№ lp_2_1_20170
Council response paper within a local plan examination setting out the methodology, evidence base, and justification for proposed housing and employment site allocations, including assessment stages, constraints analysis, and consideration of environmental, heritage, infrastructure, and Green Belt impacts.
Year: 2024
Month: December 2024
Document type: Examination response paper
Subject: Site allocations
Relevant policies: H1 – Housing Allocations; S6a – Strategic Employment Allocation: Land to the North-East of Junction 27; S6b – Strategic Employment Allocation: Land to the South-East of Junction 27
Authority: Ashfield District Council
Inspectors: Philip Mileham; Graham Wyatt
Supervising body: Planning Inspectorate
Geographical area: Ashfield District
Referenced town: Hucknall
Infrastructure reference: M1 motorway
Evidence base documents: Background Paper 1: Spatial Strategy and Site Selection [BP.01]; SHELAA Methodology 2021 [SEV20]; Examination Library [SEV.20a–SEV.20d]
Examination reference: Inspectors’ Document INS03
Consultation date of MIQs publication: 30 September 2024
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.