№ files_lp_4_process_2_90109
File format: docx
Character count: 6132
File size: 27 KB
Solicitation notice detailing a federal procurement for maintenance and asbestos remediation services at a VA healthcare facility, including requirements, deadlines, evaluation criteria, and site visit instructions.
Year:
2016
Location:
San Diego, CA, USA
Subject:
Facility maintenance and asbestos abatement services
Document type:
Combined Synopsis/Solicitation Notice
Agency:
Department of Veterans Affairs
Contracting office:
Network Contracting Office 2248
Solicitation number:
VA262-16-Q-1393
Point of contact:
Jennelyn Peters, [email protected]
NAICS code:
562910
Set-aside:
Service Disabled Veteran Owned Small Business (SDVOSB)
Period of performance:
September 25, 2016 – September 24, 2017, with one-year option
Site visit date:
August 30, 2016
Submission deadline:
September 7, 2016
Description:
Preventive maintenance, cleaning of catwalks and beams, asbestos removal, inspection, repair, and ceiling tile replacement
End-user facility:
VA San Diego Healthcare System
Contract type:
Firm-fixed price, IDIQ, LPTA evaluation
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
FY26
Region / City:
Los Angeles, CA
Topic:
Event Planning, Facility Management
Document Type:
Checklist
Organization / Institution:
University of Southern California
Author:
FPM Events Office
Target Audience:
Event organizers, USC departments
Period of Validity:
FY26
Approval Date:
Not specified
Modification Date:
Not specified
Year:
Not specified
Region / City:
Not specified
Theme:
Payroll processing, Employee onboarding, Benefits administration
Document Type:
Internal procedure document
Organization / Institution:
FPM HR Team
Author:
Not specified
Target Audience:
FPM HR team, Supervisors
Effective Period:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
FY25
Region / City:
Los Angeles, CA
Theme:
Event Planning
Document Type:
Checklist
Organization:
FPM (Facilities Planning & Management)
Author:
FPM Events Team
Target Audience:
USC event coordinators and planners
Period of Validity:
FY25
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2024
Region / City:
Los Angeles, CA
Topic:
Event Planning
Document Type:
Checklist
Organization:
USC FPM (Facilities Planning and Management)
Author:
USC Facilities Planning and Management
Target Audience:
Event organizers, USC departments, and external vendors
Period of Validity:
FY24
Approval Date:
N/A
Date of Changes:
N/A
Year:
FY25
Region/City:
Los Angeles, CA
Subject:
Event Planning
Document Type:
Checklist
Organization/Institution:
FPM (Facilities Planning and Management)
Author:
FPM Events Office
Target Audience:
Event Organizers, USC Staff
Start Date:
FY25
Date of Approval:
Not specified
Date of Last Update:
Not specified
Year:
2025
Region / City:
Los Angeles, CA
Topic:
Event Planning and Management
Document Type:
Checklist
Organization / Institution:
University of Southern California (USC)
Author:
USC FPM Events Office
Target Audience:
Event Planners, USC Staff, and External Vendors
Effective Period:
Fiscal Year 2025
Approval Date:
Not provided
Amendment Date:
Not provided
Year:
FY24
Region / City:
Los Angeles, CA
Topic:
Event Planning, Services
Document Type:
Checklist
Organization / Institution:
FPM (Facilities Planning and Management)
Author:
FPM Events Office
Target Audience:
USC Event Organizers
Effective Period:
FY24
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2014
Region / city:
N/A
Topic:
Beam commissioning, Silicon Detector, SVT
Document type:
Technical procedure
Organization / institution:
N/A
Author:
N/A
Target audience:
Researchers, engineers
Period of validity:
N/A
Approval date:
N/A
Date of changes:
N/A
Date:
7/14/25
Subject:
Fiber reinforced polymer composite strengthening of concrete members
Type of document:
Technical specification
Work category:
Bridge construction and rehabilitation
Materials referenced:
Carbon fiber reinforced polymer (CFRP), glass fiber reinforced polymer (GFRP), epoxy resin, protective coating
Standards referenced:
ASTM D3039, NCHRP Report 678
Professional requirements:
Shop drawings and calculations signed and sealed by a Missouri Professional Engineer
Contractor requirements:
Minimum 5 years documented experience or 25 similar applications; manufacturer certification required
Design applications:
Concrete beam shear strengthening, precast octagonal pile confinement, column confinement, seismic axial resistance
Construction requirements:
Surface preparation, moisture testing, FRP wrapping procedures, anchorage and overlap provisions
Service life requirement:
50 years for protective coating
Year:
1992
Region / city:
USA
Topic:
Wood ceiling systems
Document type:
Product specification
Manufacturer:
Maxxit
Author:
Maxxit
Target audience:
Architects, contractors, designers
Period of validity:
N/A
Approval date:
N/A
Revision date:
N/A
Year:
2026
Region / City:
Not specified
Subject:
HVAC Equipment
Document Type:
Technical Specification
Organization / Institution:
YORK® / Johnson Controls
Author:
Not specified
Target Audience:
Contractors, Mechanical Engineers, Installers
Applicable Period:
Project-specific installation phase
Approval Date:
Not specified
Amendment Date:
Not specified
Warranty:
12 months parts-only from shipment date
Standards Referenced:
ASHRAE Standard 200-2015, ARI Standard 410, BSRIA AG 2/93
Year:
2026
Region / City:
Belgium, Algeria, Taiwan
Subject:
Structural health monitoring, composite materials
Document Type:
Research article
Institution:
Ghent University; University of Sciences and Technology of Oran Mohamed Boudiaf; Yuan Ze University
Authors:
Muhammad Irfan Shirazi, Samir Khatir, Djilali Boutchicha, Magd Abdel Wahab
Target Audience:
Engineers, researchers in structural health monitoring
Methodology:
Finite Element modeling, vibration analysis, 1D-CNN classification
Key Materials:
Glass Fibre Reinforced Plastic (GFRP) beams
Data Type:
Raw vibrational responses
Validation:
Modal analysis
Accuracy Results:
92–95% for crack detection and classification
Corresponding Author:
Magd Abdel Wahab, [email protected]
Application Areas:
Aerospace, marine, oil and gas transport, civil structures
Year:
2026
Region / City:
Not specified
Subject:
Mechanical HVAC equipment
Document Type:
Technical specification
Organization / Institution:
York International / Manufacturer
Author:
Not specified
Target Audience:
Mechanical contractors and engineers
Period of Validity:
Upon installation
Approval Date:
Not specified
Modification Date:
Not specified
Material Requirements:
Free of asbestos, PCB, and other hazardous substances
Standards Compliance:
ARI Standard 410, EN Standard 14518
Warranty:
12 months parts-only from shipment date
Performance Parameters:
Maximum 10-foot head loss, maximum water velocity 4 FPS, minimum coil pressure 300 PSI, factory leak test 360 PSI
Installation Requirements:
Suspension and connection details, flushing of piping system, treatment of chilled water per BSRIA AG 2/93
Optional Features:
Integrated drain fittings, NPT threaded fittings, flexible connector hoses
Year:
2026
Region / City:
Not specified
Subject:
HVAC Equipment, Chilled Beams
Document Type:
Technical Specification
Organization / Institution:
Not specified
Author:
Not specified
Intended Audience:
Contractors, Engineers, Installation Technicians
Applicable Period:
During installation and initial operation
Standards Referenced:
ASHRAE Standard 200-2015, ARI Standard 410, BSRIA AG 2/93
Warranty:
12 months parts-only from shipment date
Materials Restrictions:
No asbestos, PCB, or other hazardous materials
Beam Model:
YORK® CB-ABV-YK series
Installation Method:
Suspended by threaded rods, connected to chilled water system via sweat or flexible hose connections
Performance Requirements:
Sensible and latent cooling capacities, airflow rates, noise levels, air and water pressure losses, maximum discharge air throw
Construction Details:
Minimum 20 gauge galvanized steel housing, vertical copper coil with aluminum fins, condensation tray, pressure taps, manual air vents
Year:
2026
Institution:
Radiation Oncology Department
Document type:
Clinical Supplement
Subject:
Proton Therapy Beam Parameters
Audience:
Medical Physicists, Radiation Oncologists
Data included:
Maximum proton energy, gantry angle, monitor units, energy layers, beam delivery time
Number of cases:
5
Beam types:
Beam A / Beam B