№ files_lp_4_process_3_097107
File format: docx
Character count: 1807
File size: 58 KB
Record of vacuum integrity testing for the vapor return line at a facility under the jurisdiction of the San Diego County Air Pollution Control District, detailing measured and calculated pressure differentials and calibration data for compliance verification.
Year:
2026
Region / City:
San Diego, CA
Document Type:
Test Record
Agency:
San Diego County Air Pollution Control District
Note:
Facility Name
Vapor Return Line Diameter:
2” / 3”
Test Results:
Pass / Fail
Applicable Regulation:
ARB EO G-70-187, Exhibit 4
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2010
Region / City:
Not specified
Subject:
Plasma Enhanced Chemical Vapor Deposition (PECVD)
Document Type:
Operating Procedure
Organization:
Oxford Instruments
Author:
Sam Bell
Target Audience:
Laboratory personnel, engineers
Period of Validity:
Not specified
Approval Date:
10 June 2010
Revision Date:
Not specified
Note:
Year
Topic:
Plant protection, pest control
Document Type:
Guidelines
Year:
2019
Region / City:
Global
Topic:
Geodesy, Remote Sensing, GNSS
Document Type:
Research Supplementary Material
Organization:
GeoForschungsZentrum (GFZ), Technische Universität Berlin, Hohai University, Norwegian Polar Institute
Author:
Jungang Wang, Zhilu Wu, Maximilian Semmling, Florian Zus, Sebastian Gerland, Markus Ramatschi, Maorong Ge, Jens Wickert, Harald Schuh
Target Audience:
Researchers, Geodesists, Earth Scientists
Period of Validity:
N/A
Date of Approval:
N/A
Date of Changes:
N/A
Note:
Year
Subject:
Roofing, Building Materials
Document Type:
Technical Specification
Organization / Institution:
Benjamin Obdyke Incorporated
Target Audience:
Contractors, Architects, Builders
Year:
2023
Region / City:
United States
Subject:
Construction / Concrete slab moisture protection
Document Type:
Technical specification
Organization / Institution:
Stego Industries LLC
References:
ASTM E1745-17, ASTM E1643-18a, ACI 302.2R-06, ACI 302.1R-15
Materials:
Stego Wrap Vapor Barrier, Stego Tape, Stego Mastic, Stego Crete Claw, Stego Term Bar, StegoTack Tape, Beast Foot, Beast Form Stake, Beast Screed, Beast Hook
Installation Guidelines:
ASTM E1643 compliant procedures for vapor barrier placement, sealing, and penetration prevention
Target Audience:
Contractors, engineers, and architects involved in concrete slab construction
Performance Criteria:
Permeance <0.01 Perms, ASTM E1745 Class A, minimum 15 mil thickness
Testing Requirements:
All tests performed on a single production roll per ASTM E1745 Section 8.1
Submittals:
Manufacturer’s samples, installation instructions, and test result summaries
Execution Requirements:
Site preparation, barrier layout, seam sealing, penetration sealing, perimeter sealing, and repair procedures
Year:
2023
Region:
International / Japan (case study reference)
Topic:
Moisture control in membrane containment tanks
Document Type:
Technical agenda / engineering note
Organization:
Gaztransport & Technigaz (GTT)
Author:
Fabien Pesquet
Source Document:
Doug Miller Comments on 625-2005 of 03/09/2019
Revision:
0
Impact:
Neutral
Purpose:
Assessment of moisture accumulation and coating requirements for insulation spaces
Standards Referenced:
ACI 376, ASTM E96, ISO 4624
Key Proposal:
Requirement of moisture barrier and purging or pressure control system for insulation layers
Year:
2026
Region / City:
N/A
Subject:
Polyaspartic Coatings, Vapor Barrier Coatings
Document Type:
Product Guide
Organization:
E4E
Author:
N/A
Target Audience:
Industrial and commercial facilities
Period of Validity:
N/A
Approval Date:
N/A
Date of Modifications:
N/A
Description:
E4E Product Guide provides detailed information about various polyaspartic and vapor barrier coatings, including their features, advantages, and usage in industrial and commercial applications.
Year:
2020
Region / City:
Martinsburg, WV
Topic:
Procurement / Market Research
Document Type:
Sources Sought Notice
Agency / Organization:
Department of Veterans Affairs
Author:
Kristina Blevins
Target Audience:
Small businesses, contractors, and suppliers
Period of Validity:
Not specified
Approval Date:
03-03-2020
Amendment Date:
Not specified
The document is a Sources Sought Notice issued by the Martinsburg VA Medical Center to identify sources capable of providing a Brand Name Chemical Vapor Monitoring System:
ChemDAQ Steri-Trac 2.25 for specific safety and monitoring requirements related to chemical vapor levels in a medical facility.
Confidentiality Level:
PU - Public
Document Status:
Document Released
Document Type:
Specification (Requirements Specification Document)
Product Category:
RSD Product Category B
Facility:
ELI Beamlines
Location:
Experimental Hall E1
Tender Code:
TP25_039
OBS Code:
88
Document Branch:
Engineering & Scientific Documents
Authors:
Mateusz Rebarz; Aleksei Kuzmenko
Prepared By:
Mateusz Rebarz
System Engineer:
Aleksei Kuzmenko
Reviewed By:
Birgit Plötzeneder; Jakob Andreasson; Lucie Kaletusová; Ondrej Hort; Radek Toman; Veronika Olšovcová; Viktor Fedosov; Vojtěch Gaman
Approved By:
Jakob Andreasson
Date of Creation:
18 June 2025
Date of Last Modification:
27 June 2025
Keywords:
Steering mirror mounts; beam position detectors; closed-loop controller
Scope:
Functional, performance, design, delivery, safety, and quality requirements for an in-vacuum laser beam stabilisation system
System Components:
Piezo-actuated steering mirror mounts; real-time beam position detectors; beam stabilisation controller
Verification and Acceptance:
Factory Acceptance Test and on-site verification at ELI Beamlines
Year:
2015
Region / City:
Not specified
Subject:
Laboratory and healthcare vacuum systems
Document Type:
Technical Specification
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Contractors, engineers, and healthcare facility designers
Period of validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2022
Region / City:
Cornwall, UK
Subject:
Geothermal energy, tender invitation
Document type:
Invitation to tender
Issuing organization:
Eden Geothermal Limited
Author:
Augusta Grand, Executive Director
Target audience:
Suppliers of vacuum insulated tubing and related equipment
Action period:
From 11th March 2022 to 19th April 2022
Approval date:
11th March 2022
Amendment date:
Not specified
Year:
2023
Region / City:
Americas
Topic:
Safe Work Practices, Vacuum Truck Operations
Document Type:
Safety Standard
Organization:
Chevron
Author:
Chevron Company
Target Audience:
Chevron employees and service providers working with vacuum trucks
Effective Date:
2023
Date of Approval:
2023
Revision History:
No revisions noted
Year:
2016
Region / City:
Morton Grove, IL
Topic:
Vacuum heating and condensate pumping unit specifications
Document Type:
Technical specifications
Organization:
Bell & Gossett
Author:
Bell & Gossett
Target Audience:
Engineers, technical professionals in HVAC industry
Period of Validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Note:
Year
Organization / Institution:
Shanghai Huaming Power Equipment Co., Ltd.
Voltage:
50Hz, 60Hz
Rated Capacity:
(value) MVA
Rated Voltage:
(value) kV
Ambient Temperature:
-25~+40°C, -40~+40°C
Insulation Strength:
Rated AC withstand voltage (kV/50Hz, 1min)
Max. Rated Current:
(value) A
Additional Requirements:
With supporting frame, With cabinet
Title:
Back Pack Vacuum Cleaning
Type of document:
Workplace safety procedure
Subject:
Safe use and operation of back pack vacuum cleaner
Equipment:
Back pack vacuum cleaner
Hazards identified:
Repetition of movement; awkward posture; noise; duration of task; vibration; shock; inhalation of fine dust; water hazards and potential electrocution; slip, trip and fall; sprains and strains
Required training:
Appropriate training in safe use and operation
Pre-operational requirements:
Clothing and footwear precautions; electrical safety checks; inspection of collection bag; adjustment of wand and harness; safe lifting method
Operational requirements:
Upright posture; low traffic use; correct cord management; proper switching and disconnection; prohibition of daisy chaining cords; regular emptying of dust bag
Housekeeping requirements:
Power disconnection; correct storage of hoses and leads; removal and storage of attachments; restriction on lending equipment for construction clean-up
Review information:
Date of last review (blank field)
Authorisation:
Signature (blank field)
Year:
2025
Region / City:
Ugu District Municipality
Topic:
Jetting and Sewage Vacuum Tanker Services (VTS)
Document Type:
Bid Notice
Organ / Institution:
Ugu District Municipality
Author:
Ugu District Municipality
Target Audience:
Relevant service providers
Effective Period:
36 months
Approval Date:
30 May 2025
Amendment Date:
N/A
Note:
Year
Contextual Description:
Detailed protocol for performing vacuum filtration using Büchner flasks, with steps for setup, filtering, and post-filtration procedures.
Year:
2011
Region / City:
Portland, Oregon
Topic:
Vibration Isolation System
Document Type:
Final Report
Organization / Institution:
Portland State University, Maseeh College of Engineering and Computer Science
Author:
Mark Romeo, Bree DeArmond, Ron Pahle, Khoa T. Tran, Duc M. Le, Thanh Q. Nguyen
Target Audience:
Engineers, Researchers, Manufacturers, Academics
Period of Action:
2011
Approval Date:
June 6, 2011
Date of Changes:
None specified