№ lp_1_2_21913
File format: docx
Character count: 6121
File size: 51 KB
This document outlines the timeline and scenarios for the allocation process in Allocation Round 7a for all non-offshore wind technologies under the UK CfD scheme.
Year:
2025
Region / City:
United Kingdom
Subject:
Contract for Difference (CfD) Allocation Process
Document Type:
Timeline/Procedure
Organization:
Low Carbon Contracts Company (LCCC)
Target Audience:
CfD Applicants, Delivery Body, Ofgem
Effective Period:
August 2025 – February 2026
Approval Date:
N/A
Amendment Date:
N/A
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2019
Region / City:
New Delhi
Sector:
Energy / Power Transmission
Document Type:
Request for Qualification
Organization:
PFC Consulting Limited
Author:
PFC Consulting Limited
Target Audience:
Potential Bidders for Transmission Service Provider
Period of validity:
Not specified
Approval Date:
October 21, 2019
Amendment Date:
Not specified
Organization:
Asia-Pacific Telecommunity
Meeting:
29th Meeting of the APT Wireless Group (AWG-29)
Meeting dates:
21–29 March 2022
Meeting format:
Virtual/Online
Document type:
Draft recommendation
Source reference:
AWG-29/OUT-25
Technical scope:
Fixed Wireless Service link performance under wind conditions
Frequency range discussed:
Millimetre-wave band
Related document:
APT Report No. APT/AWG/REP-81
Annexes:
Attenuation model under wind condition; compensation techniques; link budget evaluation
Date:
29 March 2022
Organization:
Asia-Pacific Telecommunity
Meeting:
29th Meeting of the APT Wireless Group (AWG-29)
Document number:
AWG-29/INP-58
Meeting date:
21–29 March 2022
Document date:
14 March 2022
Meeting format:
Virtual/Online
Submitting organization:
Huawei Technologies Co., Ltd.
Document type:
Working document / proposal
Subject:
Fixed wireless system link performance under wind conditions
Related document:
APT Report No. APT/AWG/REP-81
Frequency range:
Millimetre-wave (85.5 GHz)
Geographical scope:
Asia-Pacific region
Technical focus:
Antenna vibration, wind-induced attenuation models
Context:
Technical working document of a regional telecommunication standardization body outlining proposed models, measurements, and analytical approaches for assessing wind-induced degradation of fixed wireless system link performance.
Submitted to:
Dr. Jessica Thomas
Created by:
Team K — Eric Dye, Matt Olah, Isabella Gluzman, George Byrne
Course:
Engineering 1181
Institution:
The Ohio State University
Location:
Columbus, OH, USA
Date:
24 October 2019
Type of document:
Laboratory report
Topic:
Wind turbine design and energy output analysis
Experimental focus:
Blade number and pitch optimization, power generation calculations
Target:
Residential neighborhood energy assessment
Efficiency considered:
25%
Year:
2017
Region / City:
Butte, Nevada, Yuba Counties
Theme:
Fire debris removal, disaster recovery
Document Type:
Invitation for Bids (IFB)
Organization / Institution:
Department of Resources Recycling and Recovery (CalRecycle)
Author:
CalRecycle
Target Audience:
Prospective bidders
Period of Action:
November 2, 2017 - December 31, 2017
Approval Date:
November 2, 2017
Amendment Date:
November 8, 2017
Year:
2025
Region / City:
Netherlands
Topic:
Wind Farm Zone Coordinates
Document Type:
Technical Memo
Organization / Institution:
Netherlands Enterprise Agency (RVO)
Author:
Floor van der Wateren (Periplus Group)
Target Audience:
Stakeholders and professionals involved in offshore wind projects
Validity Period:
May 2025
Approval Date:
May 2025
Year:
2015
Region / city:
Europe
Topic:
Acoustics
Document type:
Publication
Author:
Postma, J.; Artois, K.; Philipsen, I. (DNW)
Target audience:
Researchers, engineers
Event:
AIAA SciTech Forum
Link to paper:
https://arc.aiaa.org/doi/10.2514/6.2015-1561
Description:
The document reports on a wind tunnel test for a breakthrough laminar aircraft demonstrator conducted at the DNW-LLF, with a focus on acoustic measurements and analysis.
Year:
2023
Region / City:
Araucanía Region, Chile
Topic:
Renewable energy, Wind power
Document Type:
Press release
Organization / Institution:
Enel Chile, Enel Green Power Chile
Author:
Enel Green Power Chile
Target Audience:
General public, stakeholders in renewable energy
Period of Operation:
Ongoing
Approval Date:
August XX, 2023
Date of Changes:
N/A
Year:
2025
Region / city:
Offshore
Subject:
Offshore wind technologies, allocation round
Document type:
Timeline
Organization:
LCCC, DESNZ, Ofgem, NESO
Target audience:
CfD applicants, industry stakeholders
Period of validity:
2025
Approval date:
June 2025
Date of amendments:
N/A
Contextual description:
This document outlines the timeline scenarios for the seventh allocation round of offshore wind technologies, specifying dates for key actions and deadlines for applicants.
Year:
2025
Region / City:
Scotland
Subject:
Wind energy, planning conditions
Document type:
Legal document
Organ / Institution:
Scottish Government
Author:
Not specified
Target audience:
Developers, planning authorities, Scottish Ministers
Period of validity:
Not specified
Approval date:
Not specified
Amendment date:
Not specified
Year:
N/A
Region / city:
N/A
Topic:
Power system, wind energy, inverter systems
Document type:
Technical specification
Organization:
N/A
Author:
N/A
Target audience:
Engineers, power system designers
Effective period:
N/A
Approval date:
N/A
Date of amendments:
N/A
Year:
2023
Region / city:
Shanghai, Liverpool
Theme:
Offshore wind, dynamic analysis, shared mooring systems
Document type:
Research paper
Author:
Lu Xie, Chun Li, Minnan Yue, Hongsheng He, Wenzhe Jia, Qingsong Liu, Zifei Xu, Li Fan, Musa Bashir, Yangtian Yan
Target audience:
Researchers, engineers, and industry professionals in offshore wind energy
Period of validity:
N/A
Approval date:
N/A
Date of changes:
N/A
Note:
Year
Year:
2019
Region / City:
New Delhi, India
Topic:
Transmission Services, Renewable Energy, Competitive Bidding
Document Type:
Request for Qualification (RfQ)
Organization:
PFC Consulting Limited (wholly owned subsidiary of Power Finance Corporation Ltd.)
Author:
PFC Consulting Limited
Target Audience:
Bidders, Energy Sector Stakeholders
Validity Period:
Until Transmission License is granted
Approval Date:
18/12/2019
Amendment Date:
N/A
Description:
A Request for Qualification document issued by PFC Consulting Limited to shortlist bidders for a transmission service project related to renewable energy evacuation in Tamil Nadu.
Year:
2019
Region / City:
New Delhi, India
Subject:
Transmission Service Provider selection
Document Type:
Request for Qualification (RfQ)
Organization:
PFC Consulting Limited
Author:
PFC Consulting Limited
Target Audience:
Bidders interested in the transmission system project
Period of Effectiveness:
From the date of issuance until the project completion
Approval Date:
October 21, 2019
Amendment Date:
Not specified
Note:
Year
Year:
2023
Region / City:
EPA and GNJ
Topic:
Affiliation of Conferences
Document Type:
FAQ
Organization:
EPA and GNJ Conferences
Author:
Not specified
Target Audience:
Clergy, Church Leaders, Conference Members
Effective Period:
Pilot effort starting in 2023, review after 18 months
Approval Date:
Not specified
Date of Amendments:
Not specified
Year:
2014
Region / City:
United States
Topic:
Technology / Search Engines
Document Type:
Press Release
Organization / Institution:
Microsoft
Author:
Microsoft
Target Audience:
General Public
Period of Validity:
Not Applicable
Approval Date:
Not Applicable
Date of Changes:
Not Applicable
Contextual Description:
A historical timeline documenting major updates and announcements related to Bing’s features and services in 2013-2014.
Note:
Year
Topic:
Graduate Medical Education
Document Type:
Timeline
Target Audience:
Residency Program Coordinators
Period of Validity:
Academic Year
Year:
2021
Region / City:
Wright County, Minnesota
Topic:
ERP/HCM Cloud Implementation, Project Timeline and Scope Changes
Document Type:
Change Control Request
Organization:
Wright County, Ciber
Author:
Ciber
Target Audience:
Stakeholders involved in the Oracle ERP/HCM Cloud Implementation
Effective Period:
2021-2022
Approval Date:
09/17/2019
Modification Date:
01/11/2021