№ lp_1_18428
Alternative analysis conducted to ensure proper solution selection based on community input, costs, and regional needs.
Community: Anytown
Country: Myanmar
Chapter: Test Chapter
Submittal Date: 1/1/2018
Authors: Biff Tannen, Ivan Drago, Ed Rooney
REIC and other mentors: Jack Torrance (REIC, structural engineer), Johnny Lawrence (Faculty Advisor, Electrical engineer)
Scope of Work for the project (50 words): Design and implement a health clinic in a town of 1,500. Project includes a reinforced clinic building, water supply, electrical supply, and sanitation facilities.
Scope of Work for the analysis (100 words): This assessment will select between two alternative structural types for the clinic, three water supply locations, two electrical supply sources and two latrine technologies.
Proposed Next Step (100 words): After the preferred alternative has been selected and approved, the Test Chapter begin preparation of the Draft Construction Drawings and Draft Implementation Trip Plan. The project is now tentatively slated for construction in December 2018 after a short delay when the second assessment trip was added.
Describe Recent Contact with Community, NGO, and in country partners (100 words): Primary contact is through the NGO partner Axis Global but we regularly schedule, send and receive messages via Instafeed from the community members. We meet with the local minister of health each time we are in country but we do not maintain regular contact with the minister.
Describe the Chapters current fundraising goals and milestones (100 words): The program is on track to fundraise for the implementation. But, the extra assessment trip has set fundraising back slightly. The hope is to have the remainder of the construction costs funded through a 5k run planned in June and to have individual travelers increase their personal fundraising.
IS THE PROGRAM STILL ON TRACK TO MEET THE EWB PROJECT EXPECTATIONS? Privacy: EWB-USA may release this report in its entirety to other EWB-USA chapters or interested parties. Once the report is approved any member in Volunteer Village will be able to find and view the plan. Please do not include personal or sensitive information.
Year: 2018
Region / City: Anytown, Myanmar
Theme: Community health infrastructure
Document type: Project Report
Author: Biff Tannen, Ivan Drago, Ed Rooney
Target audience: EWB chapters, project stakeholders
Implementation period: Tentatively December 2018
Approval date: 1/1/2018
Date of last contact: 6/15/17
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.