuing authority:
Office for Nuclear Regulation
Dutyholder:
EDF Energy Nuclear Generation Limited
Regulatory framework:
Nuclear Site Licence Conditions 28 and 30
Subject areas:
Nuclear safety, examination, inspection, maintenance and testing
Licence instrument referenced:
Licence Instrument 641
Geographic location:
United Kingdom
Year:
2022
Region / City:
Argonne, Illinois
Theme:
Power Shutdown, Safety, Operations
Document Type:
Internal Operations Document
Organization / Institution:
Argonne National Laboratory
Author:
Not specified
Target Audience:
APS staff, engineers, and project managers
Period of Action:
January 2023
Approval Date:
Not specified
Date of Changes:
Not specified
Note:
Contextual Description
Year:
2024
Region / City:
Torness Nuclear Power Station
Subject:
Nuclear Reactor Start-Up Consent
Document Type:
Project Assessment Report
Organization / Institution:
Office for Nuclear Regulation (ONR)
Author:
EDF Energy Nuclear Generation Limited
Target Audience:
Regulatory Authorities, Nuclear Industry Professionals
Period of Effect:
2024
Approval Date:
Not specified
Date of Changes:
Not specified
Contextual description:
Project assessment report on the consent process for the start-up of Torness Reactor 1 after its 2024 periodic shutdown, focusing on inspection and compliance with safety standards.
Year:
2023
Region / City:
Argonne National Laboratory
Theme:
Safety, Operational Planning, Equipment Maintenance
Document Type:
Internal Memo
Organization / Institution:
Argonne National Laboratory
Author:
Multiple Staff Members
Target Audience:
APS Staff
Period of Validity:
December 2022 - February 2023
Approval Date:
Not Specified
Date of Changes:
Ongoing
Event Date:
January 31, 2023
Safety Update:
Ongoing
Context:
A detailed internal memo regarding vacation schedules, operational shutdowns, safety updates, and equipment maintenance plans at the Argonne National Laboratory, specifically for the APS staff.
Year:
2021
Date Range:
August 2–8, 2021
Organization:
Advanced Photon Source (APS)
Location:
Argonne National Laboratory
Document Type:
Weekly operations report and shutdown planning update
Operational Status:
Limited Operations+
Onsite Presence Schedule:
August 2–8, 2021 (Mon–Fri)
Shutdown Period:
2021-2 Supplemental Time Shutdown
Power Shutdown Dates:
August 5, 2021; August 10, 2021
Affected Beamline Sectors:
12–23; 24–35; 18–27
Key Topics:
Safety monitoring, beamline maintenance, construction updates, power shutdown coordination, PSS validations, LNDS Module C installation
Supervising Engineer (Focusing Mirror Installation 9BM):
Mike Fisher
Contractors Mentioned:
Meade; Power Construction
Completion Milestones:
437 build-out expected Feb/Mar 2022; 25-ID laser control room by end of 2021
Year:
Not specified
State:
North Carolina
Country:
United States
Regulatory Framework:
Revised Total Coliform Rule [15A NCAC 18C Section .1539 (§141.854(i)(1); §141.860(b)(2)]
Document Type:
Regulatory compliance checklist and certification form
Issuing Authority:
Public Water Supply Section
Applicable To:
Seasonal public water systems not fully pressurized during the off-season
Water System Name:
SOUTHWEST PARK
Water System Number:
NC3041094
Subject:
Start-up, shutdown, disinfection, flushing, monitoring, and certification requirements
Compliance Requirement:
Annual completion and submission prior to serving water to the public
Submission Methods:
Mail, Email, Fax
Referenced Standards:
AWWA Standards C654, C652, C651
Author:
Lori Montgomery
Publication Date:
October 6
Type of Document:
Newspaper article
Genre:
Political news report
Subject:
U.S. government shutdown and federal debt limit standoff
Key Figures:
John A. Boehner; Barack Obama; Jack Lew; Nancy Vanden Houten; Ted Cruz; Paul Ryan; Dave Camp
Institutions Mentioned:
U.S. House of Representatives; White House; U.S. Treasury Department
Geographic Focus:
United States; Washington, D.C.
Economic Context:
$16.7 trillion federal debt limit; potential default deadlines of October 17 and early November
Themes:
Budget negotiations; partisan conflict; risk of sovereign default; federal payments and interest obligations
Year:
2025
Region / City:
Massachusetts
Topic:
SNAP benefits, federal shutdown, food assistance
Document Type:
Informational
Institution:
DTA (Department of Transitional Assistance)
Author:
Massachusetts Department of Transitional Assistance
Target Audience:
SNAP recipients, low-income residents, healthcare providers
Period of Validity:
November 2025
Approval Date:
October 2025
Modification Date:
N/A
Year:
2022
Region / City:
APS
Subject:
Shift presence and shutdown planning
Document Type:
Meeting Notes
Organization:
Argonne National Laboratory
Author:
Nena, Matt, Wendy, Ashley, Liz, Clay, Bruno
Target Audience:
APS staff and beamline personnel
Period of Action:
August 16, 2022 - September 11, 2022
Approval Date:
N/A
Modification Date:
N/A
Operational Notes:
Planning details on machine studies, shutdowns, and maintenance
Shutdown Dates:
August 5-22, 2022
Scheduled Shutdown:
December/January 2023
Context Description:
Detailed shift presence, shutdown schedules, and operational updates related to the APS facility’s maintenance and beamline activities.
Year:
2021
Region / City:
Argonne National Laboratory
Topic:
EFOG Operations, COVID Testing, Vaccination Program, Shutdown Work
Document Type:
Operations Update
Author:
Unknown
Target Audience:
EFOG Team, Floor Coordinators, Laboratory Staff
Period of Validity:
April/May 2021
Approval Date:
03/31/2021
Modification Date:
03/31/2021
Note:
Context
Year:
2013
Region / City:
Palo Alto, CA
Theme:
Utility Management, Health Care System Operations
Document Type:
Health Care System Memorandum
Organization / Institution:
Veterans Affairs Palo Alto Health Care System
Author:
Elizabeth Joyce Freeman
Target Audience:
VAPAHCS staff, patients, and visitors
Effective Date:
August 14, 1995
Issue Date:
July 22, 2013
Rescission Date:
July 31, 2016
Date of Changes:
July 22, 2013
Responsible Official:
Chief, Engineering Service
Reference Documents:
Health Care System Memorandum, “Utilities Management Program,” Health Care System Memorandum, “Engineering Work Requests,” “Environment of Care Guidebook,” VHA Center for Engineering & Occupational Safety and Health (CEOSH)
Context Description:
A memorandum outlining procedures and responsibilities for planned utility interruptions within the Veterans Affairs Palo Alto Health Care System to minimize impact on patient care.
Year:
2025
Region / City:
Heysham
Topic:
Nuclear energy, reactor maintenance, shutdown deferral
Document type:
Project assessment report
Organization / Institution:
Office for Nuclear Regulation
Author:
Not specified
Target audience:
Not specified
Period of validity:
Up to 06 October 2025
Approval date:
May 2025
Date of changes:
None
Year:
2020
Organization:
Generation-IV International Forum (GIF)
Authors:
A. Alemberti, K. Tuček, M. Tarantino, M. Takahashi, T. Obara, M. Kondo, A. Moiseev, L. Tocheny, Y. Kuzina, I.S. Hwang, C. Smith, A. Moisseytsev, Y. Wu, M. Jin
Type of document:
Technical safety assessment report
Topic:
Nuclear reactor safety, Generation IV lead-cooled fast reactors
Target audience:
Researchers, engineers, regulatory authorities
Date of publication:
June 2020
Related documents:
Safety Design Criteria for Generation IV Lead-cooled Fast Reactor System (March 2021)
Region:
International
Language:
English
Year:
2025
Region / city:
Pelindaba, Brits Magisterial District, Madibeng Municipality, North West
Theme:
Nuclear energy, procurement
Document type:
Invitation to bid
Organization / institution:
South African Nuclear Energy Corporation SOC Ltd (Necsa)
Author:
Not specified
Target audience:
Suppliers, contractors
Period of validity:
90 days (commencing from the closing date)
Approval date:
Not specified
Date of amendments:
Not specified
Effective Date:
January 1, 2026
Chapter:
0308
Document Type:
Manual
Region / City:
United States
Thematic Focus:
Nuclear Reactor Security
Institution:
U.S. Nuclear Regulatory Commission (NRC)
Target Audience:
NRC licensees, nuclear reactor operators, security personnel
Date Approved:
January 1, 2026
Year:
2025
Organization:
U.S. Nuclear Regulatory Commission (NRC)
Document Type:
Inspection Manual Appendix
Topic:
Reactor Oversight Process, Baseline Inspection Program
Effective Date:
May 13, 2025
Applicability:
NRC baseline inspection program
Responsible Offices:
Office of Nuclear Reactor Regulation, Office of Nuclear Security and Incident Response
Scope:
Monitoring of baseline inspection procedures and comprehensive review
Roles:
Director, Regional Directors, Chief of Reactor Inspection Branch, Branch Chiefs, Baseline IP Leads, Points of Contact
Frequency:
Quarterly monitoring, five-year comprehensive review