№ lp_1_31139
File format: docx
Character count: 59930
File size: 6690 KB
Capstone project report detailing the design, testing, and planned construction of a battery-powered tricycle to transport compost in Malawian communities.
Year:
2021
Region / Country:
Malawi
Project Type:
University Engineering Project
Faculty Advisor:
Dianne McDonnell
Instructor:
David Trevas
Team Members:
Husain Aldawood, Connor Schmerfeld, Hope Williams, Shi Zhang
Semester:
Spring 2021
Budget:
$1404.94
Vehicle Type:
Tricycle for compost transport
Power Source:
Two batteries with DC motor
Capacity:
Up to 500 pounds
Status:
Design completed, implementation planned
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
1997
Region / City:
Australia
Theme:
Environmental Protection, Waste Management
Document Type:
Legal Notice
Organ / Institution:
Environmental Protection Authority (EPA)
Author:
N/A
Target Audience:
Landowners, Occupiers, Waste Transporters
Period of Validity:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Contextual Description:
A legal notice under section 143 of the Protection of the Environment Operations Act 1997, detailing the lawful usage of land as a waste facility and requirements for waste transporters.
Year:
2020
Region / City:
Malawi
Topic:
Design and Engineering of Compost Transporter
Document Type:
Project Proposal
Organization / Institution:
University Course Project
Author:
Husain Aldawood, Connor Schmerfeld, Hope Williams, Shi Zhang
Target Audience:
Faculty, Students, Project Sponsors, Engineering Professionals
Period of Activity:
Fall 2020
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2020
Country:
Malawi
Region:
Southeastern Africa
Project type:
Engineering design proposal
Document type:
Academic project report
Course:
ME 386W
Semester:
Fall 2020
Authors:
Husain Aldawood; Connor Schmerfeld; Hope Williams; Shi Zhang
Project sponsor / faculty advisor:
Dianne McDonnell
Instructor:
David Trevas
Institutional context:
University course requirement
Subject:
Compost transportation and waste management
Technology:
Electrically powered tricycle
Power system:
Battery-powered electric motor
Estimated project cost:
USD 1,222.63
Planned implementation period:
Spring 2021
Intended users:
Local residents and compost workers in Malawi
Design methods referenced:
CAD modeling; morphological matrix; Pugh chart; decision matrix; QFD
Document type:
Supplemental research material
Scientific field:
Cardiology and renal physiology
Research topic:
Effects of glucocorticoids on renal sodium transport in heart failure
Authors:
Shuyu Li; Yaomeng Huang; Tongxin Li; Xiaoran Zhu; Weimin Li; Kunshen Liu; Chao Liu
Affiliated institutions:
North China University of Science and Technology Affiliated Hospital; The First Hospital of Hebei Medical University; Hebei General Hospital
Country of research:
China
Corresponding author:
Chao Liu
Experimental subjects:
Rat models of chronic heart failure
Methods:
Western blot analysis; immunohistochemistry; echocardiography; membrane protein extraction; sodium loading test
Key compounds studied:
Dexamethasone (DEX); RU486
Biological targets:
ENaC subunits; SGK1; NKCC2; Na⁺/K⁺-ATPase; SGLT1; SGLT2; NaPi-2a; NPRA; V2R; AQP2; AQP3; AQP4; NCC; NHE3
Measured parameters:
Fractional excretion of sodium (FeNa%); fractional excretion of potassium (FeK%); protein expression in renal cortex and medulla
Experimental groups:
Control rats; chronic heart failure rats; chronic heart failure rats treated with dexamethasone; intervention with RU486
Year:
2020
Region / City:
Malawi
Topic:
Design and Engineering of Compost Transporter
Document Type:
Project Proposal
Organization / Institution:
University Course Project
Author:
Husain Aldawood, Connor Schmerfeld, Hope Williams, Shi Zhang
Target Audience:
Faculty, Students, Project Sponsors, Engineering Professionals
Period of Activity:
Fall 2020
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2020
Country:
Malawi
Region:
Southeastern Africa
Project type:
Engineering design proposal
Document type:
Academic project report
Course:
ME 386W
Semester:
Fall 2020
Authors:
Husain Aldawood; Connor Schmerfeld; Hope Williams; Shi Zhang
Project sponsor / faculty advisor:
Dianne McDonnell
Instructor:
David Trevas
Institutional context:
University course requirement
Subject:
Compost transportation and waste management
Technology:
Electrically powered tricycle
Power system:
Battery-powered electric motor
Estimated project cost:
USD 1,222.63
Planned implementation period:
Spring 2021
Intended users:
Local residents and compost workers in Malawi
Design methods referenced:
CAD modeling; morphological matrix; Pugh chart; decision matrix; QFD
Year:
2020
Region / City:
Tanah Datar Regency, West Sumatra
Topic:
Agricultural Development, Fertilizer Innovation, Paddy Farming
Document Type:
Research Paper
Institution:
Padang State University
Author:
Ratna Wilis, Widya Prarikesslan, Erna Juita, Irda Suryani, Pudia M Indika
Target Audience:
Farmers, Agricultural Researchers, Agricultural Policy Makers
Period of Action:
2020-2021
Approval Date:
June 01, 2020
Modification Date:
April 10, 2020
Keywords:
Compost Fertilizer, Straw, Paddy Productivity
Year:
2025
Region / City:
Nauni, Solan (H.P.)
Topic:
Microbial Enzyme Activity in Compost
Document Type:
Research Article
Organization / Institution:
Dr. Y.S. Parmar University of Horticulture and Forestry
Author:
Not specified
Target Audience:
Agricultural researchers, mushroom farmers
Period of Activity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2024
Location:
Centre for Organic Agriculture Research and Training (COART), Dr. Panjabrao Deshmukh Krishi Vidyapeeth, Akola, India
Research field:
Agronomy / Organic Agriculture
Document type:
Experimental study report
Authors:
COART research team
Methodology:
Factorial randomized block design, 12 treatment combinations, 3 replications
Materials tested:
Soybean straw, cotton stalk, wheat straw, pigeonpea straw, weed biomass, leaf litter, soil, cowdung slurry, PDKV, S9, and CIRCOT decomposing cultures
Measured parameters:
Compost temperature, microbial counts (bacterial, fungal, actinomycetes), compost yield, compost maturity
Keywords:
Crop residue mixtures, compost, decomposing culture, temperature, microbial analysis
Period of study:
Composting process until maturity (up to 126 DAF)
Year:
2024
Region / City:
Malawi
Subject:
Education, Infrastructure Development, Environmental and Social Management
Document Type:
Report
Organization / Institution:
Government of the Republic of Malawi, Ministry of Education
Author:
Government of Malawi
Target Audience:
Government officials, education sector stakeholders, contractors
Implementation Period:
December 2021 – December 2025
Approval Date:
February 2024
Revision Date:
February 2024
Year:
2024
Region / City:
Blantyre, Malawi
Theme:
Water and Sanitation
Document Type:
Environmental and Social Management Plan
Organization / Institution:
Blantyre Water Board
Author:
Blantyre Water Board
Target Audience:
Government Officials, Public Health Authorities, Local Communities
Period of Effect:
2024-2029
Approval Date:
February 2024
Date of Amendments:
N/A
Year:
2019
Country:
Malawi
Type of document:
Policy framework
Project:
Malawi Resilience and Disaster Risk Management Project (MRDRMP)
Implementing organizations:
Ministry of Finance, Economic Planning and Development; Ministry of Agriculture, Irrigation and Water Development; Department of Disaster Management Affairs; Ministry of Lands, Housing and Urban Development
Supporting organization:
World Bank
Document scope:
Resettlement policies, land acquisition, compensation, rehabilitation, and project-affected persons
Location:
Lilongwe and districts affected by floods and droughts
Language:
English
Target audience:
Government agencies, project implementers, stakeholders involved in resettlement
Year:
2020
Region / City:
Malawi
Topic:
Design and Engineering of Compost Transporter
Document Type:
Project Proposal
Organization / Institution:
University Course Project
Author:
Husain Aldawood, Connor Schmerfeld, Hope Williams, Shi Zhang
Target Audience:
Faculty, Students, Project Sponsors, Engineering Professionals
Period of Activity:
Fall 2020
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2023
Region / City:
Malawi
Theme:
Climate resilience, environmental management
Document type:
Draft Environmental and Social Management Framework
Institution:
Ministry of Finance and Economic Affairs
Author:
N/A
Target audience:
Governments, environmental and social management professionals, stakeholders in climate resilience projects
Period of validity:
N/A
Approval date:
N/A
Date of amendments:
N/A
Year:
2024
Region / City:
Malawi
Topic:
Education Reform, Infrastructure Development
Document Type:
Environmental and Social Management Plan (ESMP)
Agency/Organization:
Ministry of Education, Government of Malawi
Author:
Secretary for Education, Ministry of Education
Target Audience:
Government officials, project implementers, and local communities
Duration:
December 2021 - December 2025
Approval Date:
February 2024
Amendment Date:
N/A
Year:
2020
Region / City:
Malawi
Theme:
Labour management, education reform
Document Type:
Procedural guidelines
Organization / Institution:
Ministry of Education
Author:
Ministry of Education
Target Audience:
Program workers, stakeholders involved in the implementation of the MERP
Period of Effect:
Throughout the implementation of MERP
Approval Date:
November 2020
Date of Changes:
Not specified
Year:
2024
Region / City:
Malawi
Topic:
Digital Development, Stakeholder Engagement, Public-Private Partnerships
Document Type:
Stakeholder Engagement Plan
Organization:
Public Private Partnership Commission
Author:
Not specified
Target Audience:
Stakeholders involved in the Digital Malawi Acceleration Project
Period of Validity:
April 2024 and ongoing
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2024
Region / City:
Malawi
Theme:
Health, Climate Change, Disaster Management
Document Type:
Stakeholder Engagement Plan
Organization / Institution:
Republic of Malawi, Ministry of Health
Author:
Ministry of Health, Republic of Malawi
Target Audience:
Stakeholders involved in climate change, health sector, disaster management, and related fields
Period of Validity:
2024 and beyond
Approval Date:
April 2024
Date of Changes:
N/A
Year:
2019-2021
Region / Country:
Malawi, Nigeria, South Africa, Uganda
Theme:
Women’s economic empowerment, climate smart agriculture
Document type:
Evaluation report
Organization / Institution:
UN Women Eastern and Southern Africa Regional Office (ESARO)
Author:
Okwach Abagi
Intended users:
UN Women ESARO and COs, Standard Bank Group, potential donors, national partners, regional stakeholders, development partners
Budget:
USD 3 million
Focus crops/activities:
Groundnuts, Shea butter, Rice, Maize, Beans, Cage-fish farming
Alignment:
SDG 1, 2, 5, 8, 13; UN Women Development Results Framework (DRF)
Evaluation period:
June 2019 – February 2022
Methodology:
Mixed-methods evaluation, including interviews and focus group discussions
Gender considerations:
Women-focused, including women living with HIV and disability inclusion
Data sources:
Country evaluation reports, stakeholder consultations, project documents
Year:
2022
Region / City:
Malawi
Thematic Area:
Climate change, Sustainable Agriculture Intensification
Document Type:
Research Report
Organ / Institution:
University of Malawi
Author:
Vincent Mgoli Mwale, PhD, Joseph Chimungu, PhD, Rowland Maganizo Kamanga, PhD
Target Audience:
Agricultural researchers, policymakers, local farmers
Period of Action:
November 2022 – December 2024
Date of Approval:
November 2022
Date of Changes:
None specified