№ lp_1_2_27504
File format: docx
Character count: 21448
File size: 57 KB
The document outlines the conditions under Section 169 of the Highways Act 1980 for erecting scaffolding on public highways, including safety measures, licensing requirements, and standards compliance.
Year:
2025
Region / City:
Leeds
Topic:
Highways, Scaffolding
Document Type:
Guide
Organization:
Leeds City Council
Author:
Unknown
Target Audience:
Contractors, Scaffolding Companies
Effective Period:
From the date of approval until the completion of scaffolding works
Approval Date:
April 2025
Date of Amendments:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2020
Journal:
Jurnal Pendidikan IPA Indonesia
Volume:
9
Issue:
4
DOI:
10.15294/jpii.v9i4.22973
Publisher:
Science Education Study Program FMIPA UNNES Semarang
Institutional Affiliation:
Pascasarjana, Pendidikan Dasar, Universitas Negeri Malang
Authors:
D. A. Haidar; L. Yuliati; S. K. Handayanto
Correspondence Email:
[email protected]
Research Design:
Quasi-experimental with non-equivalent control group design
Population:
Fourth-grade students of Surya Buana Islamic Elementary School, Malang
Research Focus:
Inquiry learning with scaffolding; misconception on light material
Instrument:
Three-tier test
Statistical Analysis:
Anacova
Acceptance Date:
January 11th 2020
Copyright:
© 2020 Science Education Study Program FMIPA UNNES Semarang
Jurisdiction:
Queensland, Australia
Legislation reference:
Work Health and Safety Act 2011
Subject:
Scaffolding safety and risk management
Document type:
Safety checklist
Scope:
Prefabricated or modular scaffolding
Industry:
Construction
Issuing authority:
Workplace Health and Safety Queensland
Target audience:
Principal contractors, PCBUs, scaffolders, safety advisors, HSRs
Key risks addressed:
Falls from height; Falling objects; Scaffold collapse; Work near powerlines; Mobile plant and traffic; Hazardous manual tasks
Compliance requirements:
Design registration; High risk work licensing; SWMS preparation; Inspection and handover certification
Record keeping:
Inspection and maintenance records to be kept on site
Assessment components:
Site details; Selection of scaffolding; Inspection and maintenance; Registration; Licensing and training; Work planning and coordination
Publication Date:
May 24, 2011
Last Updated:
January 24, 2014
Topic:
Education / Teaching Methods
Document Type:
Article / Guide
Target Audience:
Teachers / Educators
Content Focus:
Instructional scaffolding techniques
Key Concepts:
Scaffolding, differentiation, student learning strategies
Intended Use Period:
Current teaching practices
Source:
Educational blog / website
Author:
Not specified
Year:
2011–2019
Unit:
Unit 1, Unit 2
Outage:
A1R17, A1R18, A1R19, A1R20, A1R21, A2R15, A2R16, A2R17, A2R18, A2R19, A2R20
Document type:
Technical report
Subject:
Radiation exposure and scaffolding activities during nuclear plant outages
Authoring organization:
Braidwood Nuclear Power Station
Measured dose:
1.584–5.515 p-rem
Average dose:
2.933 p-rem
Specific locations:
Containment and Auxiliary Building (IMB and OMB)
Target audience:
Radiation protection personnel, plant management
Key processes:
Scaffold installation and removal, dose estimation, ALARA practices
Observation methods:
On-site measurements, remote monitoring, dose tracking
Notable events:
Snubber failures affecting scaffold builds, dose revisions
Company:
Empire Scaffolding Limited
Document type:
General Terms of Trade
Industry:
Construction and Scaffolding Services
Subject:
Equipment Hire and Scaffolding Services Conditions
Applicable legislation:
Construction Contracts Act 2002; Personal Property Securities Act 1999
Equipment type:
Scaffolding and related equipment
Services:
Scaffold equipment hire, erection, dismantling, transportation, and related professional services
Minimum hire period:
Seven days
Taxation:
Goods and Services Tax (GST) applicable
Parties:
Supplier and Client
Supplier:
Empire Scaffolding Limited and its related or subcontracted entities
Client definition:
Any person or entity hiring equipment or receiving services from the supplier
Risk allocation:
Client bears risk of loss or damage during hire period
Insurance requirement:
Client must maintain full replacement insurance for hired equipment during transport and hire period
Delivery terms:
Equipment delivered and collected by the supplier with transport charges applied
Cancellation policy:
Cancellation fee applicable for orders cancelled less than seven days before delivery
Pricing basis:
Supplier price lists and quotations valid for 30 days unless otherwise agreed
Billing cycle:
Hire charges calculated daily and invoiced monthly
Year:
Fiscal Year
Region / City:
Pittsburg
Topic:
Economic Development, Grant Program
Document Type:
Grant Guidelines
Organization / Institution:
Pittsburg Highway 271 Business Board
Author:
Pittsburg Highway 271 Business Board
Target Audience:
Property Owners, Tenants
Duration:
Oct. 1 - Sept. 30
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2023
Region / city:
Wisconsin
Subject:
Utility facility construction and maintenance permits
Document type:
Application/Permit
Authority:
Wisconsin Department of Transportation
Author:
Wisconsin Department of Transportation
Target audience:
Utility facility owners
Period of validity:
Not specified
Approval date:
Not specified
Date of amendments:
Not specified
Document type:
Technical approval schedule
Appendix:
Appendix A
Subject area:
Structural design standards
Infrastructure type:
Highway bridges and structures
Standards framework:
Eurocodes and UK National Annexes
Jurisdiction:
United Kingdom
Responsible role:
Designer
Referenced standards bodies:
British Standards Institution, CEN
Applicable disciplines:
Structural engineering
Scope of documents:
Basis of design, actions on structures, concrete structures, steel structures
Revision status:
Revisions current as of 23 July 2024
Validity period:
Various standards valid until 30 March 2028
Superseding standards:
Referenced where applicable
Associated guidance:
CD 350
Year:
2019
Region / City:
Lancashire
Topic:
Highway Claims
Document Type:
Claim Form
Organization / Institution:
Lancashire County Council
Author:
Fazeela Karim
Target Audience:
Claimants for Highway Incident Compensation
Period of Validity:
N/A
Approval Date:
20/02/2019
Date of Last Revision:
N/A
Document type:
Public Involvement Plan
Sector:
Highway transportation
Agency:
Wisconsin Department of Transportation
Abbreviation:
WisDOT
Reference:
FDM 6-5-10.2
Revision date:
February 2021
Approval roles:
WisDOT Project Manager; Regional Communication Manager
Scope:
Highway project development
Key topics:
Public outreach; Stakeholder engagement; Environmental Justice considerations; Project messaging; Construction impacts; Schedule and cost communication
Source type:
Administrative planning document
Note:
Year
Region / City:
Ontario
Subject:
Traffic Violations and Driver Convictions
Document Type:
Policy / Regulation
Organization:
Ministry of Transportation
Target Audience:
Fleet Administrators, Insurers, Drivers
Year:
2021
Type of document:
Request for Expression of Interest
Reference number:
CS/STATS/SCBV/2021/04
Issuing organization:
COMESA Secretariat
Program:
African Information Highway (AIH)
Position title:
Team Leader and Senior Data Scientist
Assignment type:
Individual consultancy
Region:
Africa
Maximum contract budget:
USD 150,000
Submission language:
English
Submission deadline:
18 August 2021
Contract commencement:
Within two weeks of contract signature
Evaluation method:
Technical evaluation and financial compliance
Minimum technical score:
70%
Contact persons:
Ted Peter Luka; Silver Mwesigwa
Date of issue:
28 July 2021
Year:
2016
Region / City:
[insert LA name]
Topic:
Building Information Modelling (BIM)
Document Type:
Employers Information Requirements
Institution:
[insert LA name]
Author:
Not specified
Target Audience:
Contractors, Engineers, Project Managers
Period of Effectiveness:
Not specified
Approval Date:
Not specified
Revision Date:
Not specified
Contextual description:
Employers Information Requirements document outlining the BIM processes and deliverables for highway works projects in [insert LA name].
Note:
Year
Topic:
Advanced Emergency Braking Systems (AEBS)
Document Type:
Regulation Draft
Year:
2022
Region / city:
Medway
Theme:
Highway Asset Management, Infrastructure Planning
Document Type:
Strategy
Organization / institution:
Medway Council
Author:
TechEng Consultancy
Target Audience:
Local Authorities, Government Officials, Infrastructure Managers
Period of Validity:
2022-2027
Approval Date:
07/02/2023
Revision History:
1 - DRAFT, August 2022 (Full document review); 1, March 2023 (Amended dates, updated national data)
Year:
2013–2016
Region / corridor:
I-25 North Denver Metro Area
Project name:
I-25 Managed Lanes – 120th to SH 7 or SH 66
Document type:
Procurement procedure guidance and selection framework
Sector:
Public transportation infrastructure
Responsible organization:
Transportation agency
Primary purpose:
Selection of procurement procedures for highway projects
Procurement methods covered:
Low Bid; Best Value; Qualifications-Based
Project delivery method:
Design–Build
Estimated budget:
USD 126,000,000; USD 54,500,000 for 120th to SH 7 with RAMP funding
Funding source:
RAMP
Estimated project delivery period:
October 2013 – June 2016
Geographic scope:
Colorado
Project components:
Bridge widening; roadway widening; noise walls; asphalt paving
Year:
Not specified
Region / City:
Litchfield, NH
Theme:
Municipal services, Road maintenance
Document Type:
Job Description
Author:
Not specified
Target Audience:
Job applicants
Effective Period:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2025
Region / city:
Muswellbrook
Theme:
Planning and development
Document type:
Planning proposal
Organ / institution:
Muswellbrook Shire Council
Author:
Sharon Pope, Muswellbrook Shire Council; Luke Fanayan, Department of Planning, Housing and Infrastructure
Target audience:
Local government, public agencies
Period of action:
2025
Approval date:
02/06/2025
Date of amendments:
Not specified
Note:
Year
Subject:
Utility installation permit application
Document Type:
Instruction Manual
Organization / Institution:
Wisconsin Department of Transportation (WisDOT)
Author:
Wisconsin Department of Transportation
Target Audience:
Utility facility owners, contractors, municipalities
Year:
2025
Region / City:
United Kingdom
Topic:
Highway Bridge and Structure Design
Document Type:
Technical Approval Schedule
Institution:
N/A
Author:
N/A
Target Audience:
Designers, Engineers
Period of Validity:
Until 30 March 2028
Approval Date:
N/A
Amendment Date:
N/A