№ lp_1_21654
Regulatory assessment report presenting the Office for Nuclear Regulation’s findings on conventional health and safety and life fire safety arrangements for the Sizewell C nuclear new build in support of a nuclear site licence decision.
Year: 2023
Region: Suffolk, Great Britain
Site: Sizewell C
Project: Sizewell C new build project ONR strategy up to licence grant
Document type: Assessment report
Assessment area: Conventional Health and Safety and Life Fire Safety
Organisation: Office for Nuclear Regulation
Prospective licensee: NNB Generation Company (SZC) Ltd
Nuclear facility type: Nuclear power station with two UK EPR™ reactors
Regulatory framework: Health and Safety at Work etc Act 1974; Construction (Design and Management) Regulations 2015; Regulatory Reform (Fire Safety) Order 2005
Licence condition: LC19 – Construction or installation of new plant
Issue number: 1
Report reference: ONR-NR-AR-22-007
Record reference: 2022/24235
Assessment rating: Green
Project phase: Pre-construction
Assessment basis: Intelligent replication from Hinkley Point C
Regulatory decision context: Nuclear Site Licence grant consideration
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.