№ lp_1_28793
File format: docx
Character count: 5457
File size: 46 KB
Systematic assessment report on the safety characteristics, historical operation feedback, R&D status, and future research needs of Generation IV lead-cooled fast reactor systems.
Year:
2020
Organization:
Generation-IV International Forum (GIF)
Authors:
A. Alemberti, K. Tuček, M. Tarantino, M. Takahashi, T. Obara, M. Kondo, A. Moiseev, L. Tocheny, Y. Kuzina, I.S. Hwang, C. Smith, A. Moisseytsev, Y. Wu, M. Jin
Type of document:
Technical safety assessment report
Topic:
Nuclear reactor safety, Generation IV lead-cooled fast reactors
Target audience:
Researchers, engineers, regulatory authorities
Date of publication:
June 2020
Related documents:
Safety Design Criteria for Generation IV Lead-cooled Fast Reactor System (March 2021)
Region:
International
Language:
English
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2025
Region / City:
Heysham
Topic:
Nuclear energy, reactor maintenance, shutdown deferral
Document type:
Project assessment report
Organization / Institution:
Office for Nuclear Regulation
Author:
Not specified
Target audience:
Not specified
Period of validity:
Up to 06 October 2025
Approval date:
May 2025
Date of changes:
None
Year:
2025
Region / city:
Pelindaba, Brits Magisterial District, Madibeng Municipality, North West
Theme:
Nuclear energy, procurement
Document type:
Invitation to bid
Organization / institution:
South African Nuclear Energy Corporation SOC Ltd (Necsa)
Author:
Not specified
Target audience:
Suppliers, contractors
Period of validity:
90 days (commencing from the closing date)
Approval date:
Not specified
Date of amendments:
Not specified
Effective Date:
January 1, 2026
Chapter:
0308
Document Type:
Manual
Region / City:
United States
Thematic Focus:
Nuclear Reactor Security
Institution:
U.S. Nuclear Regulatory Commission (NRC)
Target Audience:
NRC licensees, nuclear reactor operators, security personnel
Date Approved:
January 1, 2026
Effective Date:
10/16/2023
Note:
Region / city
Year:
2025
Organization:
U.S. Nuclear Regulatory Commission (NRC)
Document Type:
Inspection Manual Appendix
Topic:
Reactor Oversight Process, Baseline Inspection Program
Effective Date:
May 13, 2025
Applicability:
NRC baseline inspection program
Responsible Offices:
Office of Nuclear Reactor Regulation, Office of Nuclear Security and Incident Response
Scope:
Monitoring of baseline inspection procedures and comprehensive review
Roles:
Director, Regional Directors, Chief of Reactor Inspection Branch, Branch Chiefs, Baseline IP Leads, Points of Contact
Frequency:
Quarterly monitoring, five-year comprehensive review
Year:
2025
Region / city:
Hinkley Point C, Somerset
Subject:
Nuclear safety, Reactor installation
Document type:
Project Assessment Report
Organization:
Office for Nuclear Regulation
Author:
Office for Nuclear Regulation
Target audience:
Nuclear industry professionals, Regulatory authorities
Effective period:
From February 2025
Approval date:
February 2025
Date of amendments:
None
Year:
2021
Region / City:
United States
Theme:
Nuclear reactor inspection
Document type:
Regulatory guidelines
Organization / Institution:
Nuclear Regulatory Commission (NRC)
Author:
NRC staff
Target Audience:
NRC inspectors, licensed nuclear operators
Period of validity:
Ongoing
Approval date:
2021
Date of changes:
2021
Publication date:
February 2024
Year:
2024
Facility:
Heysham 1 Nuclear Power Station
Reactor type:
Advanced Gas-Cooled Reactor
Reactor unit:
Reactor 1
Periodic shutdown identifier:
027
Shutdown period:
October–December 2023
Planned shutdown duration:
69 days
Document type:
Regulatory assessment report
Issuing authority:
Office for Nuclear Regulation
Dutyholder:
EDF Energy Nuclear Generation Limited
Regulatory framework:
Nuclear Site Licence Conditions 28 and 30
Subject areas:
Nuclear safety, examination, inspection, maintenance and testing
Licence instrument referenced:
Licence Instrument 641
Geographic location:
United Kingdom
Year:
2022
Region / City:
United Kingdom
Subject:
Nuclear Safety, Civil Engineering
Document Type:
Nuclear Safety Technical Assessment Guide
Organ / Institution:
Office for Nuclear Regulation
Author:
Inspector and Civil Engineering Assessor
Target Audience:
ONR specialists, nuclear facility operators, safety assessors
Period of Validity:
December 2022 - May 2025
Approval Date:
December 2022
Review Date:
May 2025
Revision Commentary:
Revision 5. Re-structured with appendices. Rev 6: Updated Review Period. Issue 6.1: Minor update to remove extant URLs.
Year:
2023
Region / City:
Poznan, Poland
Theme:
Neutronic analysis, nuclear engineering, AP1000 reactor
Document type:
Research paper
Author:
Mikolaj Brzezinski, Jakub Sierchula
Target audience:
Researchers, nuclear engineers
Period of validity:
2023
Approval date:
2023
Date of changes:
Not specified
Note:
Year
Note:
Year
Topic:
Reactor Oversight Process (ROP)
Document Type:
Manual
Organization:
Nuclear Regulatory Commission (NRC)
Target Audience:
NRC staff, reactor oversight personnel
Note:
Year
Subject:
Nuclear Reactor Oversight
Document Type:
Inspection Manual
Organization / Institution:
NRC
Year:
2017
Region / City:
United Kingdom
Topic:
Small Modular Reactors, Nuclear Financing
Document Type:
Request for Information
Organization:
Department for Business, Energy & Industrial Strategy (BEIS)
Author:
Expert Finance Working Group
Target Audience:
Technology developers, consortia, nuclear project investors
Action Period:
2017–ongoing
Approval Date:
Not specified
Modification Date:
Not specified
Note:
Contextual Description
Year:
2024
Region / City:
Hartlepool
Subject:
Nuclear Energy, Reactor Operations
Document Type:
Report
Organization:
Office for Nuclear Regulation (ONR)
Author:
EDF Energy Nuclear Generation Limited
Target Audience:
Nuclear Safety Professionals, Regulatory Bodies
Period of Validity:
Until 10 May 2025
Approval Date:
December 2024
Date of Changes:
N/A
Note:
Year
Topic:
Police Recruitment
Document Type:
Hiring Process Guide
Agency / Institution:
Norristown Police Department
Target Audience:
Applicants for Police Officer Position
Country:
United Republic of Tanzania
Ministry:
Ministry of Finance
Project:
Financial Access for Sustainable and Transformational (FAST) Growth (P500471)
Type:
Draft Stakeholder Engagement Plan
Date:
April 2024
Target Audience:
Project stakeholders including SMEs, start-ups, and financial institutions
Scope:
Tanzania Mainland and Zanzibar
Components:
Access to finance for SMEs, credit infrastructure, value chain financing, grievance mechanism, monitoring and reporting
Year:
Not specified
Region / City:
Not specified
Topic:
FASt Lane Eligibility, GSA MAS Solicitation
Document Type:
Policy
Organization / Institution:
GSA (General Services Administration)
Author:
Not specified
Target Audience:
Vendors, Contractors
Period of validity:
Not specified
Approval Date:
Not specified
Date of Amendments:
Not specified
Year:
2023
Region / city:
Sweden
Topic:
Fast Frequency Reserve (FFR), Energy, Frequency Regulation
Document type:
Application
Author:
Svenska kraftnät
Target audience:
Energy providers, contractors, and regulatory bodies
Effective period:
Not specified
Approval date:
Not specified
Amendment date:
Not specified
Year:
2012
Region / City:
N/A
Topic:
Data Warehouse Architecture
Document Type:
Technical Article
Organization / Institution:
Microsoft
Authors:
Eric Kraemer, Mike Bassett, Eric Lemoine, Dave Withers
Target Audience:
IT planners, architects, DBAs, business intelligence users
Period of validity:
N/A
Approval Date:
March 2012
Date of Changes:
N/A