№ files_lp_3_process_9_63808
File format: docx
Character count: 5151
File size: 29 KB
The document is a questionnaire aimed at collecting information about national regulatory and inspection practices during the transition phase from an operating reactor to a defueled status with a commitment to permanently cease power operations.
Country:
_____________
Notes:
Only one response per country is required. If more than one person from your country is participating, please co-ordinate the responses accordingly.
Note:
by 17 February 2016
Year:
2016
Region / City:
International
Topic:
Nuclear Decommissioning, Safety Inspections
Document Type:
Questionnaire
Organization / Institution:
OECD
Author:
OECD
Target Audience:
Regulatory Bodies, Nuclear Inspectors
Period of Validity:
2016
Approval Date:
17 February 2016
Date of Changes:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2024
Organization:
Early Intervention in Psychosis Service (EIPS)
Region:
Countywide
Document Type:
Consultation Paper
Audience:
EIPS staff, particularly Band 7 Youth Clinical Leads
Purpose:
Proposal to remove Band 7 Youth Clinical Lead posts and redistribute responsibilities
Policy Reference:
Management of Staff Affected by Change Policy and Procedure, version 11, May 2021
Consultation Period:
20th November 2024 – 20th December 2024
Financial Impact:
£114,050 savings expected
Staff Impact:
Two posts at risk of redundancy, increased workload for Band 6 and Band 7 staff
Implementation Timeline:
June 2025 impact assessment post-implementation
Year:
2023
Region / City:
Greenville, SC
Subject:
Debt Validation
Document Type:
Legal Request
Organization / Institution:
LVNV Funding, LLC
Author:
Marshall Lambertson
Target Audience:
LVNV Funding, LLC
Period of Validity:
N/A
Approval Date:
N/A
Date of Amendments:
N/A
Year:
2019
Region / City:
United States
Subject:
Telecommunications, Wireless Networks
Document Type:
Legal Notice
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Local government officials, legal counsel
Validity Period:
Ongoing
Approval Date:
Not specified
Modification Date:
Not specified
Year:
20____
Region / City:
-
Subject:
Non-Disclosure Agreement violation
Document Type:
Legal letter
Issuing Organization:
-
Author:
-
Target Audience:
Individual or entity under NDA
Effective Period:
-
Approval Date:
-
Amendment Date:
-
Context:
Legal notice for breach of confidentiality agreement with a demand for compliance within 24 hours.
Year:
2022
Region / City:
Big Pine Key, FL
Topic:
Legal Action, Defamation
Document Type:
Legal Notice
Author:
Christopher Ambrose
Target Audience:
Legal Professionals, Public Figures, Internet Users
Period of Action:
Ongoing
Approval Date:
April 14, 2022
Date of Changes:
N/A
Note:
Year
Subject:
Copyright infringement
Document Type:
Legal letter
Year:
2026
Region / City:
United States
Subject:
Debt Collection / Consumer Rights
Document Type:
Legal Notice / Cease and Desist Letter
Sender:
[NAME OF SENDER]
Recipient:
[DEBT COLLECTOR]
Relevant Law:
Fair Debt Collection Practices Act (15 U.S. Code § 1692c)
Method of Delivery:
Certified Mail
Date Issued:
[DATE]
Purpose:
Termination of Debt Collection Communications
Legal Consequence:
Potential Lawsuit
Year:
2020
Date:
2020-10-20
Organization:
3rd Generation Partnership Project
Working Group:
TSG-RAN WG4
Meeting:
3GPP TSG-RAN WG4 Meeting #97-e (Electronic Meeting, 2–13 Nov 2020)
Specification:
3GPP TS 38.133
Specification Version:
16.5.0
Related Specification:
3GPP TS 38.533
Release:
Rel-16
Category:
B (addition of feature)
Work Item Code:
5G_V2X_NRSL-Perf
Source Organization:
LG Electronics
Technical Domain:
5G NR radio performance and conformance testing
Technology Context:
NR V2X sidelink communication
Document Type:
Change request
Affected Clause:
A.9.1.2
Test Focus:
Initiation and cease of SLSS transmission
Applicable Equipment:
V2X-capable user equipment supporting NR Uu and sidelink operation
Test Environment:
FR1 NR cell used as synchronization reference source under non-DRX conditions
Note:
Year
Region / City:
Washington
Subject:
Child care facility operation
Document Type:
Declaration
Organization / Institution:
Department of Children, Youth, and Families (DCYF)
Author:
Child care facility provider
Target Audience:
Child care providers, DCYF
Period of Effect:
Ongoing or until closure
Year:
2025
Region / City:
Heysham
Topic:
Nuclear energy, reactor maintenance, shutdown deferral
Document type:
Project assessment report
Organization / Institution:
Office for Nuclear Regulation
Author:
Not specified
Target audience:
Not specified
Period of validity:
Up to 06 October 2025
Approval date:
May 2025
Date of changes:
None
Year:
2020
Organization:
Generation-IV International Forum (GIF)
Authors:
A. Alemberti, K. Tuček, M. Tarantino, M. Takahashi, T. Obara, M. Kondo, A. Moiseev, L. Tocheny, Y. Kuzina, I.S. Hwang, C. Smith, A. Moisseytsev, Y. Wu, M. Jin
Type of document:
Technical safety assessment report
Topic:
Nuclear reactor safety, Generation IV lead-cooled fast reactors
Target audience:
Researchers, engineers, regulatory authorities
Date of publication:
June 2020
Related documents:
Safety Design Criteria for Generation IV Lead-cooled Fast Reactor System (March 2021)
Region:
International
Language:
English
Year:
2025
Region / city:
Pelindaba, Brits Magisterial District, Madibeng Municipality, North West
Theme:
Nuclear energy, procurement
Document type:
Invitation to bid
Organization / institution:
South African Nuclear Energy Corporation SOC Ltd (Necsa)
Author:
Not specified
Target audience:
Suppliers, contractors
Period of validity:
90 days (commencing from the closing date)
Approval date:
Not specified
Date of amendments:
Not specified
Effective Date:
January 1, 2026
Chapter:
0308
Document Type:
Manual
Region / City:
United States
Thematic Focus:
Nuclear Reactor Security
Institution:
U.S. Nuclear Regulatory Commission (NRC)
Target Audience:
NRC licensees, nuclear reactor operators, security personnel
Date Approved:
January 1, 2026
Effective Date:
10/16/2023
Note:
Region / city
Year:
2025
Organization:
U.S. Nuclear Regulatory Commission (NRC)
Document Type:
Inspection Manual Appendix
Topic:
Reactor Oversight Process, Baseline Inspection Program
Effective Date:
May 13, 2025
Applicability:
NRC baseline inspection program
Responsible Offices:
Office of Nuclear Reactor Regulation, Office of Nuclear Security and Incident Response
Scope:
Monitoring of baseline inspection procedures and comprehensive review
Roles:
Director, Regional Directors, Chief of Reactor Inspection Branch, Branch Chiefs, Baseline IP Leads, Points of Contact
Frequency:
Quarterly monitoring, five-year comprehensive review
Year:
2025
Region / city:
Hinkley Point C, Somerset
Subject:
Nuclear safety, Reactor installation
Document type:
Project Assessment Report
Organization:
Office for Nuclear Regulation
Author:
Office for Nuclear Regulation
Target audience:
Nuclear industry professionals, Regulatory authorities
Effective period:
From February 2025
Approval date:
February 2025
Date of amendments:
None
Year:
2021
Region / City:
United States
Theme:
Nuclear reactor inspection
Document type:
Regulatory guidelines
Organization / Institution:
Nuclear Regulatory Commission (NRC)
Author:
NRC staff
Target Audience:
NRC inspectors, licensed nuclear operators
Period of validity:
Ongoing
Approval date:
2021
Date of changes:
2021
Publication date:
February 2024
Year:
2024
Facility:
Heysham 1 Nuclear Power Station
Reactor type:
Advanced Gas-Cooled Reactor
Reactor unit:
Reactor 1
Periodic shutdown identifier:
027
Shutdown period:
October–December 2023
Planned shutdown duration:
69 days
Document type:
Regulatory assessment report
Issuing authority:
Office for Nuclear Regulation
Dutyholder:
EDF Energy Nuclear Generation Limited
Regulatory framework:
Nuclear Site Licence Conditions 28 and 30
Subject areas:
Nuclear safety, examination, inspection, maintenance and testing
Licence instrument referenced:
Licence Instrument 641
Geographic location:
United Kingdom
Year:
2022
Region / City:
United Kingdom
Subject:
Nuclear Safety, Civil Engineering
Document Type:
Nuclear Safety Technical Assessment Guide
Organ / Institution:
Office for Nuclear Regulation
Author:
Inspector and Civil Engineering Assessor
Target Audience:
ONR specialists, nuclear facility operators, safety assessors
Period of Validity:
December 2022 - May 2025
Approval Date:
December 2022
Review Date:
May 2025
Revision Commentary:
Revision 5. Re-structured with appendices. Rev 6: Updated Review Period. Issue 6.1: Minor update to remove extant URLs.
Year:
2023
Region / City:
Poznan, Poland
Theme:
Neutronic analysis, nuclear engineering, AP1000 reactor
Document type:
Research paper
Author:
Mikolaj Brzezinski, Jakub Sierchula
Target audience:
Researchers, nuclear engineers
Period of validity:
2023
Approval date:
2023
Date of changes:
Not specified