Weekly internal operations report detailing staffing schedules, safety checks, construction activities, beamline maintenance, and coordinated power shutdown planning for APS sectors during the August 2–8, 2021 operational period.
Year: 2021
Date Range: August 2–8, 2021
Organization: Advanced Photon Source (APS)
Location: Argonne National Laboratory
Document Type: Weekly operations report and shutdown planning update
Operational Status: Limited Operations+
Onsite Presence Schedule: August 2–8, 2021 (Mon–Fri)
Shutdown Period: 2021-2 Supplemental Time Shutdown
Power Shutdown Dates: August 5, 2021; August 10, 2021
Affected Beamline Sectors: 12–23; 24–35; 18–27
Key Topics: Safety monitoring, beamline maintenance, construction updates, power shutdown coordination, PSS validations, LNDS Module C installation
Supervising Engineer (Focusing Mirror Installation 9BM): Mike Fisher
Contractors Mentioned: Meade; Power Construction
Completion Milestones: 437 build-out expected Feb/Mar 2022; 25-ID laser control room by end of 2021
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.