№ lp_1_2_37133
File format: docx
Character count: 46071
File size: 1614 KB
The document discusses the dynamic analysis and improvement of shared mooring systems for floating offshore wind farms, focusing on the comparison of different mooring models for floating wind turbine platforms.
Year:
2023
Region / city:
Shanghai, Liverpool
Theme:
Offshore wind, dynamic analysis, shared mooring systems
Document type:
Research paper
Author:
Lu Xie, Chun Li, Minnan Yue, Hongsheng He, Wenzhe Jia, Qingsong Liu, Zifei Xu, Li Fan, Musa Bashir, Yangtian Yan
Target audience:
Researchers, engineers, and industry professionals in offshore wind energy
Period of validity:
N/A
Approval date:
N/A
Date of changes:
N/A
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2018
Region / City:
Global
Topic:
Marine Warranty Surveyor Operations, Offshore Projects
Document Type:
Code of Practice (COP)
Organization / Institution:
Joint Rig Committee
Author:
Joint Rig Committee
Target Audience:
Marine Warranty Surveyors, Underwriters, Offshore Project Managers
Period of Validity:
Ongoing
Approval Date:
10 April 2018
Amendment Date:
03 September 2019
Year:
2025
Region / city:
Offshore
Subject:
Offshore wind technologies, allocation round
Document type:
Timeline
Organization:
LCCC, DESNZ, Ofgem, NESO
Target audience:
CfD applicants, industry stakeholders
Period of validity:
2025
Approval date:
June 2025
Date of amendments:
N/A
Contextual description:
This document outlines the timeline scenarios for the seventh allocation round of offshore wind technologies, specifying dates for key actions and deadlines for applicants.
Note:
Issuer
Issue:
(the “Notes”)
Principal Amount:
$
Pricing Date:
, 2022
Settlement Date:
, 2022 (T+)
Issue Price:
$ per $1,000 principal amount
Rank:
The Notes will be unsecured and unsubordinated obligations of the Issuer and will rank pari passu with all existing and future unsecured and unsubordinated obligations of the Company.
Interest Rate:
For each Interest Period, the rate per annum equal to Daily Compounded CORRA determined for the Observation Period in respect of such Interest Period [plus %], payable quarterly in arrears. Upon the occurrence of certain specified events, certain fallback rates may replace the Daily Compounded CORRA administered by the Bank of Canada (or any successor administrator). These fallback rates will be triggered in a specified order and upon the occurrence of specified events as outlined in the attached [Offering Document]. See “Applicable Fallback Rates” in the attached [Offering Document].
Daily Compounded CORRA:
For an Observation Period will be calculated as follows, with the resulting percentage rounded if necessary to the fifth decimal place, with 0.000005 being rounded upwards:
Interest Period:
Each quarterly period from, and including, an Interest Payment Date (or, in the case of the first Interest Period, the Settlement Date) to, but excluding, the next following Interest Payment Date (or in the case of the final Interest Period, the Maturity Date).
Observation Period:
In respect of each Interest Period, the period from, and including, the date two Business Days preceding the first date in such Interest Period to, but excluding, the date two Business Days preceding the Interest Payment Date.
Interest Payment Dates:
March , June , September and December of each year commencing on , 2022, provided that in each case if such date is not a Business Day (where “Business Day” means [any day, other than Saturday, Sunday and any statutory holiday in Toronto, Ontario] [NTD: Adjust “business day” definition to match applicable documentation]), then the relevant Interest Payment Date shall be the next following Business Day unless such day falls on the next calendar month, in which case the relevant Interest Payment Date shall be the immediately preceding Business Day.
Interest Determination Date:
In respect of each Interest Period, the date that is two Business Days preceding an Interest Payment Date.
Day Count Convention:
Actual/365
Redemption:
The Notes are not redeemable prior to maturity.
Use of Proceeds:
The net proceeds will be used to .
Form:
Book entry only through participants in CDS.
Minimum Denomination:
$ or in integral multiples of $ in excess thereof.
CUSIP/ISIN:
/
Governing Law:
Laws of
Year:
June 2020
Region / City:
U.S.
Topic:
Floating Rates, Treasury Foreign Exchange Rates
Document Type:
Specification
Organization:
U.S. International Development Finance Corporation
Author:
Not specified
Target Audience:
Technical staff involved in file integration
Effective Period:
June 2020
Approval Date:
June 2020
Date of Changes:
None
Year:
2024
Note:
Region / City
Topic:
Floating Rate Notes, Benchmark Rate, BBSW Rate, AONIA Rate
Document Type:
Financial Terms
Context:
Template for fallback language used to determine the interest rate for floating rate notes in the event of disruption or discontinuation of key benchmark rates such as BBSW or AONIA.
Designation Year:
1972
Location:
Boston Mountains and Ozark Mountains, Arkansas
River Length:
150 miles
River Classification:
Class I & II
Managing Authority:
National Park Service
Floating Season (Upper Section Ponca to Pruitt):
March through June
Primary Activities:
Canoeing, rafting, kayaking, hiking, trail riding, camping
Boat Launch Hours (Day Trips):
8:30 a.m. to Noon
Popular Day Trip Route:
Ponca to Kyle’s Landing (10 miles)
Popular Multi-Day Route:
Ponca to Pruitt (24 miles)
Regulations:
Glass containers prohibited; rental boat limits; secured ice chest lids required; floatable holders for open beverages
Camping Fees:
$10 per night per site
Camping Policy:
First-come, first-serve; dispersed camping permitted with distance restrictions from designated campgrounds
Year:
2008
Region / City:
University Park, PA
Topic:
Numerical Methods, Signal Processing
Document Type:
Research Paper
Institution:
The Pennsylvania State University
Author:
H.J. Sommer III, Ph.D.
Target Audience:
Researchers, Engineers, Academics
Period of Validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2023
Region / City:
Global
Topic:
Software Installation
Document Type:
User Manual
Organization / Institution:
Safe Software
Author:
Unknown
Target Audience:
IT Administrators, Network Engineers
Effective Period:
Ongoing
Approval Date:
May 2023
Modification Date:
May 2023
Context:
Detailed instructions for installing a floating licence server for FME on Windows systems, including setup, configuration, and troubleshooting steps.
Year:
Not specified
Region / City:
Sandwell
Country:
United Kingdom
Organisation:
Sandwell Council
Service Name:
Floating Support Service
Document Type:
Public information notice
Subject:
Housing-related and wellbeing support
Target Audience:
Vulnerable residents at risk of homelessness, hospitalisation or harm
Support Areas:
Health, finance, safety, housing, substance misuse, learning disability, physical and mental health
Cost:
No direct cost to residents
Contact Email:
[email protected]
Access Method:
Referral form via Council website
Collaborating Agencies:
Housing services, private landlords, social care, health services
Year:
2021
Region / City:
United Kingdom
Subject:
Corporate Finance, Secured Lending
Document Type:
Essay
Organization / Institution:
Law School
Author:
Not specified
Target Audience:
Law students, financial professionals
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2023
Region / city:
Sweden
Topic:
Financial securities
Document type:
Terms and Conditions
Issuer:
[Issuer Name]
Target audience:
Bondholders, investors
Effective period:
From [First Issue Date]
Approval date:
[Approval Date]
Amendment date:
[Amendment Date]
Issuer contact:
www.[Issuer].se
Agent contact:
www.[Agent].se
Issuing Agent contact:
www.[IssuingAgent].se
Data protection:
Bondholder privacy and data processing guidelines
Document purpose:
Legal agreement for bond issuance and holder rights
Date:
23 June 2016
Subject:
New Financial Instrument Listing (FORTRESS INCOME FUND LIMITED – FIFB09)
Exchange:
JSE Limited
Market:
Interest Rate Market
Issuer:
Fortress Income Fund Limited
Instrument Type:
Floating Rate Note
Bond Code:
FIFB09
ISIN:
ZAG000137654
Nominal Issued:
R 200,000,000.00
Issue Price:
100%
Coupon:
9.165% (3 Month JIBAR as at 22 June 2016 of 7.325% plus 184 bps)
Coupon Rate Indicator:
Floating
Trade Type:
Price
Issue Date:
27 June 2016
Interest Commencement Date:
27 June 2016
First Interest Payment Date:
27 September 2016
Interest Payment Dates:
27 March, 27 June, 27 September, 27 December
Books Close Dates:
17 March, 16 June, 17 September, 17 December
Last Day to Register:
By 17:00 on 16 March, 15 June, 16 September, 16 December
Final Maturity Date:
27 June 2019
Date Convention:
Following
Security Status:
Senior Unsecured Floating Rate Notes
Settlement System:
Central Securities Depository (CSD) electronic settlement
Related Document:
Applicable Pricing Supplement
Contact – Issuer Representative:
Courtney Galloway, RMB, +27 11 2824155
Contact – Exchange:
Corporate Actions, JSE, +27 11 5207000
Year:
2022
Region / City:
Johannesburg, South Africa
Subject:
Financial Instrument Listing
Document Type:
Market Notice
Organization:
JSE Limited
Issuer:
KAP Industrial Holdings Limited
Instrument Type:
Floating Rate Note
Nominal Value:
ZAR 420,000,000
Issue Price:
100%
Coupon:
3 Month JIBAR + 150bps
Final Maturity Date:
12 April 2025
Books Close Dates:
2 January, 2 April, 2 July, 2 October
Interest Payment Dates:
12 January, 12 April, 12 July, 12 October
ISIN:
ZAG000185182
Additional Information:
Senior Unsecured
Issue Date:
12 April 2022
Interest Commencement Date:
12 April 2022
First Interest Payment Date:
12 July 2022
Pricing Supplement URL:
https://clientportal.jse.co.za/Content/JSEPricingSupplementsItems/KAP024%20PricingSupplement1204.pdf
Year:
2026
Region / City:
Global
Topic:
Floating Wind Energy, Concrete Floater Designs
Document Type:
Clarification Response
Organization / Institution:
Floating Wind Joint Industry Programme (FLWJIP)
Author:
FLWJIP Team
Target Audience:
Contractors, Project Bidders, Industry Professionals
Period of Validity:
February 2026
Approval Date:
February 2026
Modification Date:
Not specified
Date:
16 February 2017
Instrument Type:
Floating Rate Note
Issuer:
FORTRESS INCOME FUND LIMITED
Bond Code:
FIFB11
Tap Amount:
R 138,000,000.00
Total Amount Following Tap Issue:
R 438,000,000.00
Nominal Issued:
R 138,000,000.00
Issue Price:
100.19921%
Coupon:
9.10% (3 Month JIBAR 7.35% + 175 bps)
Coupon Rate Indicator:
Floating
Trade Type:
Price
Final Maturity Date:
7 February 2020
Books Close Dates:
28 January, 27 April, 28 July, 28 October 2017
Interest Payment Dates:
7 February, 7 May, 7 August, 7 November
Last Day to Register:
17h00 27 January, 26 April, 27 July, 27 October 2017
Issue Date:
17 February 2017
Interest Commencement Date:
9 February 2017
First Interest Payment Date:
7 May 2017
ISIN:
ZAG000139262
Additional Information:
Senior Unsecured Floating Rate Notes, immobilised in the Central Depository (CSD), settlement electronically per JSE Rules
Contact:
Courtney Galloway, RMB, +27 11 282 4155; Corporate Actions, JSE, +27 11 520 7000
Year:
2019
Region / City:
Bass Strait, Victoria
Topic:
Carbon Capture and Storage, Environmental Management
Document Type:
Environmental Plan, Project Update
Organization / Institution:
CarbonNet, AGR (Australia) Pty Ltd, NOPSEMA
Author:
CarbonNet Project Team
Target Audience:
Stakeholders, Local Community, Environmental Regulators
Period of Validity:
November 2019 - Ongoing
Approval Date:
April 2019
Modification Date:
Not specified
Year:
2026
Region / city:
Commonwealth
Topic:
Offshore Electricity Infrastructure Licensing
Document type:
Guideline
Organization / institution:
Australian Government
Author:
Australian Government
Target audience:
Licence applicants, stakeholders
Period of validity:
Ongoing
Approval date:
January 2026
Date of revisions:
January 2026
Year:
2023
Organization:
Offshore Racing Congress
Document Type:
Notice of Race
Scope:
Offshore and Sportboat Sailing Competitions
Rules Applied:
Racing Rules of Sailing, IMS Rules, ORC Rating Systems Rules, ORC Class Rules, OSR Category 3 and B
Eligibility:
ORC International, ORC DH International, and ORC Sportboat Class Certificates
Event Duration:
From measurement until the final day and closing ceremony
Communication Methods:
Official Notice Board, e-mails, WhatsApp, VHF radio
Classes:
A, B, C with specified CDL ranges and entry limits
Division:
A, B, C by Displacement/Length Ratio and spinnaker type
Safety Requirements:
Life raft compliant with OSR Category 2, jackstays on deck, marine VHF transceiver, adequate propulsion or support boat
Year:
2025
Region / city:
Offshore
Subject:
Offshore wind technologies, allocation round
Document type:
Timeline
Organization:
LCCC, DESNZ, Ofgem, NESO
Target audience:
CfD applicants, industry stakeholders
Period of validity:
2025
Approval date:
June 2025
Date of amendments:
N/A
Contextual description:
This document outlines the timeline scenarios for the seventh allocation round of offshore wind technologies, specifying dates for key actions and deadlines for applicants.