№ lp_1_24303
File format: docx
Character count: 10835
File size: 47 KB
This document is a legal agreement between the Minister of Transportation and Economic Corridors and a registered operator, outlining conditions for adjusting pipeline infrastructure during roadway upgrades, ensuring safety and compliance with relevant laws.
Note:
Year
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2022
Region / City:
New York, Queens
Topic:
Eminent Domain, Roadway Improvements
Document Type:
Public Hearing Notice
Authority / Organization:
City of New York, Department of Design and Construction
Target Audience:
Property owners, public participants, residents
Action Period:
February 24, 2022
Approval Date:
February 24, 2022
Amendment Date:
March 3, 2022
Note:
Year
Year:
2025
Region / City:
Richmond County, New York
Subject:
Condemnation Proceeding, Property Acquisition
Document Type:
Legal Notice
Agency / Organization:
City of New York, Corporation Counsel
Author:
Muriel Goode-Trufant, Corporation Counsel
Target Audience:
Property Owners, Legal Professionals, Public
Effective Period:
Not specified
Approval Date:
October 6, 2025
Modification Date:
Not specified
Note:
Year
Year:
2025
Region / City:
Texas
Topic:
Roadway construction, specifications, and contractor guidelines
Document type:
Technical specification
Organization / Institution:
Texas Department of Transportation (TxDOT)
Author:
Kevin
Target audience:
Contractors, Designers, Construction Managers
Effective period:
October 09, 2025
Approval date:
October 09, 2025
Modification date:
Not specified
Year:
2020
Region / City:
Oregon
Subject:
Roadway Engineering
Document Type:
Draft
Organization / Institution:
Oregon Department of Transportation
Author:
Unknown
Target Audience:
Engineering professionals
Period of validity:
Not specified
Approval Date:
3/30/2020
Modification Date:
Not specified
Context:
This document is a draft calculation book for roadway engineering design, outlining required and optional design standards and specifications for review.
Year:
2010
Region / City:
Georgia
Topic:
Environmental Protection, Roadway Drainage
Document Type:
Legal Guidance
Agency / Institution:
Georgia Environmental Protection Division (EPD), Georgia Department of Transportation (GDOT)
Author:
Jim Ussery, Bert Langley
Target Audience:
Government agencies, contractors, construction professionals
Effective Period:
2010-present
Approval Date:
September 20, 2010
Amendment Date:
June 8, 2006 (prior memorandum)
Legal Authority:
Georgia Erosion and Sedimentation Control Act, Georgia Water Quality Control Act, Clean Water Act
Permits:
NPDES Construction General Stormwater Permit (GAR100002)
Context:
Legal guidance document outlining the exemption of roadway drainage structure construction from stream buffer variance requirements in Georgia, with specific references to applicable regulations and previous memoranda.
Year:
2026
Region / City:
Various counties
Theme:
Roadway design, Right-of-Way, Drainage
Document Type:
Design and planning document
Organization / Institution:
Transportation Department
Author:
Unknown
Target Audience:
Transportation engineers, project managers, consultants
Period of Action:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Project Identification Numbers:
429341-3/5-52-01, 429341-2/4-52-01, 440176-2-52-01
Year:
2021
Region / City:
Miami-Dade County
Topic:
Roadway and Lighting Improvement
Document Type:
Project Notification
Agency:
Florida Department of Transportation (FDOT)
Author:
Stacy L. Miller, P.E., District Six Secretary
Target Audience:
Residents and interested parties in the project area
Duration:
Estimated to take one year
Approval Date:
September 13, 2021
Changes Date:
Not specified
Description:
Notification regarding a roadway and lighting improvement project in Miami-Dade County, including lane closures and construction schedules.
Year:
2011
Region / City:
Not specified
Topic:
Geogrid reinforcement for roadway embankments
Document Type:
Revision of Standard Specifications
Author:
Not specified
Target Audience:
Designers, Engineers
Effective Period:
Not specified
Approval Date:
02-03-11
Revision Date:
07-03-17
Changes:
Revision of Section 506 for geogrid reinforcement
Materials:
Polypropylene or high-density polyethylene geogrid
Measurement:
Square yard of surface area
Payment Basis:
Contract unit price per square yard
Document Type:
Project scope summary report template
Project Type:
Roadway rehabilitation
Subject:
Highway project development and approval documentation
Sections Included:
Introduction; Purpose and Need; Existing Facility and Traffic Data; Alternatives; Transportation Management; Environmental Compliance; Project Estimate
Technical Authority:
Registered Civil Engineer
Approval Authorities:
District Division Chief, Right of Way; District Division Chief, Planning; Project Manager; District Director
Referenced Standards:
Plans Preparation Manual Section 2-2.2; PDPM Chapter 8 Section 52
Project Elements:
Pavement work; Structures; Traffic data; ADA compliance; Bikeways; Stormwater compliance; Right-of-way and utilities
Milestones Referenced:
M015; M200 PA&ED
Program:
MnDOT Design-Build Program
Document Series:
Book 2
Section:
10
Project Identification:
Design-Build Project; Federal Project No. [insert #]; S.P. [insert #]
Subject:
Pavements and Roadway Materials
Document Type:
Technical specification section
Issuing Organization:
Minnesota Department of Transportation
Referenced Standards:
AASHTO Standards; ASTM International Standards; Federal Highway Administration Publications
Related Manuals:
MnDOT Pavement Design Manual; MnDOT Geotechnical Manual; MnDOT Standard Specifications for Construction; MnDOT Road Design Manual; MnDOT Concrete Manual; MnDOT Grading & Base Manual; MnDOT Laboratory Manual
Scope:
Requirements for investigations, materials, design, testing, documentation, and reporting for roadway pavements and materials
Geographic Context:
Minnesota, United States
Contractual Context:
Design-Build delivery method
Required Submittals:
Roadway Subsurface Investigation Plan; electronic roadway boring logs; laboratory test data; Materials Design Recommendation
Testing Requirements:
Atterberg limits; particle size distribution; R value; organic content; Proctor density
Digital Tools Referenced:
Trimble Pathfinder Office; Bentley Systems InSitu; GEOPAK Tech; Trimble ProXR
Year:
2019
Region / City:
Fannin County, Texas
Topic:
Roadway Design and Construction
Document Type:
Fact Sheet
Organization / Institution:
Upper Trinity Regional Water District (UTRWD)
Author:
Upper Trinity Regional Water District (UTRWD)
Target Audience:
Local government officials, contractors, engineers, public stakeholders
Effective Period:
2019-2020
Approval Date:
September 17, 2019
Amendment Date:
Not specified
Document type:
Environmental and Social Management Plan
Project name:
Upgrading of Manzese A and Manzese B to Modern Markets
Location:
Songea Municipality, Ruvuma Region, United Republic of Tanzania
Implementing authority:
Songea Municipal Council
Supervising institution:
President’s Office – Regional Administration and Local Government
Funding source:
World Bank credit under the Tanzania Cities Transforming Infrastructure and Competitiveness Project
Prepared by:
Songea Municipal Council in collaboration with NORPLAN Tanzania Ltd
Existing facilities:
Manzese A Market and Manzese B Market
Proposed works:
Construction of single-storey market buildings with supporting infrastructure including sewerage, stormwater drainage, circulation areas and walkways
Land ownership:
Songea Municipal Council
Land area:
Approximately 16,070 square meters
Resettlement and compensation:
Not expected
Applicable frameworks:
World Bank Environmental and Social Framework and Environmental and Social Standards 1–10
Relevant national legislation:
Environmental Management Act, Land Act, Urban Planning Act, Occupational Health and Safety Act, Public Health Act, and related sectoral laws
Stakeholder engagement:
Conducted in accordance with World Bank ESS10 and national EIA regulations
Year:
2024
Region / City:
Blantyre, Malawi
Theme:
Water and Sanitation
Document Type:
Environmental and Social Management Plan
Organization / Institution:
Blantyre Water Board
Author:
Blantyre Water Board
Target Audience:
Government Officials, Public Health Authorities, Local Communities
Period of Effect:
2024-2029
Approval Date:
February 2024
Date of Amendments:
N/A
Year:
2022
Country:
United Republic of Tanzania
City / Region:
Dar es Salaam, Lower Msimbazi Basin
Project:
Dar es Salaam Metropolitan Development Project
Subproject:
Lower Msimbazi Upgrading Project
Document type:
Draft Resettlement Action Plan and Livelihood Restoration Plan
Status:
Draft
Client:
President’s Office, Regional Administration and Local Government
Implementing authority:
Government of Tanzania
Tender number:
ME/022/2020/2021/HQ/C/09
Financing:
IDA Credit No. 5585-TZ
Consultants:
CDR International; NORPLAN Tanzania Ltd; DASUDA; Deltares
Authors:
D. Sungusia; B. Van de Sande
Revision:
V2.1
Document code:
B1903-06-R004
Preparation dates:
January–March 2022
Associated plans:
Msimbazi Opportunity Plan; Lower Msimbazi Upgrading Project Feasibility Study
Note:
Year
Subject:
Legal Profession
Document Type:
Application Form
Organization / Institution:
Institute of Legal Executives (Victoria)
Year:
2020
Region / city:
Uganda
Topic:
Labor Management Plan for Road Project
Document Type:
Management Plan
Organization / Institution:
Uganda National Roads Authority
Author:
World Bank
Target Audience:
Stakeholders involved in road construction, labor management, and refugee settlement programs
Period of validity:
Ongoing (as part of the project implementation)
Approval Date:
June, 2020
Date of Changes:
Not specified