№ files_lp_3_process_7_096129
File format: docx
Character count: 6799
File size: 355 KB
Regulatory compliance checklist and certification form outlining inspection, integrity testing, disinfection, flushing, monitoring, and reporting requirements for seasonal public water systems in North Carolina prior to opening for the operating season.
Year:
Not specified
State:
North Carolina
Country:
United States
Regulatory Framework:
Revised Total Coliform Rule [15A NCAC 18C Section .1539 (§141.854(i)(1); §141.860(b)(2)]
Document Type:
Regulatory compliance checklist and certification form
Issuing Authority:
Public Water Supply Section
Applicable To:
Seasonal public water systems not fully pressurized during the off-season
Water System Name:
SOUTHWEST PARK
Water System Number:
NC3041094
Subject:
Start-up, shutdown, disinfection, flushing, monitoring, and certification requirements
Compliance Requirement:
Annual completion and submission prior to serving water to the public
Submission Methods:
Mail, Email, Fax
Referenced Standards:
AWWA Standards C654, C652, C651
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2026
Region / State:
Massachusetts, USA
Topic:
Drinking Water Safety / Public Notification
Document Type:
Regulatory Guidance / Template
Agency:
Massachusetts Department of Environmental Protection (MassDEP)
Target Audience:
Public Water Systems (PWS) Operators and Local Health Authorities
Regulation Reference:
310 CMR 22.16, 22.19, 22.04
Contaminant Focus:
E. coli / Total Coliform
Delivery Methods:
Radio, Television, Hand/Direct Delivery, Posting, Newspaper Publication
Population Served:
Communities served by specific PWS, including neighboring areas if applicable
Required Actions:
Public notice issuance within 24 hours of Tier 1 violation, corrective actions, coordination with local health authorities
Year:
2015
Region / City:
North Carolina
Topic:
Laboratory Certification
Document Type:
Checklist
Organization:
NC DEQ/DWR Wastewater/Groundwater Laboratory Certification Branch
Author:
Not specified
Target Audience:
Laboratory personnel involved in microbiological testing
Period of validity:
Ongoing
Approval Date:
Not specified
Date of changes:
Not specified
Year:
2016
Region / City:
Region 8, Denver, CO
Topic:
Water Quality, Bacteriological Sampling
Document Type:
Instructions
Agency:
EPA
Target Audience:
Water system operators
Effective Period:
Starting April 1, 2016
Approval Date:
April 1, 2016
Last Updated:
Not specified
Context:
Instructional document detailing the requirements for developing a Revised Total Coliform Rule (RTCR) Sample Siting Plan for public water systems, including sample site selection, laboratory certifications, and submission procedures.
Year:
2021
Jurisdiction:
United States, California
Document Type:
Assessment Form
Target Audience:
Public Water System Operators
Regulation:
Revised Total Coliform Rule (rTCR)
System Type:
CWS, NTNC, TNC
Submission Deadline:
30 days after coliform treatment trigger
Includes:
Wells, Storage Tanks, Pressure Tanks, Distribution System, Sample Sites
Certification:
Operator in Responsible Charge
Year:
2022
Region / City:
[Water System Name]
Topic:
Water Quality
Document Type:
Template
Agency / Institution:
[Water System Name]
Author:
[Water System Name]
Target Audience:
Consumers of the water system
Period of Validity:
Ongoing
Approval Date:
[Enter date]
Date of Modifications:
[Enter date if applicable]
Note:
Year
Topic:
Water testing, Coliform, Nitrate, Fluoride, pH, Hardness
Document Type:
Instructional Guide
Organization:
Central District Health Department
Target Audience:
Residents with private water supplies, individuals testing water quality
Authors:
Rahmawati; Laili Fitria; Liza Syafitri
Affiliations:
Biology Major, Faculty of Mathematics and Natural Sciences, University of Tanjungpura, Pontianak; Environmental Engineering Major, Faculty of Engineering, University of Tanjungpura, Pontianak
Correspondence Address:
Jl. Prof. Dr. Hadari Nawawi, Pontianak, Kalimantan Barat 78124
Email:
[email protected]
Year of Study:
2016
Location:
Jawi River, Pontianak, West Kalimantan, Indonesia
Research Period:
September 2016
Sampling Time:
09:40 (low tide) and 15:40 (high tide)
Study Area Sections:
Upstream, midstream, downstream
Type of Document:
Scientific research article
Field of Study:
Environmental science; water quality; microbiology
Research Objective:
To determine the relationship between temperature, pH, DO, and BOD and coliform bacterial density
Methodology:
Field sampling and Pearson Product Moment correlation analysis
Parameters Measured:
Temperature; pH; Dissolved Oxygen (DO); Biological Oxygen Demand (BOD); Coliform density
Coliform Range at High Tide:
150–1,500 MPN/100 ml
Coliform Range at Low Tide:
930–11,000 MPN/100 ml
Keywords:
Correlation; Coliform; Jawi River; Pontianak
Year:
2026
Region / City:
Oregon, USA
Subject:
Public notice requirements for water systems after coliform investigation
Document type:
Guidance / Instruction
Issuing agency:
Oregon Health Authority, Drinking Water Services
Audience:
Operators of community and non-community water systems
Applicable period:
As specified under OAR 333-061-0042(3)
Date issued:
2026
Regulatory references:
OAR 333-061-0040(1), OAR 333-061-0042(3-4)
Distribution methods:
Hand delivery, mail, posting in public locations, additional outreach methods
Health advisory included:
Yes, mandatory language for health effects in italics
Year:
2026
Region / City:
Not specified
Topic:
Drinking Water Safety
Document Type:
Public Health Notice
Organization / Agency:
[Water System Name]
Author:
[Water System Name]
Target Audience:
Water system customers
Date of Issue:
[Date distributed]
Water System ID:
[State Water System ID#]
Violation Type:
Failure to perform required coliform assessments
Health Advisory:
Guidance for immunocompromised, pregnant, elderly, and infant populations
Year:
2024
Region / City:
United Kingdom
Topic:
Holiday pay, employee benefits
Document type:
Guidelines
Organization:
ECA
Author:
ECA
Target Audience:
Employers, JIB operatives
Effective period:
December 2024 - January 2025
Approval date:
Not specified
Amendment date:
Not specified
Contextual description:
Guidelines for employers on holiday shutdown, pay rates, and allowances for JIB operatives during the Christmas period.
Effective Date:
01/01/2021
Year:
2021
Note:
Region / city
Subject:
Occupational Radiation Exposure
Document Type:
Inspection Procedure
Organization:
NRC
Target Audience:
Inspectors, Licensees
Approval Date:
01/01/2021
Year:
2025
Region / city:
Massachusetts
Topic:
Financial hardship, eviction, federal government shutdown
Document type:
Notice and certification
Organization / institution:
Massachusetts government
Author:
Massachusetts State Government
Target audience:
Federal workers, tenants in Massachusetts
Period of validity:
Indefinite
Approval date:
November 25, 2025
Date of changes:
Not specified
Effective Date:
10/16/2023
Note:
Region / city
Year:
N/A
Region / city:
N/A
Topic:
Power system, wind energy, inverter systems
Document type:
Technical specification
Organization:
N/A
Author:
N/A
Target audience:
Engineers, power system designers
Effective period:
N/A
Approval date:
N/A
Date of amendments:
N/A
Publication date:
February 2024
Year:
2024
Facility:
Heysham 1 Nuclear Power Station
Reactor type:
Advanced Gas-Cooled Reactor
Reactor unit:
Reactor 1
Periodic shutdown identifier:
027
Shutdown period:
October–December 2023
Planned shutdown duration:
69 days
Document type:
Regulatory assessment report
Issuing authority:
Office for Nuclear Regulation
Dutyholder:
EDF Energy Nuclear Generation Limited
Regulatory framework:
Nuclear Site Licence Conditions 28 and 30
Subject areas:
Nuclear safety, examination, inspection, maintenance and testing
Licence instrument referenced:
Licence Instrument 641
Geographic location:
United Kingdom
Year:
2022
Region / City:
Argonne, Illinois
Theme:
Power Shutdown, Safety, Operations
Document Type:
Internal Operations Document
Organization / Institution:
Argonne National Laboratory
Author:
Not specified
Target Audience:
APS staff, engineers, and project managers
Period of Action:
January 2023
Approval Date:
Not specified
Date of Changes:
Not specified
Note:
Contextual Description
Year:
2024
Region / City:
Torness Nuclear Power Station
Subject:
Nuclear Reactor Start-Up Consent
Document Type:
Project Assessment Report
Organization / Institution:
Office for Nuclear Regulation (ONR)
Author:
EDF Energy Nuclear Generation Limited
Target Audience:
Regulatory Authorities, Nuclear Industry Professionals
Period of Effect:
2024
Approval Date:
Not specified
Date of Changes:
Not specified
Contextual description:
Project assessment report on the consent process for the start-up of Torness Reactor 1 after its 2024 periodic shutdown, focusing on inspection and compliance with safety standards.
Year:
2023
Region / City:
Argonne National Laboratory
Theme:
Safety, Operational Planning, Equipment Maintenance
Document Type:
Internal Memo
Organization / Institution:
Argonne National Laboratory
Author:
Multiple Staff Members
Target Audience:
APS Staff
Period of Validity:
December 2022 - February 2023
Approval Date:
Not Specified
Date of Changes:
Ongoing
Event Date:
January 31, 2023
Safety Update:
Ongoing
Context:
A detailed internal memo regarding vacation schedules, operational shutdowns, safety updates, and equipment maintenance plans at the Argonne National Laboratory, specifically for the APS staff.
Year:
2021
Date Range:
August 2–8, 2021
Organization:
Advanced Photon Source (APS)
Location:
Argonne National Laboratory
Document Type:
Weekly operations report and shutdown planning update
Operational Status:
Limited Operations+
Onsite Presence Schedule:
August 2–8, 2021 (Mon–Fri)
Shutdown Period:
2021-2 Supplemental Time Shutdown
Power Shutdown Dates:
August 5, 2021; August 10, 2021
Affected Beamline Sectors:
12–23; 24–35; 18–27
Key Topics:
Safety monitoring, beamline maintenance, construction updates, power shutdown coordination, PSS validations, LNDS Module C installation
Supervising Engineer (Focusing Mirror Installation 9BM):
Mike Fisher
Contractors Mentioned:
Meade; Power Construction
Completion Milestones:
437 build-out expected Feb/Mar 2022; 25-ID laser control room by end of 2021
Author:
Lori Montgomery
Publication Date:
October 6
Type of Document:
Newspaper article
Genre:
Political news report
Subject:
U.S. government shutdown and federal debt limit standoff
Key Figures:
John A. Boehner; Barack Obama; Jack Lew; Nancy Vanden Houten; Ted Cruz; Paul Ryan; Dave Camp
Institutions Mentioned:
U.S. House of Representatives; White House; U.S. Treasury Department
Geographic Focus:
United States; Washington, D.C.
Economic Context:
$16.7 trillion federal debt limit; potential default deadlines of October 17 and early November
Themes:
Budget negotiations; partisan conflict; risk of sovereign default; federal payments and interest obligations