№ lp_1_2_30392
File format: docx
Character count: 72547
File size: 158 KB
This document outlines the conditions for onshore wind energy developments in Scotland, focusing on environmental, safety, and planning requirements.
Year:
2025
Region / City:
Scotland
Subject:
Wind energy, planning conditions
Document type:
Legal document
Organ / Institution:
Scottish Government
Author:
Not specified
Target audience:
Developers, planning authorities, Scottish Ministers
Period of validity:
Not specified
Approval date:
Not specified
Amendment date:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2025
Region / City:
United Kingdom
Subject:
Electricity Regulation, Charging Methodology
Document Type:
Consultation Response Form
Organization:
NESO
Author:
Not specified
Target Audience:
Industry parties, Transmission System Operators, Energy Sector Stakeholders
Validity Period:
From 1st April 2026
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2020
Region / City:
Cornwall
Theme:
Geothermal energy, drilling services, tender invitation
Document type:
Invitation to Tender (ITT)
Issuer:
Eden Geothermal Limited
Target Audience:
Companies offering independent audit services for drilling rigs
Period of Validity:
Until 22nd December 2020
Date of Approval:
27th November 2020
Date of Last Modification:
27th November 2020
Project:
Eden Geothermal Project
Tender reference:
EGL-ITT-C055
Revision:
Ver 1.0
Release Date:
27th November 2020
Issuer:
Eden Geothermal Limited (“EGL”)
Supplier Response Date:
Friday 18th December at 16.00
Contents:
PART A: INSTRUCTIONS TO TENDERERS, PART B: BACKGROUND INFORMATION, PART C: EGL’s REQUIREMENTS / SCOPE OF WORK, PART D: RETURN OF TENDER, PART E: EVALUATION PROCESS, PART F: CONDITIONS, PART G: SCHEDULES (TENDER SUBMISSION TEMPLATES)
Appendices:
Appendix A: Summary Specifications of the MND Bentec 450mt Eurorig, Appendix B: Background Technical Information
Date of Issue:
27th November 2020
Tender Deadline:
Friday 18th December at 16:00
Query Deadline:
Wednesday 9th December at 12:00 noon
Confidentiality:
Yes
Jurisdiction:
UK
Language:
English
Type of Document:
Tender Invitation
Sector:
Geothermal energy
Year:
2026
Region / City:
United States
Topic:
Wind Energy Development
Document Type:
Project Planning Worksheet
Agency / Institution:
Washington State Department of Ecology
Author:
Unknown
Target Audience:
Project Developers, Environmental Agencies
Effective Period:
Ongoing
Approval Date:
N/A
Date of Changes:
N/A
Year:
2026
Region / City:
Surat, Gujarat, India
Subject:
Expression of Interest for operation and maintenance services for offshore platforms and onshore processing terminal
Document Type:
Invitation for Expression of Interest (EoI)
Organization / Institution:
Cairn Oil and Gas, a vertical of Vedanta Limited
Author:
Cairn Oil and Gas
Target Audience:
Contractors with experience in offshore and onshore oil & gas operations
Period of Validity:
14 days after publication
Approval Date:
February 2026
Modification Date:
Not specified
Year:
2013
Region / City:
Myanmar
Topic:
Legal and fiscal terms of production sharing contracts
Document Type:
Presentation
Organization:
Charltons
Author:
Charltons
Target Audience:
Legal and fiscal professionals in the energy sector
Period of Action:
N/A
Approval Date:
N/A
Modification Date:
N/A
Context:
A comparative analysis of legal and fiscal terms of production sharing contracts across various countries and the Myanmar model PSC for petroleum exploration and production.
Year:
2025
Region / City:
California
Subject:
Energy Management, Program Guidelines, Custom Measures
Document Type:
Memorandum
Organization / Institution:
Energy Division, CPUC
Author:
Lisa Paulo, Leanne Hoadley, Jeorge Tagnipes
Target Audience:
SEM and Custom Program Administrators
Effective Period:
March 24, 2025 - ongoing
Approval Date:
March 24, 2025
Modification Date:
N/A
Year:
2023
Region / city:
Geneva
Topic:
Emerging technologies, lethal autonomous weapon systems
Document type:
Final report
Organization / institution:
Convention on Prohibitions or Restrictions on the Use of Certain Conventional Weapons
Author:
High Contracting Parties to the Convention
Target audience:
Governments, international organizations
Period of validity:
2023
Approval date:
15 November 2023
Date of amendments:
N/A
Context:
Report on the work and decisions of the High Contracting Parties to the CCW regarding lethal autonomous weapon systems and the continuation of relevant discussions and activities.
Year:
2019-20
Region / City:
New Delhi
Topic:
Career Advancement Scheme (CAS) for Teaching Faculties
Document Type:
Guidelines / Regulation
Organization / Institution:
Rashtriya Sanskrit Sansthan
Author:
Internal Quality Assurance Cell (IQAC)
Target Audience:
Teaching Faculties, Administrative Staff
Period of Validity:
2019-20
Approval Date:
18/07/2018
Date of Amendments:
2018
Note:
Description
Year:
2021
Region / City:
Geneva
Topic:
Lethal Autonomous Weapons Systems, Emerging Technologies
Document Type:
Report
Organization / Institution:
Group of Governmental Experts on Emerging Technologies in the Area of Lethal Autonomous Weapons Systems
Author:
N/A
Target Audience:
High Contracting Parties, Experts on Emerging Technologies
Period of Validity:
2021
Date of Adoption:
22 February 2022
Date of Changes:
N/A
Year:
2025
Region / city:
Australia
Topic:
Workplace health and safety, building work
Document type:
Guide
Agency / organization:
ReturnToWorkSA
Author:
ReturnToWorkSA
Target audience:
Employers, workers in the building industry
Effective period:
2014-2025
Approval date:
May 30, 2025
Date of last revision:
May 30, 2025
Related legislation:
Return to Work Act 2014
Related regulations:
Return to Work Regulations 2015
Building work definitions:
Construction, alteration, demolition, excavation, swimming pool construction, fencing, insulation
Independent contractors:
Requirements for registration with RTWSA
Employer obligations:
Ensuring worker registration and premium payment
Work status:
Deemed workers in building work
Contract of service:
Conditions for worker status
Flowchart:
Building work guidelines
Tool replacement value:
Indexed amounts for 2020-2025
Document type:
Application form
Organisation:
Association for Project Safety (APS)
Related scheme:
SSIP (Safety Schemes in Procurement)
Subject:
Corporate Membership under SSIP Deemed to Satisfy arrangements
Geographical scope:
United Kingdom
Applicable regulation:
General Data Protection Regulation 2018
Membership category:
Corporate Member
Relevant roles:
Principal Designer; Designer
Fee structure:
Annual subscription based on number of technical staff
Payment methods:
Internet Banking; Card payment
Data protection reference:
APS Privacy Policy
Declaration requirement:
Confirmation of accuracy and compliance with APS Rules and Code of Conduct
Certificate issuance condition:
Subject to successful DTS verification and payment
Target applicants:
Organisations applying for APS Corporate Membership under DTS arrangements
Year:
2011
Region / City:
Northern Ireland
Topic:
Energy, Gas Supply
Document Type:
Scheme
Organization:
Flogas Natural Gas Limited
Author:
Flogas Natural Gas Ltd
Target Audience:
Customers of Flogas Natural Gas Ltd
Effective Period:
Ongoing
Approval Date:
N/A
Amendment Date:
N/A
Year:
2011
Jurisdiction:
Nebraska, United States
Document Type:
Regulatory rule
Issuing Authority:
Nebraska Department of Insurance
Legal Basis:
Neb. Rev. Stat. §§ 44-101.01, 44-4801 et seq.
Scope:
All domestic and foreign insurers
Purpose:
Establish standards for identifying insurers in hazardous financial condition
Effective Date:
January 1, 2011
Review Procedure:
Administrative and judicial review under the Administrative Procedure Act
Applicability:
Insurance companies operating in Nebraska
Content Focus:
Financial solvency standards, director authority, risk mitigation measures
Year:
2023
Region / State:
Multiple U.S. states
Topic:
Energy pricing regulation
Document type:
Dataset / List
Authority / Institution:
U.S. Energy Regulatory Agency
Data coverage:
Counties across the United States
Data format:
FIPS code, State, County name
Target audience:
Researchers, policymakers, energy analysts
Geographic detail:
County-level
Update frequency:
Annual
Source:
Official government records
Year:
2019
Region / City:
New Delhi
Sector:
Energy / Power Transmission
Document Type:
Request for Qualification
Organization:
PFC Consulting Limited
Author:
PFC Consulting Limited
Target Audience:
Potential Bidders for Transmission Service Provider
Period of validity:
Not specified
Approval Date:
October 21, 2019
Amendment Date:
Not specified
Organization:
Asia-Pacific Telecommunity
Meeting:
29th Meeting of the APT Wireless Group (AWG-29)
Meeting dates:
21–29 March 2022
Meeting format:
Virtual/Online
Document type:
Draft recommendation
Source reference:
AWG-29/OUT-25
Technical scope:
Fixed Wireless Service link performance under wind conditions
Frequency range discussed:
Millimetre-wave band
Related document:
APT Report No. APT/AWG/REP-81
Annexes:
Attenuation model under wind condition; compensation techniques; link budget evaluation
Date:
29 March 2022
Organization:
Asia-Pacific Telecommunity
Meeting:
29th Meeting of the APT Wireless Group (AWG-29)
Document number:
AWG-29/INP-58
Meeting date:
21–29 March 2022
Document date:
14 March 2022
Meeting format:
Virtual/Online
Submitting organization:
Huawei Technologies Co., Ltd.
Document type:
Working document / proposal
Subject:
Fixed wireless system link performance under wind conditions
Related document:
APT Report No. APT/AWG/REP-81
Frequency range:
Millimetre-wave (85.5 GHz)
Geographical scope:
Asia-Pacific region
Technical focus:
Antenna vibration, wind-induced attenuation models
Context:
Technical working document of a regional telecommunication standardization body outlining proposed models, measurements, and analytical approaches for assessing wind-induced degradation of fixed wireless system link performance.
Submitted to:
Dr. Jessica Thomas
Created by:
Team K — Eric Dye, Matt Olah, Isabella Gluzman, George Byrne
Course:
Engineering 1181
Institution:
The Ohio State University
Location:
Columbus, OH, USA
Date:
24 October 2019
Type of document:
Laboratory report
Topic:
Wind turbine design and energy output analysis
Experimental focus:
Blade number and pitch optimization, power generation calculations
Target:
Residential neighborhood energy assessment
Efficiency considered:
25%
Year:
2017
Region / City:
Butte, Nevada, Yuba Counties
Theme:
Fire debris removal, disaster recovery
Document Type:
Invitation for Bids (IFB)
Organization / Institution:
Department of Resources Recycling and Recovery (CalRecycle)
Author:
CalRecycle
Target Audience:
Prospective bidders
Period of Action:
November 2, 2017 - December 31, 2017
Approval Date:
November 2, 2017
Amendment Date:
November 8, 2017