№ lp_2_3_52901
File format: docx
Character count: 15366
File size: 39 KB
This document outlines the materials and installation methods for vapor-permeable fluid-applied air barrier systems used in building construction, detailing performance, application, and coordination requirements.
Note:
Year
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Note:
Year
Theme:
Permeable Pavement Systems, Inspection, and Maintenance
Document Type:
Operation & Maintenance Plan
Agency / Organization:
[Organization Name]
Author:
[Author Name]
Target Audience:
Departments responsible for maintenance and operation of permeable pavements
Effective Period:
From the completion of the project construction
Note:
Year
Subject:
Roofing, Building Materials
Document Type:
Technical Specification
Organization / Institution:
Benjamin Obdyke Incorporated
Target Audience:
Contractors, Architects, Builders
Note:
Year
Topic:
Roofing
Document Type:
Technical Specification
Target Audience:
Contractors, roofing professionals
Year:
2014
Region / City:
Beachwood, OH
Topic:
Waterproofing, Construction Materials
Document Type:
Guide Specification
Organization:
Tremco, Inc.
Author:
Tremco, Inc.
Target Audience:
Architects, Specifiers, Contractors
Duration:
Not specified
Approval Date:
Not specified
Revision Date:
Not specified
Year:
2023
Region / City:
USA
Topic:
Building Materials, Air Barriers
Document Type:
Technical Specification
Organization / Institution:
USG, Tremco
Author:
USG, Tremco
Target Audience:
Construction Professionals, Specifiers
Effective Period:
Ongoing
Approval Date:
Not specified
Amendment Date:
Not specified
Section Number:
07 14 13
Document Title:
Hot Fluid-Applied Waterproofing
Discipline:
Construction Specifications
Construction Division:
Division 07 – Thermal and Moisture Protection
Subject:
Hot fluid-applied rubberized asphalt waterproofing systems
Application Area:
Horizontal deck waterproofing
Related Sections:
03 31 00 Cast-in-Place Concrete; 04 20 00 Unit Masonry; 07 21 00 Thermal Insulation; 07 72 73 Membrane Leak Detection System; 07 76 13 Roof Pavers; 07 92 00 Joint Sealants; 07 95 00 Expansion Control; 33 46 00 Subdrainage
Referenced Standards:
ASTM C920; ASTM D4258; ASTM D4263; ASTM D4716; ASTM E84; ASTM E96/E96M; CAN/CGSB-37.50-M89
Manufacturer Mentioned:
AVM Industries
Work Scope:
Materials, installation procedures, quality assurance, submittals, and warranty requirements for waterproofing systems
Installer Requirements:
Manufacturer-approved installer with trained workers and on-site supervisor with minimum three years of similar experience
Testing and Inspection:
Independent waterproofing inspector and qualified testing agency for observation and compliance verification
Quality Control Measures:
Mockups, product testing reports, field quality control reports
Submittal Types:
Product data, shop drawings, qualification data, warranty samples
Environmental Conditions:
Installation limited by manufacturer-recommended temperature and substrate conditions
Packaging and Storage:
Materials stored in original packaging in weather-protected conditions
Project Procedures:
Preinstallation conference, coordination with adjacent construction work, inspection prior to concealment
Warranty Options:
Manufacturer and installer warranties including optional AVM Aussie Guard No Dollar Limit Warranty
Year:
2026
Region / City:
Not specified
Subject:
Roofing materials and coatings
Document Type:
Technical guide
Organization / Institution:
DAGS (Department of Accounting and General Services)
Author:
Not specified
Target Audience:
Construction and roofing professionals
Application Period:
Reroofing and new metal roof applications
Approval Date:
Not specified
Amendment Date:
Not specified
Key Products:
ASTEC Ceramic Coating, Thermo Seal, Permakote
Material Requirements:
Single supplier, manufacturer warranty, trained applicators
Year:
2010
Region / City:
Not specified
Subject:
Plasma Enhanced Chemical Vapor Deposition (PECVD)
Document Type:
Operating Procedure
Organization:
Oxford Instruments
Author:
Sam Bell
Target Audience:
Laboratory personnel, engineers
Period of Validity:
Not specified
Approval Date:
10 June 2010
Revision Date:
Not specified
Note:
Year
Topic:
Plant protection, pest control
Document Type:
Guidelines
Year:
2019
Region / City:
Global
Topic:
Geodesy, Remote Sensing, GNSS
Document Type:
Research Supplementary Material
Organization:
GeoForschungsZentrum (GFZ), Technische Universität Berlin, Hohai University, Norwegian Polar Institute
Author:
Jungang Wang, Zhilu Wu, Maximilian Semmling, Florian Zus, Sebastian Gerland, Markus Ramatschi, Maorong Ge, Jens Wickert, Harald Schuh
Target Audience:
Researchers, Geodesists, Earth Scientists
Period of Validity:
N/A
Date of Approval:
N/A
Date of Changes:
N/A
Note:
Year
Subject:
Roofing, Building Materials
Document Type:
Technical Specification
Organization / Institution:
Benjamin Obdyke Incorporated
Target Audience:
Contractors, Architects, Builders
Year:
2023
Region / City:
United States
Subject:
Construction / Concrete slab moisture protection
Document Type:
Technical specification
Organization / Institution:
Stego Industries LLC
References:
ASTM E1745-17, ASTM E1643-18a, ACI 302.2R-06, ACI 302.1R-15
Materials:
Stego Wrap Vapor Barrier, Stego Tape, Stego Mastic, Stego Crete Claw, Stego Term Bar, StegoTack Tape, Beast Foot, Beast Form Stake, Beast Screed, Beast Hook
Installation Guidelines:
ASTM E1643 compliant procedures for vapor barrier placement, sealing, and penetration prevention
Target Audience:
Contractors, engineers, and architects involved in concrete slab construction
Performance Criteria:
Permeance <0.01 Perms, ASTM E1745 Class A, minimum 15 mil thickness
Testing Requirements:
All tests performed on a single production roll per ASTM E1745 Section 8.1
Submittals:
Manufacturer’s samples, installation instructions, and test result summaries
Execution Requirements:
Site preparation, barrier layout, seam sealing, penetration sealing, perimeter sealing, and repair procedures
Year:
2023
Region:
International / Japan (case study reference)
Topic:
Moisture control in membrane containment tanks
Document Type:
Technical agenda / engineering note
Organization:
Gaztransport & Technigaz (GTT)
Author:
Fabien Pesquet
Source Document:
Doug Miller Comments on 625-2005 of 03/09/2019
Revision:
0
Impact:
Neutral
Purpose:
Assessment of moisture accumulation and coating requirements for insulation spaces
Standards Referenced:
ACI 376, ASTM E96, ISO 4624
Key Proposal:
Requirement of moisture barrier and purging or pressure control system for insulation layers
Year:
2026
Region / City:
N/A
Subject:
Polyaspartic Coatings, Vapor Barrier Coatings
Document Type:
Product Guide
Organization:
E4E
Author:
N/A
Target Audience:
Industrial and commercial facilities
Period of Validity:
N/A
Approval Date:
N/A
Date of Modifications:
N/A
Description:
E4E Product Guide provides detailed information about various polyaspartic and vapor barrier coatings, including their features, advantages, and usage in industrial and commercial applications.
Year:
2020
Region / City:
Martinsburg, WV
Topic:
Procurement / Market Research
Document Type:
Sources Sought Notice
Agency / Organization:
Department of Veterans Affairs
Author:
Kristina Blevins
Target Audience:
Small businesses, contractors, and suppliers
Period of Validity:
Not specified
Approval Date:
03-03-2020
Amendment Date:
Not specified
The document is a Sources Sought Notice issued by the Martinsburg VA Medical Center to identify sources capable of providing a Brand Name Chemical Vapor Monitoring System:
ChemDAQ Steri-Trac 2.25 for specific safety and monitoring requirements related to chemical vapor levels in a medical facility.
Year:
2026
Region / City:
San Diego, CA
Document Type:
Test Record
Agency:
San Diego County Air Pollution Control District
Note:
Facility Name
Vapor Return Line Diameter:
2” / 3”
Test Results:
Pass / Fail
Applicable Regulation:
ARB EO G-70-187, Exhibit 4