№ files_lp_4_process_3_132614
File format: docx
Character count: 498
File size: 14 KB
Tabular clinical data detailing proton therapy beam parameters, including energy, gantry angles, monitor units, energy layers, and delivery times for multiple treatment cases.
Year:
2026
Institution:
Radiation Oncology Department
Document type:
Clinical Supplement
Subject:
Proton Therapy Beam Parameters
Audience:
Medical Physicists, Radiation Oncologists
Data included:
Maximum proton energy, gantry angle, monitor units, energy layers, beam delivery time
Number of cases:
5
Beam types:
Beam A / Beam B
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2014
Region / city:
N/A
Topic:
Beam commissioning, Silicon Detector, SVT
Document type:
Technical procedure
Organization / institution:
N/A
Author:
N/A
Target audience:
Researchers, engineers
Period of validity:
N/A
Approval date:
N/A
Date of changes:
N/A
Date:
7/14/25
Subject:
Fiber reinforced polymer composite strengthening of concrete members
Type of document:
Technical specification
Work category:
Bridge construction and rehabilitation
Materials referenced:
Carbon fiber reinforced polymer (CFRP), glass fiber reinforced polymer (GFRP), epoxy resin, protective coating
Standards referenced:
ASTM D3039, NCHRP Report 678
Professional requirements:
Shop drawings and calculations signed and sealed by a Missouri Professional Engineer
Contractor requirements:
Minimum 5 years documented experience or 25 similar applications; manufacturer certification required
Design applications:
Concrete beam shear strengthening, precast octagonal pile confinement, column confinement, seismic axial resistance
Construction requirements:
Surface preparation, moisture testing, FRP wrapping procedures, anchorage and overlap provisions
Service life requirement:
50 years for protective coating
Year:
1992
Region / city:
USA
Topic:
Wood ceiling systems
Document type:
Product specification
Manufacturer:
Maxxit
Author:
Maxxit
Target audience:
Architects, contractors, designers
Period of validity:
N/A
Approval date:
N/A
Revision date:
N/A
Year:
2026
Region / City:
Not specified
Subject:
HVAC Equipment
Document Type:
Technical Specification
Organization / Institution:
YORK® / Johnson Controls
Author:
Not specified
Target Audience:
Contractors, Mechanical Engineers, Installers
Applicable Period:
Project-specific installation phase
Approval Date:
Not specified
Amendment Date:
Not specified
Warranty:
12 months parts-only from shipment date
Standards Referenced:
ASHRAE Standard 200-2015, ARI Standard 410, BSRIA AG 2/93
Year:
2026
Region / City:
Belgium, Algeria, Taiwan
Subject:
Structural health monitoring, composite materials
Document Type:
Research article
Institution:
Ghent University; University of Sciences and Technology of Oran Mohamed Boudiaf; Yuan Ze University
Authors:
Muhammad Irfan Shirazi, Samir Khatir, Djilali Boutchicha, Magd Abdel Wahab
Target Audience:
Engineers, researchers in structural health monitoring
Methodology:
Finite Element modeling, vibration analysis, 1D-CNN classification
Key Materials:
Glass Fibre Reinforced Plastic (GFRP) beams
Data Type:
Raw vibrational responses
Validation:
Modal analysis
Accuracy Results:
92–95% for crack detection and classification
Corresponding Author:
Magd Abdel Wahab, [email protected]
Application Areas:
Aerospace, marine, oil and gas transport, civil structures
Year:
2026
Region / City:
Not specified
Subject:
Mechanical HVAC equipment
Document Type:
Technical specification
Organization / Institution:
York International / Manufacturer
Author:
Not specified
Target Audience:
Mechanical contractors and engineers
Period of Validity:
Upon installation
Approval Date:
Not specified
Modification Date:
Not specified
Material Requirements:
Free of asbestos, PCB, and other hazardous substances
Standards Compliance:
ARI Standard 410, EN Standard 14518
Warranty:
12 months parts-only from shipment date
Performance Parameters:
Maximum 10-foot head loss, maximum water velocity 4 FPS, minimum coil pressure 300 PSI, factory leak test 360 PSI
Installation Requirements:
Suspension and connection details, flushing of piping system, treatment of chilled water per BSRIA AG 2/93
Optional Features:
Integrated drain fittings, NPT threaded fittings, flexible connector hoses
Year:
2026
Region / City:
Not specified
Subject:
HVAC Equipment, Chilled Beams
Document Type:
Technical Specification
Organization / Institution:
Not specified
Author:
Not specified
Intended Audience:
Contractors, Engineers, Installation Technicians
Applicable Period:
During installation and initial operation
Standards Referenced:
ASHRAE Standard 200-2015, ARI Standard 410, BSRIA AG 2/93
Warranty:
12 months parts-only from shipment date
Materials Restrictions:
No asbestos, PCB, or other hazardous materials
Beam Model:
YORK® CB-ABV-YK series
Installation Method:
Suspended by threaded rods, connected to chilled water system via sweat or flexible hose connections
Performance Requirements:
Sensible and latent cooling capacities, airflow rates, noise levels, air and water pressure losses, maximum discharge air throw
Construction Details:
Minimum 20 gauge galvanized steel housing, vertical copper coil with aluminum fins, condensation tray, pressure taps, manual air vents
Year:
2016
Location:
San Diego, CA, USA
Subject:
Facility maintenance and asbestos abatement services
Document type:
Combined Synopsis/Solicitation Notice
Agency:
Department of Veterans Affairs
Contracting office:
Network Contracting Office 2248
Solicitation number:
VA262-16-Q-1393
Point of contact:
Jennelyn Peters, [email protected]
NAICS code:
562910
Set-aside:
Service Disabled Veteran Owned Small Business (SDVOSB)
Period of performance:
September 25, 2016 – September 24, 2017, with one-year option
Site visit date:
August 30, 2016
Submission deadline:
September 7, 2016
Description:
Preventive maintenance, cleaning of catwalks and beams, asbestos removal, inspection, repair, and ceiling tile replacement
End-user facility:
VA San Diego Healthcare System
Contract type:
Firm-fixed price, IDIQ, LPTA evaluation
Year:
2013
Region / City:
Cambridge, MA
Topic:
Energy Conversion, Catalysis
Document Type:
Research Paper
Organization / Institution:
Massachusetts Institute of Technology
Author:
Yogesh Surendranath
Target Audience:
Researchers, Academics
Period of Activity:
2013 - Present
Date of Approval:
N/A
Date of Changes:
N/A
Document type:
Supplementary tables and figures
Subject:
Proton therapy and VMAT treatment planning and dosimetric analysis
Techniques evaluated:
IMPT, VMAT
Clinical indications:
Base of skull tumors, paediatric craniopharyngioma, chordoma, chondrosarcoma
Structures analyzed:
Brain, Brainstem, Optic chiasm, Optic nerves, CTV
Dose metrics:
Mean dose, Maximum dose, EQD2, BED, LETd
Robustness parameters:
Isocenter shifts ±3.0 mm; Proton range uncertainty ±3.5%
Fractionation scheme:
1.67 Gy(RBE) fractions
Constraint source:
EPTN dose constraints
Number of patients:
6 adult cases
Comparative models:
Nominal IMPT, Worst case IMPT uncertainty, VMAT, McNamara variable RBE model (α/β)x = 2–4 Gy
Figures included:
Beam arrangement views, dose distributions, LETd maps, DVHs, robustness analysis
Year:
2025–2030
Region / City:
Marlborough, Worcester County, Massachusetts
Organization:
UMass Memorial Health (UMMH)
Facility:
Proton Therapy Center at Marlborough
Document Type:
Application Response / Capacity and Policy Explanation
Subject:
Proton Beam Unit Capacity and Coverage with Evidence Development (CED) Paradigm
Operational Hours:
14 hours per day, Monday through Friday
Days of Operation per Year:
250
Projected Daily Capacity:
30 treatments
Projected Monthly Capacity:
600 treatments
Projected Annual Capacity:
7,200 treatments
Average Treatment Time per Patient:
30 minutes (Year 1); 25 minutes (Years 2–3)
Estimated Annual Radiation Treatments:
4,320 (Year 1); 7,200 (Years 2–3)
Estimated Patient Volume (New Starts):
180 (Year 1); 300 (Years 2–3)
Average Treatments per Patient:
24
Total Estimated Treatment Minutes:
129,600 (Year 1); 180,000 (Years 2–3)
Policy Framework:
ASTRO Model Policy and Medicare Local Coverage Determination (LCD) L35075
Coverage Model:
Coverage with Evidence Development (CED)
Clinical Trial Participation:
Participation in IRB-approved clinical trials and multi-institutional registries; planned investigator-initiated trials
Payor Mix:
54.9% Medicare (projected)
Coverage Groups:
Group 1 (medically necessary indications); Group 2 (CED-qualified indications)
Year:
2025
Region / City:
Marlborough, Massachusetts
Subject:
Proton Therapy Expansion
Document Type:
Health Initiative Proposal
Organization:
UMass Memorial Health
Author:
UMass Memorial Health
Target Audience:
Healthcare professionals, policymakers, cancer patients, public health officials
Period of Action:
Ongoing
Approval Date:
N/A
Modification Date:
N/A
Year:
2026
Institution:
University of Shanghai for Science and Technology; Shanghai Institute of Optics and Fine Mechanics, Chinese Academy of Sciences; Shanghai Normal University; ShanghaiTech University
Authors:
Xiaojing Guo, Shuai Xu, Hui Zhang, Qingsong Wang, Shun Li, Dirui Xu, Lianghong Yu, Yi Xu, Cheng Wang, Xingyan Liu, Yanqi Liu, Xiaoyan Liang, Yuxin Leng, Baifei Shen, Liangliang Ji, Ruxin Li
Type of document:
Supplementary material
Subject:
Laser-driven proton acceleration; Femtosecond lasers; Plasma physics
Corresponding authors:
Hui Zhang, Baifei Shen, Liangliang Ji
Figures included:
Proton energy spectra, hydrodynamic simulation inputs, preplasma density distributions, simulated proton spectra
Data source:
RCF measurements, 1D hydrodynamic simulations
Experimental scale:
Nanosecond and picosecond prepulse simulations
Year:
2026
Region / City:
Boston, Massachusetts, USA
Subject:
Healthcare infrastructure, proton therapy
Document Type:
Public hearing transcript
Organization / Agency:
Massachusetts Department of Public Health, Bureau of Health Care Safety and Quality
Author:
Hearing Officer Teryl Smith, Lucy Clarke, various speakers
Intended Audience:
General public, healthcare stakeholders
Project Location:
35 Binney Street, Boston, Massachusetts
Project Scope:
Renovation, fit-out, and installation of proton therapy system including CT scanners and clinical support areas
Estimated Budget:
$50,500,663
Date of Hearing:
January 14, 2026
Filing Date of Application:
November 19, 2025
Regulatory Program:
Determination of Need (DoN)
Year:
FY24
Region / State:
Massachusetts
Topic:
Proton Beam Therapy; Patient Panel Need Assessment
Document Type:
Questionnaire / Data Request
Institution:
Massachusetts Department of Public Health
Program:
Determination of Need (DoN) Program
Submitting Authority:
DoN Staff
Contact Email:
[email protected]
Relevant Regulation:
HIPAA Compliance
Subject:
Patient Panel Eligibility and Diagnosis Counts
Medical Classification System:
ICD-10 Diagnosis Codes
Population Groups:
Adult; Pediatric
Data Format Requested:
Word; Excel; PDF (if necessary)
Required Attachment:
Exhibit A
Content Elements:
Diagnosis Codes; Diagnosis Descriptions; Patient Counts
Year:
2012
Region / city:
Geneva, Switzerland
Topic:
Particle physics, LHC, proton run
Document type:
Technical report
Organization / institution:
CERN
Author:
M. Giovannozzi
Target audience:
Particle physicists, accelerator specialists
Period of validity:
2012
Approval date:
2012
Modification date:
Not specified
Year:
2024
Region / City:
Not specified
Topic:
Postmortem MRI, Fetal MRI, Radiological Autopsy
Document Type:
Supplementary Material
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Researchers, Medical Professionals
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2023
Region / City:
Brussels
Topic:
Foreign subsidies in public procurement
Document Type:
Annex
Organization / Institution:
European Commission
Author:
European Commission
Target Audience:
Economic operators, groups of economic operators, public procurement participants
Period of validity:
N/A
Approval Date:
10 July 2023
Date of Changes:
N/A
Year:
2023
Region / City:
India
Topic:
Data Science, Artificial Intelligence, Official Statistics
Document Type:
Project Report
Organization:
National Statistical Office (NSO)
Author:
Not specified
Target Audience:
Government Agencies, Data Scientists, Researchers
Period of Validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2026
Region / city:
Rajasthan
Subject:
Education, Technical Education
Document Type:
Project Report
Organization:
Agrasen PG College, All India Agrasen Technical Education & Research Foundation
Author:
Not specified
Target Audience:
Educational planners, administrators, government bodies, potential investors, educational consultants
Period of validity:
Not specified
Approval Date:
Not specified
Date of amendments:
Not specified
Contextual description:
A detailed project report outlining the plans for establishing a new degree college under the guidance of the Agrasen PG College, focusing on academic infrastructure, industry linkages, and educational facilities.