№ lp_2_3_21765
File format: docx
Character count: 16252
File size: 667 KB
Technical specification defining requirements for the supply, installation, commissioning, maintenance, and potential expansion of a conventional fire detection and alarm system in accordance with Australian standards and regulatory codes.
Document Type:
Engineering Specification
System Type:
Conventional Fire Detection and Alarm System
Control Panel:
NOTIFIER CFP-16 Conventional Fire Alarm Control Panel
Detectors:
SYSTEM SENSOR 100 Series Conventional Photoelectric and Heat Detectors
Standards:
AS 1670.1; AS 1670.4; AS 7240.2; AS 7240.4; AS 4428.3; AS 1668.1; AS 2220; AS 2118; AS 3000; AS 1851; AS/NZS ISO 9001:1994
Regulatory Framework:
Building Code of Australia (BCA); Authority Having Jurisdiction (AHJ)
Quality Requirement:
ISO 9001 Certified Manufacturer
Installation Requirement:
Australian Communications Authority (ACA) Registered Technicians and Licensed Electricians
Warranty Period:
1 Year from Date of Acceptance
Post Contract Maintenance Period:
5 Years after Expiration of Warranty
Expansion Provision:
Up to 25% System Expansion within 5 Years
Submittals:
Shop Drawings; Operating and Maintenance Manuals; Certifications; Software Modification Services
Geographical Context:
Australia
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2023
Region:
Suffolk, Great Britain
Site:
Sizewell C
Project:
Sizewell C new build project ONR strategy up to licence grant
Document type:
Assessment report
Assessment area:
Conventional Health and Safety and Life Fire Safety
Organisation:
Office for Nuclear Regulation
Prospective licensee:
NNB Generation Company (SZC) Ltd
Nuclear facility type:
Nuclear power station with two UK EPR™ reactors
Regulatory framework:
Health and Safety at Work etc Act 1974; Construction (Design and Management) Regulations 2015; Regulatory Reform (Fire Safety) Order 2005
Licence condition:
LC19 – Construction or installation of new plant
Issue number:
1
Report reference:
ONR-NR-AR-22-007
Record reference:
2022/24235
Assessment rating:
Green
Project phase:
Pre-construction
Assessment basis:
Intelligent replication from Hinkley Point C
Regulatory decision context:
Nuclear Site Licence grant consideration
Year:
N/A
Region / city:
N/A
Topic:
Power system, wind energy, inverter systems
Document type:
Technical specification
Organization:
N/A
Author:
N/A
Target audience:
Engineers, power system designers
Effective period:
N/A
Approval date:
N/A
Date of amendments:
N/A
Year:
2023
Region / city:
Geneva
Topic:
Emerging technologies, lethal autonomous weapon systems
Document type:
Final report
Organization / institution:
Convention on Prohibitions or Restrictions on the Use of Certain Conventional Weapons
Author:
High Contracting Parties to the Convention
Target audience:
Governments, international organizations
Period of validity:
2023
Approval date:
15 November 2023
Date of amendments:
N/A
Context:
Report on the work and decisions of the High Contracting Parties to the CCW regarding lethal autonomous weapon systems and the continuation of relevant discussions and activities.
Year:
2021
Region / City:
Geneva
Topic:
Lethal Autonomous Weapons Systems, Emerging Technologies
Document Type:
Report
Organization / Institution:
Group of Governmental Experts on Emerging Technologies in the Area of Lethal Autonomous Weapons Systems
Author:
N/A
Target Audience:
High Contracting Parties, Experts on Emerging Technologies
Period of Validity:
2021
Date of Adoption:
22 February 2022
Date of Changes:
N/A
Year:
2023
Journal:
Journal of Cataract & Refractive Surgery
DOI:
10.1097/j.jcrs.0000000000001055
Authors:
Jascha A. Wendelstein; Sarah Hinterberger; Peter C. Hoffmann; Nino Hirnschall; Michael J. Koss; Achim Langenbucher; Paul Jirak; Matthias Bolz
Institutions:
Johannes Kepler University Linz; Kepler University Hospital GmbH; Saarland University; IROC Zürich; Augen- und Laserklinik Castrop-Rauxel; Augenzentrum Nymphenburger Höfe München; EyeLaser Clinic Linz
Region:
Linz, Austria
Study Period:
2014–2020
Submission Date:
November 22, 2021
Acceptance Date:
August 30, 2022
Study Design:
Single-center, single-surgeon retrospective consecutive case series
Sample Size:
91 eyes of 91 patients
Population:
Middle European patients undergoing myopic phakic intraocular lens implantation
Intervention:
Visian Implantable Collamer Lens (ICL) model V4c implantation
Comparative Methods:
OCOS software; JPhakic software; Olsen-Feingold formula; Holladay formula; Linz-Homburg-Castrop formula
Outcome Measures:
Mean and median absolute prediction error; percentage of eyes within 0.25 D, 0.5 D, 0.75 D, and 1.0 D
Ethics Approval:
EK 1074/2021, JKU ethics committee Linz
Publisher:
Wolters Kluwer on behalf of ASCRS and ESCRS
Copyright Year:
2022
Year:
1998
Region / Country:
Japan
Subject:
Rice farming, crop yield, pest impact
Document type:
Research article
Journal:
Agriculture, Ecosystems, and Environment
Authors:
D. A. Andow, K. Hidaka
Methodology:
Simulated leaf-clipping, insect herbivore monitoring
Key findings:
Natural farming rice more tolerant to injury and pests, conventional rice more susceptible to disease
Crop:
Rice
Farming systems compared:
Conventional vs. natural
Note:
Year
Crop Type:
Organic, Conventional, Transitional
Instructions:
Includes guidance on buffer strips and field activity log usage
Note:
Year
Theme:
Construction, Roofing
Document Type:
Instruction Guide
Organization / Institution:
GCP Applied Technologies
Target Audience:
Contractors, Roofers
Contextual description:
Step-by-step installation guide for roofing membrane using the conventional and back-roll methods.
Year:
2023
Region / City:
Ain Shams University, Cairo, Egypt
Topic:
Occlusal accuracy, Digital vs Conventional Methods
Document Type:
Research Article
Institution:
Ain Shams University
Author(s):
M. Attia, M. Wahsh, N Z Fahmy, A Aboelfadl, M Zohdy
Target Audience:
Dental professionals, researchers in Prosthodontics
Period of Validity:
N/A
Approval Date:
N/A
Modification Date:
N/A
Year:
2022
Region / City:
Cavtat-Dubrovnik, Croatia
Topic:
Pressure standards, refractometry
Document type:
Conference paper
Organization / Institution:
IMEKO, RISE Research Institutes of Sweden, Umeå University, Physikalisch-Technische Bundesanstalt (PTB), Istituto Nazionale di Ricerca Metrologica (INRiM), LNE-Cnam
Authors:
C. Forssén, I. Silander, J. Zakrisson, E. Amer, D. Szabo, T. Bock, A. Kussicke, T. Rubin, D. Mari, S. Pasqualin, Z. Silvestri, D. Bentouati, O. Axner, M. Zelan
Target Audience:
Metrology professionals, researchers in measurement science
Period of Action:
October 2022
Approval Date:
N/A
Modification Date:
N/A
Year:
2026
Region / City:
Somerset East
Theme:
Guarding Services, Alarm Systems, Armed Response
Document Type:
Tender
Organization / Institution:
Blue Crane Route Municipality
Author:
Not specified
Target Audience:
Potential service providers
Period of Validity:
3 years
Approval Date:
09 January 2026
Date of Changes:
Not specified
Year:
2013
Region / City:
United States
Subject:
Fire Alarm System Maintenance and Inspection
Document Type:
Contract Requirements
Organization / Institution:
General Services Administration (GSA)
Author:
Not specified
Target Audience:
Contractors and Fire Alarm Technicians
Effective Period:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2023
Region / City:
Huntsville, Texas
Subject:
Fire Alarm System Installation Requirements
Document Type:
Checklist
Organization / Institution:
City of Huntsville
Author:
City of Huntsville Fire Department
Target Audience:
Contractors, Engineers
Period of Validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2014
Region / City:
North Hampton, MA
Topic:
Installation of fire alarm pull stations
Document Type:
Solicitation/Contract/Order
Organization / Institution:
Department of Veterans Affairs
Author:
Freida McClain
Target Audience:
Contractors
Validity Period:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2019
Note:
Region / City
Topic:
Fire Alarm System Testing
Document Type:
Inspection and Testing Report
This document is a record for the annual testing and inspection of fire alarm systems, confirming that the system was tested in accordance with ULC 536:
2019 standards, with identified deficiencies and recommendations.
Procurement Reference Number:
PT/SEC/33/2024
Note:
Preparation of Bids
• Possess current ISO 9001:
2015 certification from a recognised certifying organisation
Year:
2019
Region / City:
Colorado Springs
Topic:
Fire Alarm Systems
Document Type:
Guidelines
Author:
Colorado Springs Fire Department
Target Audience:
Contractors, Installers, Engineers
Effective Period:
Ongoing, subject to amendments
Approval Date:
4/12/2019
Amendment Date:
None
Note:
Year
Note:
Year
Year:
2021
Region / City:
Amityville, New York
Theme:
Fire Detection and Alarm Systems
Document Type:
Technical Specification
Organization:
Napco Security Group
Author:
Napco Security Group
Target Audience:
Fire Alarm System Designers, Engineers, Specifiers
Period of Validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified