№ files_lp_4_process_2_62410
File format: docx
Character count: 4960
File size: 32 KB
Instructional leaflet providing guidance on ear wax management, including self-care with drops, bulb syringing, and referral options for professional ear irrigation or micro suction.
Year:
2017
Region:
United Kingdom
Topic:
Health / Ear Care
Document Type:
Informational Leaflet
Organization:
NHS and affiliated private clinics
Author:
Not specified
Target Audience:
General public
Last Updated:
October 2017
Medical Disclaimer:
Information is for personal interpretation and may become outdated; consult a healthcare provider for medical advice
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Document ID:
UTHH Pedi ENT Q&A: Ear Tubes (2023-09-16)
Type:
Patient Information Series
Topic:
Ear Tubes
Intended Audience:
Parents of children undergoing ear tube surgery
Region/City:
Houston
Year:
2023
Date of Approval:
2023-09-16
Procedure:
Surgical procedure for ear tube placement
Complications:
Otorrhea, blocked tubes, perforation, scarring, need for additional tubes
Recovery Time:
1-2 hours post-surgery, full recovery in a day
Follow-up:
Every 6-8 months for tube check
Surgical Duration:
Less than 5 minutes per ear
Anesthesia:
Gas anesthesia
Fluid Management:
Clear liquids after surgery, regular food on the next day
Ear Tubes Duration:
6-36 months
Ear Tube Removal:
Possible after 3+ years
Note:
Complications
Scarring, drainage, tube blockages, infections
Additional Information:
For more details, contact UTHealth Houston Pedi ENT at (713) 486-5000 or MyUTHealthHouston
Explanation:
Information document for parents detailing ear tube surgery for children, covering the procedure, potential complications, recovery, and follow-up care.
Year:
2024-2025
Region / City:
Washington State
Topic:
Medical authorization form
Document Type:
Medical Authorization
Organization:
Washington State School for the Blind
Author:
Licensed Health Professional
Target Audience:
Parents/Guardians, School Staff
Effective Period:
07/01/2024 - 08/31/2025
Approval Date:
Not specified
Modification Date:
Not specified
Topic:
Ear health screening and reporting
Population:
First Nations children
Indicator:
PI26 National Key Performance Indicator (nKPI)
Framework:
National guide to preventative healthcare for Aboriginal and Torres Strait Islander people
System:
MMEx Clinical Information System
Type of document:
Health reporting guidance article
Subject:
Recording and counting rules for ear health checks
Reporting period:
12 months
Data sources:
Ear Health and Hearing module; Procedures; Conditions/Diagnoses; Observations; Custom Form “Health Check for Ear Health”
Related documents:
Specifications for nKPI and OSR (Appendix E, Section 6); CIS User Guides
Geographic scope:
Australia
Year:
2021
Country:
Aotearoa New Zealand
Subject:
Ear and hearing health equity for Māori and Pacific children
Document type:
Research report
Methodology:
Online survey and virtual hui
Organisations involved:
Eisdell Moore Centre for Hearing and Balance Research
Project focus:
Ear and Hearing Healthcare (EHHC) services
Population:
Māori and Pacific tamariki
Contributors:
Dr Rebecca Garland; Dr Meagan Barclay; Kylie Bolland; Dr Elizabeth Holt; Dr Rachelle Love; Alehandrea Manuel; Dr Alice Stringer
Funding and support:
Eisdell Moore Centre for Hearing and Balance Research
Key themes:
Institutional racism; policy structures; workforce issues; access barriers; systems change
Related programmes referenced:
UNHSEIP; B4 School Check
Year:
2020
Region / City:
Eastern Cape
Topic:
Life Sciences
Document Type:
Worksheet
Author:
Directorate Senior Curriculum Management (SEN-FET)
Target Audience:
Grade 12 Students
Period of Action:
Term 2
Date of Approval:
June 2, 2020
Date of Changes:
N/A
Context:
Educational worksheet for Grade 12 students on life sciences, focusing on the topic of ear function, hearing, and balance.
Document Type:
Exhibitor Agreement Form
Subject:
Commercial Exhibit Participation in CME Activity
Organizing Institution:
New York Eye and Ear Infirmary of Mount Sinai
Accredited Provider:
New York Eye and Ear Infirmary of Mount Sinai
Department:
Institute for Continuing Medical Education
Director:
Kimberly A. Corbin, CHCP
CME Coordinator:
Barbara Aubel
Activity Format:
Live
Regulatory Framework:
Updated ACCME Standards for Commercial Support; Department of Health and Human Services Office of Inspector General; Pharmaceutical Research and Manufacturers of America (PhRMA) Code; American Medical Association Code of Medical Ethics
Location:
120 East 16th Street – 12th Floor, New York, NY 10003
Submission Method:
Fax or Email
Submission Deadline:
One month prior to course date
Signatories:
Exhibitor Contact Person; Accredited Provider Representative
Restrictions:
No promotional activity within educational space; No distribution of medication samples; No subletting of exhibit space
Note:
Year
Topic:
Ear care, Health procedures
Document type:
Informational guide
Target audience:
Individuals seeking information on ear irrigation
Year:
2019
Region / City:
Pontprennau
Subject:
Ear care, earwax treatment
Document Type:
Medical Guide
Organization / Institution:
Pontprennau Medical Centre
Author:
Not specified
Target Audience:
Patients of Pontprennau Medical Centre
Effective Date:
5th August 2019
Date of Last Update:
5th August 2019
Description:
This document provides information on ear wax, its natural function, and the recommended methods for managing and preventing earwax build-up, including advice on using ear drops and alternative treatments like bulb syringing.
Note:
Year
Document Type:
Worksheet
Target Audience:
Students
Year:
2026
Region / City:
Goa (IN)
Topic:
Terminal testing, ear simulators
Document type:
Change Request
Organization:
3GPP
Author:
HEAD acoustics GmbH
Target Audience:
3GPP Working Group members, acoustic test specialists
Validity period:
N/A
Approval date:
N/A
Modification date:
N/A
Year:
2024
Region / City:
Liverpool
Topic:
Ear care, Pediatric care
Document Type:
Informational leaflet
Organization / Institution:
Alder Hey Children’s NHS Foundation Trust
Author:
Not specified
Target Audience:
Parents, Carers
Effective Period:
Not specified
Approval Date:
Not specified
Review Date:
August 2024
Year:
2016
Region / City:
California
Topic:
Library resource management, committee meeting updates, electronic resource acquisitions
Document type:
Report
Organization / Institution:
EAR Committee
Author:
Not specified
Target Audience:
Committee members, library staff, stakeholders in resource management
Action Period:
2016/17
Approval Date:
Not specified
Modification Date:
Not specified
Meeting Schedule:
August 26, October 14, January 26, April 7
Platform:
Confluence
Vendor Demos:
SCELC vendor day
Resource Sharing:
ULMS and EAR committees
Evaluation Process:
Electronic resources acquisition
Note:
Year
Subject:
Ear health, ear wax, treatment options
Document Type:
Patient Information Leaflet
Organization:
Portcullis Surgery
Target Audience:
General public, patients with ear wax issues
Year:
2022
Region / City:
Horn of Africa (Kenya, Somalia, Ethiopia, Sudan, Djibouti)
Topic:
Groundwater management, Climate change resilience
Document Type:
Stakeholder Engagement Plan
Agency / Institution:
Government of Kenya, Ministry of Water & Sanitation and Irrigation
Author:
Not specified
Target Audience:
Stakeholders involved in water and groundwater management
Period of Validity:
Ongoing
Approval Date:
January 2022
Date of Changes:
Not specified
Year:
2026
Country:
Afghanistan
Province:
Samangan
Project name:
Strengthening Local Resilience and Integration through Improved Watershed and Irrigation System
Funding organization:
PATRIP Foundation
Implementing partner:
The Liaison Office (TLO)
Partner organization:
Swiss Peace
Document type:
Request for Quotation
Procurement method:
Restricted Tender Procedure
RFQ number:
PAT-TLO-RFQ-02-2026
Date of invitation:
6 January 2026
Submission deadline:
14 January 2026
Language of bids:
English
Goods procured:
Fruit saplings (almond and pistachio)
Quantities:
9,690 almond saplings; 6,000 pistachio saplings
Delivery location:
Asia Abad Watersheds, Samangan Province
Delivery timeframe:
Within 15 working days from contract signature
Currency:
USD
Warranty requirement:
365 days
Validity of offers:
90 days
Payment terms:
100% within 30 working days after delivery and acceptance
Copyright holder:
PATRIP Foundation and Georg Fiebig Consultants Pty Ltd
Year:
2024
Region / City:
Florida
Theme:
Landscape irrigation, water conservation
Document Type:
Ordinance
Organ / Institution:
University of Florida, Florida Department of Environmental Protection
Author:
Committee on Landscape Irrigation and Florida-Friendly Design Standards
Target Audience:
Local governments, municipalities
Period of validity:
Indefinite
Approval Date:
Not specified
Date of amendments:
Not specified
Year:
2005
Region / city:
Not specified
Topic:
Irrigation Water Management
Document Type:
Plan
Organization / institution:
Not specified
Author:
Not specified
Target audience:
Farmers, Irrigation system operators
Period of validity:
Not specified
Approval date:
Not specified
Date of amendments:
Not specified
Year:
2025
Region / City:
Uganda, Isingiro District, Kanungu District
Theme:
Irrigation, Climate Resilience, Agricultural Development
Document Type:
Aide Memoire
Organization:
World Bank
Author:
World Bank Team
Target Audience:
Ministry of Water and Environment, Ministry of Agriculture, Animal Industry and Fisheries, Ministry of Finance, Planning and Economic Development, project stakeholders
Period of Action:
2025-2028
Approval Date:
June 18, 2020
Effectiveness Date:
December 17, 2020
Closing Date:
April 30, 2026
Amendment Date:
September 2024
Project Cost:
US$ 182.6 million
Status of Results Framework:
Annex 6 included
Date of Last Review:
March 2025
Year:
2024
Region / City:
Lathrop, California
Topic:
Wildfire Mitigation, Risk Assessment, Emergency Response
Document Type:
Wildfire Mitigation Plan
Organization / Institution:
Lathrop Irrigation District (LID)
Author:
Lathrop Irrigation District
Target Audience:
Utility management, emergency response agencies, residents in the service area
Period of validity:
Ongoing, updated annually
Approval Date:
January 1, 2020
Date of amendments:
Ongoing
Note:
Context description
Note:
Year
Region / City:
Idaho Falls, Idaho
Theme:
Irrigation water rights
Document Type:
Legal Notice
Authority / Institution:
Idaho Irrigation District
Target Audience:
Property owners in the Idaho Irrigation District