№ files_lp_4_process_3_097405
File format: docx
Character count: 9141
File size: 31 KB
Intergovernmental funding agreement defining financial obligations, legal conditions, and project responsibilities related to the widening and improvement of the 5500 West roadway corridor in Hooper City.
Year:
2023
Region / City:
Hooper City, Weber County, Utah, United States
Document Type:
Intergovernmental agreement
Subject:
Transportation infrastructure funding and roadway improvement
Project Name:
5500 West Roadway Improvement Project
Parties:
Weber County; Hooper City
Organizations Involved:
Weber Area Council of Governments (WACOG); Weber County Commission
Legal Basis:
Utah Code Annotated §59-12-2217; Utah Code Annotated §72-2-117.5
Funding Sources:
County Option Sales and Use Tax for Transportation Fund; Local Transportation Corridor Preservation Fund; City matching funds
Previously Awarded Funds:
$344,460 Corridor Preservation Funds; $3,331,449 Sales Tax Funds
Additional County Funding:
$2,100,000 programmed for calendar year 2023
Local Matching Funds:
$326,000 total committed by Hooper City
Project Location:
5500 West corridor from 4200 South to 3550 South
Project Length:
0.83 miles
Approving Bodies:
Weber Area Council of Governments; Weber County Commission
Initial Approval Date:
November 5, 2018 (WACOG); November 20, 2018 (Weber County Commission)
Amendment Approval Date:
January 9, 2023
Infrastructure Elements:
Road widening, intersection improvements, paved shoulders, sidewalks, crosswalks, drainage, curb and gutter, center turn lanes
Responsibilities:
County reimbursement of eligible construction expenditures; City construction, maintenance, and completion of the project
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
1970
Region / City:
United Kingdom
Topic:
Literature analysis
Document type:
Text analysis
Author:
Susan Hill
Target audience:
Students, Literature scholars
Period of applicability:
Not specified
Date of approval:
Not specified
Date of modification:
Not specified
Year:
2025
Region / City:
United States
Subject:
Employee Retirement Income Security Act (ERISA) reporting
Document type:
Form
Organization:
Department of the Treasury, Internal Revenue Service, Department of Labor, Employee Benefits Security Administration
Author:
U.S. Government
Target Audience:
Employers, plan sponsors, administrators of employee benefit plans
Effective Period:
Calendar year 2025
Approval Date:
2025
Amendment Date:
N/A
Context:
This is an official government form used for reporting information about interests in Multi-Employer Trusts, Collective Trusts, Pooled Separate Accounts, and similar entities under ERISA for employee benefit plans.
Year:
2025
Type of Document:
Instruction manual
Governing Law:
ERISA, Internal Revenue Code
Agency:
Department of Labor (DOL), Internal Revenue Service (IRS), Pension Benefit Guaranty Corporation (PBGC)
Document Scope:
Employee benefit plans, Direct Filing Entities (DFEs)
Filing Method:
Electronic (EFAST2)
Updates:
Plan characteristic codes, administrative penalties
Year:
2024
Note:
Region / City
Topic:
Insurance information for employee benefit plans under ERISA
Document Type:
Form
Organization / Institution:
Department of the Treasury, Internal Revenue Service, Department of Labor, Employee Benefits Security Administration, Pension Benefit Guaranty Corporation
Period of Action:
Calendar year 2024
Year:
2022
Region / City:
N/A
Topic:
Proposed changes to Form 5500 and related instructions
Document Type:
Proposed Regulatory Changes
Organization / Institution:
N/A
Author:
N/A
Target Audience:
Entities required to file Form 5500
Period of Validity:
2022
Approval Date:
N/A
Date of Changes:
N/A
Year:
2023
Region / City:
Jackson
Theme:
Counseling, Behavioral Change
Document Type:
Course Syllabus
Institution:
Reformed Theological Seminary
Instructor:
William J. Richardson, Ph.D.
Target Audience:
Students in Counseling or Related Fields
Period:
Summer 2023
Approval Date:
N/A
Revision Date:
N/A
Year:
2025
Region / city:
N/A
Topic:
Pension Plan Funding Information
Document Type:
Actuarial Schedule
Organization / institution:
U.S. Department of the Treasury, Internal Revenue Service
Author:
N/A
Target audience:
Pension plan administrators, actuaries, employers, and government agencies
Period of validity:
Plan year 2025
Approval date:
N/A
Date of amendments:
N/A
Year:
2022
Region / City:
United States
Subject:
Employee Benefit Plans, IRS, ERISA
Document Type:
Instruction Manual
Agency:
Department of Labor (DOL), Internal Revenue Service (IRS), Pension Benefit Guaranty Corporation (PBGC)
Author:
United States Government
Target Audience:
Administrators and sponsors of employee benefit plans
Effective Period:
2022
Approval Date:
2022
Amendment Date:
Not specified
Year:
2023
Region / City:
Australia
Topic:
Financial sector regulation
Document Type:
Government Determination
Issuing Authority:
Australian Prudential Regulation Authority (APRA)
Author:
Michael Murphy
Target Audience:
Financial sector entities, RSE licensees
Commencement Date:
23 May 2023
Amendment Date:
N/A
Application Period:
Ongoing from registration date
Reporting Period:
Quarterly (30 September, 31 December, 31 March, 30 June)
Due Date for Submission:
28 to 40 calendar days after reporting period
Year:
2020
Country:
United States
Document Type:
Financial reporting schedule / regulatory form
Form Number:
Schedule H (Form 5500)
Regulatory Framework:
Employee Retirement Income Security Act of 1974 (ERISA); Internal Revenue Code section 6058(a)
Responsible Agencies:
Department of the Treasury; Internal Revenue Service; Department of Labor Employee Benefits Security Administration; Pension Benefit Guaranty Corporation
OMB Control Number:
1210-0110
Purpose:
Reporting financial information of employee benefit plans
Related Form:
Form 5500 Annual Return/Report of Employee Benefit Plan
Reporting Period:
Calendar plan year 2020 or applicable fiscal plan year
Content Sections:
Asset and Liability Statement; Income and Expense Statement
Plan Identification Fields:
Plan name; three-digit plan number (PN); plan sponsor name; employer identification number (EIN)
Public Access Status:
Open to public inspection
Year:
2022
Region / City:
New York, Queens
Topic:
Eminent Domain, Roadway Improvements
Document Type:
Public Hearing Notice
Authority / Organization:
City of New York, Department of Design and Construction
Target Audience:
Property owners, public participants, residents
Action Period:
February 24, 2022
Approval Date:
February 24, 2022
Amendment Date:
March 3, 2022
Note:
Year
Year:
2025
Region / City:
Richmond County, New York
Subject:
Condemnation Proceeding, Property Acquisition
Document Type:
Legal Notice
Agency / Organization:
City of New York, Corporation Counsel
Author:
Muriel Goode-Trufant, Corporation Counsel
Target Audience:
Property Owners, Legal Professionals, Public
Effective Period:
Not specified
Approval Date:
October 6, 2025
Modification Date:
Not specified
Note:
Year
Year:
2025
Region / City:
Texas
Topic:
Roadway construction, specifications, and contractor guidelines
Document type:
Technical specification
Organization / Institution:
Texas Department of Transportation (TxDOT)
Author:
Kevin
Target audience:
Contractors, Designers, Construction Managers
Effective period:
October 09, 2025
Approval date:
October 09, 2025
Modification date:
Not specified
Year:
2020
Region / City:
Oregon
Subject:
Roadway Engineering
Document Type:
Draft
Organization / Institution:
Oregon Department of Transportation
Author:
Unknown
Target Audience:
Engineering professionals
Period of validity:
Not specified
Approval Date:
3/30/2020
Modification Date:
Not specified
Context:
This document is a draft calculation book for roadway engineering design, outlining required and optional design standards and specifications for review.
Year:
2010
Region / City:
Georgia
Topic:
Environmental Protection, Roadway Drainage
Document Type:
Legal Guidance
Agency / Institution:
Georgia Environmental Protection Division (EPD), Georgia Department of Transportation (GDOT)
Author:
Jim Ussery, Bert Langley
Target Audience:
Government agencies, contractors, construction professionals
Effective Period:
2010-present
Approval Date:
September 20, 2010
Amendment Date:
June 8, 2006 (prior memorandum)
Legal Authority:
Georgia Erosion and Sedimentation Control Act, Georgia Water Quality Control Act, Clean Water Act
Permits:
NPDES Construction General Stormwater Permit (GAR100002)
Context:
Legal guidance document outlining the exemption of roadway drainage structure construction from stream buffer variance requirements in Georgia, with specific references to applicable regulations and previous memoranda.
Year:
2026
Region / City:
Various counties
Theme:
Roadway design, Right-of-Way, Drainage
Document Type:
Design and planning document
Organization / Institution:
Transportation Department
Author:
Unknown
Target Audience:
Transportation engineers, project managers, consultants
Period of Action:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified