№ lp_1_2_25623
This document provides technical requirements for High Impact Large Loads (HILLs) to meet voltage and frequency ride-through standards for interconnection to the SPP Transmission System, ensuring system stability during disturbances.
Year: 2025
Region / City: N/A
Subject: Voltage and frequency ride-through requirements for High Impact Large Loads (HILLs)
Document Type: Technical Specification
Organization: SPP Operations
Author: Daniel Baker, Mostafa Sedighizadeh
Target Audience: Industry stakeholders, Transmission Customers
Effective Period: N/A
Approval Date: 2025-08-04
Revision Date: 2025-08-04
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.