№ lp_1_2_00439
File format: docx
Character count: 37862
File size: 268 KB
Assessment and response to the development proposal at 80 Drumalbyn Road, Bellevue Hill, including details on stormwater management, geotechnical concerns, traffic, and infrastructure.
Year:
2025
Region / city:
Bellevue Hill, Australia
Subject:
Demolition and new construction of residential flat buildings
Document Type:
Referral Response
Agency / institution:
Council’s Development Engineering Department
Author:
W Huynh
Target Audience:
Council Authorities, Traffic Engineers, Development Applicants
Effective Period:
2024-2025
Approval Date:
Not specified
Date of Changes:
07/04/2025
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Note:
Year
Institution:
Bellevue College
Year:
2015
Region / City:
Bellevue
Topic:
Telecommunications, Internet and Cable TV Services
Document Type:
Survey Report
Organization / Institution:
City of Bellevue, Northwest Research Group, LLC
Author:
Northwest Research Group, LLC
Target Audience:
Residents of Bellevue, Telecommunication Service Providers
Period of Validity:
October 29 - November 29, 2015
Approval Date:
03/04/2016
Date of Changes:
None
Date:
November 27, 2018
Location:
Bellevue City Hall Room (1E-112)
Type of Document:
Meeting Notes
Meeting Time:
6:09 p.m.
Participants:
Anthony Austin, Haruka Kojima, Jennifer Karls, Eloisa Tran, Chinar Bopshetty, Justin Daigneault, Mohamed Bakr, Tom Brewer, Aisha Kabani, Angela de la Hoz, Michael Carr, Liena Ugarova, Seema Bahl, Sapan Parekh, Guang-an Wu, Quiana Ross, Nahyeli Mendivil
Absentees:
Jingdong Yu, Aleksandra Poseukova, Margie Ye, Adnan Siddiquie
Facilitator:
Chairman Anthony Austin
Notetaker:
Tom Brewer (Interim Secretary)
Organization:
Bellevue Diversity Advisory Network (BDAN)
Topic:
Advisory session with ARCH on housing needs and outreach strategies for Eastside communities
Target Audience:
BDAN members, ARCH representatives
Period of Action:
November 27, 2018
Meeting Summary:
Discussion of housing needs on Eastside, outreach strategies, and engagement with diverse communities
Organization:
Bellevue Independent Schools
Position Title:
Prevention Specialist
Reports to:
Superintendent or designee
Qualifications:
Valid certification or licensure in accordance with the Commonwealth of Kentucky; Bachelor’s Degree in School Counseling, Special Education, Psychology, Social Work or related field
Minimum Education Requirement:
Bachelor’s Degree
Region:
Kentucky
Country:
United States
Field:
Education and Student Support Services
Primary Focus:
Substance Misuse Prevention and Social Emotional Support
Responsibilities:
Consultation with staff and administrators; coordination of prevention strategies; liaison between schools and families; facilitation of Tier I, II, and III services; training participation; database maintenance
Policy Framework:
District and School policies and procedures
Year:
2024
Region / City:
Bellevue Fire District No. 2, Town of Cheektowaga, New York
Theme:
Election Announcement
Document Type:
Official Notice
Organization / Institution:
Bellevue Fire District No. 2
Author:
John J McFarland
Target Audience:
Registered Voters in Bellevue Fire District No. 2
Action Period:
December 10, 2024
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2023
Region / City:
Bellevue, Washington
Topic:
Nursing Program Admission Requirements
Document Type:
Admission Guidelines
Organization:
Bellevue College
Author:
Bellevue College
Target Audience:
Prospective Nursing Students
Admission Period:
Fall 2023 and onward
Date of Approval:
Winter 2024
Date of Changes:
Winter 2024
Date:
26/04/2023
Client:
Angela Carson
Address:
11 Bellevue Terrace, Edinburgh, EH7 4DT
Organisation:
Hermitage Windows Ltd
Location:
Edinburgh, Scotland
Document Type:
Building repair and replacement proposal
Subject:
Restoration and replacement of timber sash and case windows
Scope of Work:
Double glazed upgrades, manufacture of new timber sashes, restoration of existing window cases, draught proofing, ironmongery installation and full window painting
Window Types:
4 over 8, 6 over 6, and 2 over 2 sash windows
Materials:
Sustainable redwood timber, argon-filled double glazed units, low E heritage glass, warm edge spacer bar
Finishes:
Polished brass or polished chrome ironmongery, external putty finish
Glazing Specification:
14mm heritage double glazed unit (4mm glass / 6mm spacer / 4mm glass) with argon gas
Safety Requirement:
Toughened glass for windows below 800mm from ground level
Additional Systems:
Easy clean simplex fire escape system for windows above ground floor
Painting Specification:
Multi-coat system using Johnstone’s paints
Number of Windows Covered:
6
Building Elevations:
Front and rear elevations, first floor
Condition Assessment:
Existing windows assessed as severely deteriorated with soft and rotten timber beyond repair
Reference Guidance:
Historic Environment Scotland “Managing Change in the Historic Environment: Windows”
Supporting Materials:
Photographic evidence of existing window condition and building elevations
Year:
2019
Region / city:
Uzbekistan
Theme:
Corruption, Forced Labour, Human Rights
Document Type:
Report
Organ / Institution:
Uzbek-German Forum for Human Rights, International State Crime Initiative, Tashkent-Demolition
Author:
Uzbek-German Forum for Human Rights, International State Crime Initiative
Target Audience:
International Human Rights Organizations, Governments, Policy Makers
Period of Action:
2015-2019
Approval Date:
Not specified
Date of Changes:
Not specified
Context:
A human rights report analyzing corruption, forced labor in the cotton sector, and the role of the government in perpetuating these issues in Uzbekistan.
Year:
2026
Organization:
ABB
Document type:
Guideline
Scope:
ABB employees, contractors, and affiliated partners
Topics:
Health, safety, risk management, demolition procedures
Author:
ABB HSE & Security Management System
Target audience:
Project managers, HSE advisors, contractors
References:
SA-S-002 Project Management Requirements, UK Health and Safety Executive figures
Applicable standards:
ABB Control Standard, HSE regulations
Section number:
02 82 13.41
Subject:
Asbestos abatement in total demolition
Document type:
Technical specifications
Applicable agency:
Department of Veterans Affairs
Regulatory framework:
EPA NESHAP 40 CFR Part 61 Subpart M; EPA 40 CFR Part 763 Subpart E
Scope of work:
Removal of regulated asbestos-containing materials prior to total demolition
Project context:
Total demolition of facilities
Survey requirements:
Full NESHAP asbestos inspection, including intrusive surveys where required
Defined materials:
ACM, RACM, friable asbestos, Category I and Category II non-friable ACM
Related hazards addressed:
Lead-based paint, PCBs, mercury, fluorescent bulbs, batteries, soil contamination
Labor requirements:
Davis-Bacon Act prevailing wage requirements
Related documents:
Contract drawings, Division 01 General Requirements, Accident Prevention FAR 52.236-13
Year:
2018
Region / City:
Panama City, Florida
Subject:
Building Demolition
Document Type:
Invitation for Bids
Organization:
City of Panama City
Author:
Becky Barnes
Target Audience:
Contractors and Bidders
Period of Validity:
Until March 29, 2018
Approval Date:
March 29, 2018
Amendment Date:
N/A
Year:
2021
Region / City:
Welwyn Garden City
Theme:
Estate Management, Architecture
Document Type:
Planning Application Decision
Organization:
Welwyn Hatfield Borough Council
Author:
Mr James Homer
Target Audience:
Residents, Property Owners, Local Authorities
Effective Period:
2021
Approval Date:
13 July 2021
Modification Date:
13 July 2021
Year:
2022
Region / City:
New River Gorge National Park and Preserve
Theme:
Historic Preservation, National Park Service
Document Type:
Final Report
Agency / Organization:
National Park Service
Author:
Bratslavsky Consulting Engineers, Inc. and Aurora Research Associates LLC
Target Audience:
National Park Service, Historic Preservation Professionals, Park Management
Period of Activity:
2020–2022
Approval Date:
November 10, 2022
Date of Revisions:
Not specified
Year:
2025
Region / City:
Berea, Kentucky
Topic:
Demolition, Construction
Document Type:
Invitation to Bid
Organization:
City of Berea
Author:
Deco Architects
Target Audience:
Contractors
Action Period:
October 2nd, 2025
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2019
Region / City:
Western Australia
Topic:
Vegetation clearing and demolition
Document Type:
Specification
Organization / Institution:
MAIN ROADS Western Australia
Author:
Not specified
Target Audience:
Contractors, Environmental Specialists, and Engineers
Period of Validity:
Not specified
Approval Date:
21/10/2019
Amendment Dates:
26/08/2013, 14/06/2007, 01/08/2006
Year:
2026
Region / City:
Louisiana
Subject:
Asbestos Contaminated Debris Activity Notification
Document Type:
Form
Agency / Institution:
Louisiana Department of Environmental Quality
Author:
Louisiana Department of Environmental Quality
Target Audience:
Contractors, Demolition and Renovation professionals, Environmental Services
Action Period:
Ongoing
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2023
Region / City:
Ohio
Theme:
Environmental Protection, Waste Management
Document Type:
Application Form
Organization / Institution:
Ohio Environmental Protection Agency (Ohio EPA)
Author:
Ohio Environmental Protection Agency
Target Audience:
Construction and Demolition Debris Processing Facility Operators, Permitting Authorities
Period of Action:
Ongoing
Approval Date:
N/A
Amendment Date:
N/A
Year:
2013
Region / City:
Reedy Creek
Subject:
Construction Fire Safety
Document Type:
Checklist
Organization / Institution:
Reedy Creek Fire Department
Author:
Not specified
Target Audience:
Construction teams, general contractors, fire safety managers
Period of Validity:
Ongoing until updated
Approval Date:
Not specified
Date of Amendments:
Not specified
Year:
2026
Region / City:
Minnesota
Topic:
Asbestos & Demolition
Document Type:
Notification Form
Author:
Minnesota Pollution Control Agency (MPCA)
Target Audience:
Contractors, Building Owners
Period of Action:
10 working days before renovation, deconstruction, or demolition
Approval Date:
Not specified
Amendment Date:
Not specified
Description:
Notification required for all NESHAP-regulated facilities involved in renovation, deconstruction, or demolition to ensure compliance with asbestos regulations.
Industrial Solid Waste Management Plan (ISWMP) for construction and demolition (C&D) waste landfills
Note:
Year
Topic:
Waste management, Construction and Demolition waste
Document type:
Plan, Guideline
Organization / institution:
Minnesota Pollution Control Agency (MPCA)
Author:
Minnesota Pollution Control Agency (MPCA)
Target audience:
Facility operators, permit holders