№ lp_1_2_60916
File format: docx
Character count: 30370
File size: 263 KB
The document is a checklist for ensuring the successful transition of applications to operational support within the IIT environment, detailing necessary deliverables and governance processes.
Year:
2020
Region / City:
N/A
Subject:
Transition to operations, system development lifecycle
Document Type:
Checklist
Organization / Institution:
Ministry (specific name not provided)
Author:
IIT Transition - Chris Cocker, Bogdan Bezna
Target Audience:
Project teams, operational subject matter experts
Period of validity:
N/A
Approval Date:
N/A
Date of Changes:
May 14, 2020
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Note:
Year
Theme:
Construction and Engineering Documentation
Document Type:
Submission Guidelines
Organization / Institution:
Department of Veterans Affairs (VA)
Target Audience:
Architects, Engineers, VA Medical Center Personnel
Year:
2020
Region / City:
Sophia Antipolis, France
Topic:
5G Network Resource Management
Document Type:
Technical Specification
Organization:
3GPP Organizational Partners
Author:
3GPP
Target Audience:
Technical professionals in the 5G network domain
Period of validity:
Not specified
Approval Date:
Not applicable
Amendment Date:
Not applicable
Year:
2025
Region / City:
Sophia Antipolis, France
Subject:
Telecommunications, Network Resource Management
Document Type:
Technical Specification
Organization / Institution:
3GPP Organizational Partners
Author:
3GPP
Target Audience:
Telecommunications professionals, Network operators
Effective Period:
2025
Approval Date:
2025-03-06
Date of Changes:
N/A
Keywords:
Generic, NRM, IRP, Converged Management
Context:
A technical specification developed by 3GPP for the Generic Network Resource Model (NRM) and its integration into telecommunications management systems.
Year:
2020-2025
Region / City:
Sophia Antipolis, France
Topic:
Telecommunication Management
Document Type:
Technical Specification
Organization / Institution:
3GPP
Author:
3GPP Organizational Partners
Target Audience:
Telecommunications professionals, engineers, and organizations working with 3GPP standards
Period of Validity:
Ongoing for future development
Approval Date:
Not approved yet
Modification Date:
Not specified
Copyright:
© 2020-2025, 3GPP Organizational Partners
Keywords:
NRM, IRP, Converged Management, Generic RAN, 3GPP
Year:
2025
Region / City:
UK
Topic:
Modern Slavery, Human Trafficking
Document Type:
Guide
Author:
UK Government
Target Audience:
First Responders, Professionals in the field of human trafficking and modern slavery
Period of Validity:
May 2025 - May 2027
Approval Date:
May 2025
Date of Last Review:
May 2025
Next Review Date:
May 2027
Year:
2020
Region / city:
Sophia Antipolis, France
Topic:
5G Network Resource Model (NRM), Technical Specification
Document Type:
Technical Specification
Organization:
3rd Generation Partnership Project (3GPP)
Author:
3GPP Organizational Partners
Target audience:
Telecommunications professionals, system developers
Effective period:
Release 16
Approval date:
Not specified
Date of changes:
Not specified
Specification number:
3GPP TS 28.623
Version:
16.19.0
Release:
16
Publication date:
2025-03-06
Standardization body:
3rd Generation Partnership Project (3GPP)
Technical Specification Group:
Services and System Aspects
Series:
28.62x Generic Network Resources IRP
Subject:
Telecommunication management
Scope:
Solution Set definitions for Generic NRM IRP
Related specification:
3GPP TS 28.622
Annexes:
CORBA, XML, OpenAPI, YANG definitions
Intellectual property notice:
© 2025 3GPP Organizational Partners
Status:
Technical Specification under change control
Year:
2014
Region / city:
United States
Topic:
Insects affecting trees
Document type:
User Guide
Agency / institution:
United States Department of Agriculture, US Forest Service
Author:
Not specified
Target audience:
Not specified
Effective period:
Not specified
Approval date:
Not specified
Modification date:
Not specified
Year:
2020
Meeting:
3GPP TSG-SA5 #131-e
Date:
25 May 2020 – 3 June 2020
Work item code:
SON_5G, EE_5G
Source organizations:
Huawei, Orange, Intel
Target group:
S5
Category:
B (addition of feature)
Release:
Rel-16
Clauses affected:
C.4.3, D.4.3, E.5.16, E.5.19, E.5.20, E.5.x1–E.5.x7
Proposed change affects:
UICC apps, ME, Radio Access Network, Core Network
Reason for change:
Addition of new IOCs and attribute definitions to manage distributed and centralized SON functions
Summary of change:
Add stage 3 solution sets for the SON NRM
Consequences if not approved:
Management of SON functions would not be possible
Related CRs:
S5-203316 (stage2), S5-203371 (stage3)
Revision history:
First change C.4.3 XML schema "nRNrm.xsd"
Year:
2019
Region / City:
Ibanda District
Document Type:
News Report
Organization:
Ibanda District
Author:
Sylas Byaruhanga
Target Audience:
Local community, residents of Ibanda
Period of Validity:
N/A
Approval Date:
22nd March 2019
Date of Changes:
N/A
Year:
2025
Region / City:
Goa, India
Subject:
5G Advanced NRM
Document Type:
Work Item Description
Organization:
3GPP
Author:
Nokia, Nokia Shanghai Bell
Target Audience:
3GPP TSG-SA5
Effective Period:
2025-2026
Approval Date:
February 2025
Modification Date:
N/A
Please Contact Vegetation Assessments Plant ID BlackOak Environmental Matt Launer Environmental Consultant PO Box 80 Streaky Bay SA 5680Phone:
0484 914 [email protected]
EP, SAAL, N&Yand AW Vegetation clearance assessments (Bushland Rangeland and Scattered Tree assessments). SEB assessments and management plans. Baseline and long-term flora monitoring surveys:
L1 2 Ann-Nelson Drive, Thebarton SA 5031Phone: 8339 8515Mobile: 0431 681 [email protected]
AMLR, SAAL Project management Vegetation assessments Specialist plant ID Ecological and agricultural research Restoration research Debill Environmental Dr Kathryn HillPlant Ecophysiologist Mo:
0423 693 [email protected]
KI, AMLR, SAMDB, EP Vegetation assessments, bio-surveys and conservation/management plans Mallee Ecology Biosecurity/Pest Management Entomology specialist Donato Environmental Services David :
PO Box 175 Athelstone SA 5075Phone: 0417 819 [email protected]
All of SA Vegetation assessments:
Vegetation clearance assessments (Bushland Rangeland and Scattered Tree assessments) Clearance associated with infrastructure, quarrying, mining projects and developments SEB assessments and Preparation of clearance applications SEB Credit assessments Roadside vegetation assessments Weed assessments Plant ID GIS mappingMonitoring: Flora and Fauna assessment, surveys and monitoring Baseline and long-term flora monitoring surveys Revegetation and restoration monitoring Hayley MerigotEcologistAngela CarpenterSenior Ecologist [email protected]
@ebsecology.com.auAddress:
125 Hayward Avenue, Torrensville SA, 5031 Phone: (08) 7127 5607Website: www.ebservices.com.au
Roadside vegetation monitoring Bushcare weed monitoringManagement plans:
Vegetation management plans SEB management plans Weed management plans Revegetation and restoration management plans Bushfire risk assessment and management planning Eco Logical Australia Tobias ScheidSA Ecology Lead / Senior EcologistJames Garden Senior BotanistAlice Si Ecologist Level 2, 70 Pirie StreetAdelaide, SA 5000PH: (08) 8235 4116M: 0455 780 [email protected]
All of SA Vegetation Assessments - Monitoring - Management Plans - State and Federal Offset MGMT (Mining, Transport, Infrastructure, Urban development, Renewables, Natural Resource Management:
8272 0463 or 0403 775 [email protected]
All Agricultural areas Vegetation Assessment Plant ID Ecosphere Ecological Solutions Pty Ltd. Andrew Sinel DirectorPrincipal Ecologist Postal:
PO Box 2005 McLaren Flat, SA 5171Phone: 0400 555 [email protected]
All Bushland, Rangeland and Scattered Tree clearance assessment mapping and reporting Offset area and SEB credit vegetation assessment, mapping and reporting Clearance assessments associated :
PO Box 62 Bridgewater SA 5155Phone: 0408 813 628 or 8391 [email protected]
All of SA Ecological restoration – revegetation or bushcare Vegetation assessments Preparation of management plans Rural property management Clearance associated with infrastructure projects :
61 3 [email protected]
Bushland Assessment Method The Scattered Tree Assessment Method The Rangeland Assessment Method GPS Consulting Greg Smith Mob:
0418 971 [email protected]
All of SA Bushland, Rangeland and Scattered Tree clearance assessment mapping and reporting Rangelands Assessment method Clearance assessments associated with infrastructure projects and deve:
0448 600 [email protected]
Website:
www.gfenvironmental.com.au
All of SA Rangelands vegetation assessment and management planning Revegetation and offset design and planning Ecological assessment Bushfire risk assessment and management planning Groundwor:
P.O Box 854, Nuriootpa, SA, 5355Phone: 0434 070 [email protected]
All of SA Preparation of SEB offsets and vegetation management plans Vegetation clearance applications associated with infrastructure, quarrying and mining projects Ecological restoration/rev:
0427 549 [email protected]
AMLR, SE, NY, SA MDB, EP, KI Ecological restoration/revegetation Vegetation assessments Preparation of management plans Rural property management issues JS Ayre & Associates Jackie Ayre Addre:
PO Box 123 Edwardstown SA 5039Phone: 0416 151 [email protected]
Year:
2023
Region / City:
Ethiopia
Thematic Area:
Natural Resources Management, Community Development
Document Type:
Job Description
Organization:
Ripple Effect Ethiopia
Author:
Ripple Effect Ethiopia
Target Audience:
REE and PIPs staff, project beneficiaries (smallholder farmers)
Period of Action:
Ongoing
Approval Date:
Not specified
Date of Amendments:
Not specified
Note:
Year
Note:
Year
Year:
2025-26
Region / City:
United States
Subject:
Financial Aid, Intellectual Disabilities
Document Type:
Instructions
Institution:
U.S. Department of Education
Author:
U.S. Department of Education
Target Audience:
Educational institutions participating in Title IV programs
Period of Validity:
2025-26
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2025
Institution:
Chellaston Academy
Subject:
Physics
Level:
A Level
Authors:
Mrs Jepson, Miss Winter, Mr Whetton, Mr Wheat
Target Audience:
Year 12 students preparing for A Level Physics
Type:
Educational guide / preparatory workbook
Course Specification:
OCR A Level Physics A
Submission Requirement:
Completed tasks must be handed in during the first Physics lesson
Optional Materials:
Books, films, and online resources recommended for enrichment
Jurisdiction:
Virginia
Subject:
Early childhood special education transition
Legal framework:
Individuals with Disabilities Education Act (IDEA)
IDEA Part:
Part C and Part B
Agencies involved:
Virginia Department of Behavioral Health and Developmental Services; Virginia Department of Education
Document type:
Guidance document
Format:
Question and answer
Target population:
Children with disabilities from birth to age five and their families
Key topics:
Transition planning; referral; eligibility; evaluation; IEP development; interagency coordination
Referenced agreements:
Virginia Interagency Memorandum of Agreement on IDEA Part C
Referenced indicators:
IDEA Part B Indicator 12
Project title:
Stabilization to Recovery Transition (START) in Libya
Project number:
00119794
Implementing partner:
UNDP
Start date:
March 2020
End date:
February 2021
Geographic scope:
West, East and South Libya
Thematic areas:
stabilization, early recovery, resilience, peacebuilding, humanitarian-development-peace nexus
Target groups:
local governments, women, youth, migrants, internally displaced persons, host communities
Related programmes:
Strengthening Local Capacities for Resilience and Recovery (SLCRR); Stabilization Facility for Libya (SFL)
Contributing framework:
UNDAF
Total budget:
USD 2,727,272
Donor:
Government of Japan
Gender marker:
2
Type of document:
programme and project summary
Year:
2024
Region / City:
European Union
Theme:
Climate Change Mitigation, Sustainability Reporting
Document Type:
Discussion Paper
Organ / Institution:
EFRAG
Author:
EFRAG Secretariat
Target Audience:
EFRAG SRB members, stakeholders in sustainability and climate change reporting
Period of Validity:
2024
Approval Date:
2024
Date of Changes:
2024
Context:
Discussion paper summarizing feedback on the draft guidance for Transition Plans for climate change mitigation, detailing structural, content, and editorial suggestions.