№ lp_2_1_16666
File format: docx
Character count: 11586
File size: 62 KB
A request for information aimed at technology developers and consortia to provide insights into financing small modular reactor (SMR) projects in the UK, focusing on the business plan, investment mechanisms, and project lifecycle phases.
Year:
2017
Region / City:
United Kingdom
Topic:
Small Modular Reactors, Nuclear Financing
Document Type:
Request for Information
Organization:
Department for Business, Energy & Industrial Strategy (BEIS)
Author:
Expert Finance Working Group
Target Audience:
Technology developers, consortia, nuclear project investors
Action Period:
2017–ongoing
Approval Date:
Not specified
Modification Date:
Not specified
Note:
Contextual Description
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2023
Region / City:
Great Britain
Theme:
Nuclear Decommissioning, Environmental Impact Assessment
Document Type:
Guidance
Organization / Institution:
Office for Nuclear Regulation (ONR)
Author:
Nuclear Liabilities Regulation (NLR) Specialist Inspector
Target Audience:
Nuclear site licensees, statutory consultation bodies, other organizations, and the public interested in the environmental impact of nuclear reactor decommissioning
Period of Validity:
2023–2026
Approval Date:
Mar-2023
Date of Changes:
1st January 2021 (related to the Ionising Radiation (Environmental and Public Protection) (Miscellaneous Amendments) (EU Exit) Regulations 2019)
Next Major Review Date:
Oct-2026
Effective Date:
01/01/2021
Year:
2021
Note:
Region / city
Subject:
Occupational Radiation Exposure
Document Type:
Inspection Procedure
Organization:
NRC
Target Audience:
Inspectors, Licensees
Approval Date:
01/01/2021
Note:
Year
Author:
B.J. Steynberg, J.F. du Bruyn
Year:
2021
Region / City:
International
Subject:
Nuclear Security, Research Reactors, Regulatory Assessment
Document Type:
Research Paper
Organization / Institution:
International Atomic Energy Agency (IAEA), Nuclear Regulatory Authority Ghana, Sandia National Laboratories
Authors:
A. S. A. Ligam, R. M. Cushnie, E. Reed, P. K. Gyekye, J. Tsourounakis, M. K. Snell, D. S. Shull, A. Sfetsos
Target Audience:
Nuclear security professionals, researchers in nuclear security
Effective Period:
2018–2019
Approval Date:
July 2018
Modification Date:
June 2019
Year:
2016–2021
Region / City:
Russia, Belarus, India, China, Iran, Germany
Topic:
Nuclear energy, reactor technology
Document Type:
Technical overview
Organization:
Rosatom
Author:
OKB Gidropress, Kurchatov Institute, Atommash
Reactor Type:
VVER-1200, Generation 3+
International Projects:
34 units in 11 countries
Safety Features:
Active and passive systems, ECCS, core catcher, containment filters
Historical Context:
Development from 1954, first VVER-210 online 1964
Operational Data:
Over 80 VVER units built, 1,500 reactor-years of safe operation
Technical Characteristics:
Water-cooled, water-moderated, two-circuit steam system, 60-year service life, 18 months without refueling, load following
Nuclear fuel:
Pressurized ordinary water coolant, boric acid ECCS solution
Engineering Supervision:
Kurchatov Institute
Manufacturing:
Atommash, Podolsk
Overview of Design:
Combines proven engineering solutions with enhanced safety measures and meets IAEA standards
Description:
Technical report on the VVER-1200 reactor family detailing design, safety systems, operational history, and international deployment of Russian Generation 3+ nuclear reactors.
THE FLUID-STRUCTURE INTERACTION OF NARROW GAPS BETWEEN THIN-WALL COAXIAL STRUCTURES IN FAST REACTORS
Year:
2023
Region / city:
Beijing, China
Topic:
Fluid-structure interaction, seismic analysis, fast reactor design
Document type:
Research paper
Organization:
North China Electric Power University, Beijing Key Laboratory of Passive Safety Technology for Nuclear Energy
Author:
Y. Liu, C. Zhang, H. Qiu, D. Lu, D. Li, D. Duan, Y. Huang
Target audience:
Researchers and engineers in nuclear energy and reactor design
Period of action:
Not specified
Approval date:
Not specified
Modification date:
Not specified
Year:
2024
Location:
Kinshasa, Democratic Republic of Congo
Topic:
Operational Radiation Protection and Radioactive Waste Management
Document Type:
Workshop Agenda
Organization:
International Atomic Energy Agency (IAEA)
Participants:
Experts and national coordinators from African research reactors
Target Audience:
Researchers, safety officers, regulatory personnel
Duration:
9–13 September 2024
Venue:
Hotel Elais – La Citronnelle
Sessions:
Presentations, case studies, discussions, hospitality events, museum tour
Speakers:
Prof. Steve Muanza, Prof. Sebastien Luyindula, Joseph Christensen, HE Gilbert Kabanda Kurhenga, A. Sehili, S. Maage, M. Sadaoui, K. Gyamfi, A. Khalefa, A. Jalil, J. Yusuf, R. Maholiela, F. Kabuya, P. Wmata
Year:
2015
Course:
CHE412
Type of document:
Assignment
Institution:
University-level chemical engineering course
Topics:
Chemical kinetics, batch reactor, flow reactor, enzyme kinetics, radioactive decay
Deadline:
8 October 2015
Audience:
Chemical engineering students
Reactions studied:
Second-order decomposition, first-order reversible, enzyme-catalyzed hydrolysis, gas-phase reactions
Units:
Concentration in mol/L, time in minutes, reactor volume in liters
Year:
2023
Region / City:
United States
Topic:
Emergency preparedness for Small Modular Reactors and Other New Technologies
Document Type:
Proposed Rule
Organization / Institution:
U.S. Nuclear Regulatory Commission (NRC)
Author:
U.S. Nuclear Regulatory Commission
Target Audience:
SMR and ONT license applicants, NRC staff
Period of Validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2025
Region / City:
Heysham
Topic:
Nuclear energy, reactor maintenance, shutdown deferral
Document type:
Project assessment report
Organization / Institution:
Office for Nuclear Regulation
Author:
Not specified
Target audience:
Not specified
Period of validity:
Up to 06 October 2025
Approval date:
May 2025
Date of changes:
None
Year:
2020
Organization:
Generation-IV International Forum (GIF)
Authors:
A. Alemberti, K. Tuček, M. Tarantino, M. Takahashi, T. Obara, M. Kondo, A. Moiseev, L. Tocheny, Y. Kuzina, I.S. Hwang, C. Smith, A. Moisseytsev, Y. Wu, M. Jin
Type of document:
Technical safety assessment report
Topic:
Nuclear reactor safety, Generation IV lead-cooled fast reactors
Target audience:
Researchers, engineers, regulatory authorities
Date of publication:
June 2020
Related documents:
Safety Design Criteria for Generation IV Lead-cooled Fast Reactor System (March 2021)
Region:
International
Language:
English
Year:
2025
Region / city:
Pelindaba, Brits Magisterial District, Madibeng Municipality, North West
Theme:
Nuclear energy, procurement
Document type:
Invitation to bid
Organization / institution:
South African Nuclear Energy Corporation SOC Ltd (Necsa)
Author:
Not specified
Target audience:
Suppliers, contractors
Period of validity:
90 days (commencing from the closing date)
Approval date:
Not specified
Date of amendments:
Not specified
Effective Date:
January 1, 2026
Chapter:
0308
Document Type:
Manual
Region / City:
United States
Thematic Focus:
Nuclear Reactor Security
Institution:
U.S. Nuclear Regulatory Commission (NRC)
Target Audience:
NRC licensees, nuclear reactor operators, security personnel
Date Approved:
January 1, 2026
Effective Date:
10/16/2023
Note:
Region / city
Year:
2025
Organization:
U.S. Nuclear Regulatory Commission (NRC)
Document Type:
Inspection Manual Appendix
Topic:
Reactor Oversight Process, Baseline Inspection Program
Effective Date:
May 13, 2025
Applicability:
NRC baseline inspection program
Responsible Offices:
Office of Nuclear Reactor Regulation, Office of Nuclear Security and Incident Response
Scope:
Monitoring of baseline inspection procedures and comprehensive review
Roles:
Director, Regional Directors, Chief of Reactor Inspection Branch, Branch Chiefs, Baseline IP Leads, Points of Contact
Frequency:
Quarterly monitoring, five-year comprehensive review
Year:
2025
Region / city:
Hinkley Point C, Somerset
Subject:
Nuclear safety, Reactor installation
Document type:
Project Assessment Report
Organization:
Office for Nuclear Regulation
Author:
Office for Nuclear Regulation
Target audience:
Nuclear industry professionals, Regulatory authorities
Effective period:
From February 2025
Approval date:
February 2025
Date of amendments:
None
Year:
2021
Region / City:
United States
Theme:
Nuclear reactor inspection
Document type:
Regulatory guidelines
Organization / Institution:
Nuclear Regulatory Commission (NRC)
Author:
NRC staff
Target Audience:
NRC inspectors, licensed nuclear operators
Period of validity:
Ongoing
Approval date:
2021
Date of changes:
2021
Publication date:
February 2024
Year:
2024
Facility:
Heysham 1 Nuclear Power Station
Reactor type:
Advanced Gas-Cooled Reactor
Reactor unit:
Reactor 1
Periodic shutdown identifier:
027
Shutdown period:
October–December 2023
Planned shutdown duration:
69 days
Document type:
Regulatory assessment report
Issuing authority:
Office for Nuclear Regulation
Dutyholder:
EDF Energy Nuclear Generation Limited
Regulatory framework:
Nuclear Site Licence Conditions 28 and 30
Subject areas:
Nuclear safety, examination, inspection, maintenance and testing
Licence instrument referenced:
Licence Instrument 641
Geographic location:
United Kingdom
Year:
2022
Region / City:
United Kingdom
Subject:
Nuclear Safety, Civil Engineering
Document Type:
Nuclear Safety Technical Assessment Guide
Organ / Institution:
Office for Nuclear Regulation
Author:
Inspector and Civil Engineering Assessor
Target Audience:
ONR specialists, nuclear facility operators, safety assessors
Period of Validity:
December 2022 - May 2025
Approval Date:
December 2022
Review Date:
May 2025
Revision Commentary:
Revision 5. Re-structured with appendices. Rev 6: Updated Review Period. Issue 6.1: Minor update to remove extant URLs.
Year:
2023
Region / City:
Poznan, Poland
Theme:
Neutronic analysis, nuclear engineering, AP1000 reactor
Document type:
Research paper
Author:
Mikolaj Brzezinski, Jakub Sierchula
Target audience:
Researchers, nuclear engineers
Period of validity:
2023
Approval date:
2023
Date of changes:
Not specified