№ lp_1_2_41006
File format: docx
Character count: 174064
File size: 5081 KB
Year:
2023
Region / city:
Sizewell C, Suffolk
Theme:
External hazards, nuclear site licensing
Document Type:
Assessment Report
Organization / institution:
Office for Nuclear Regulation (ONR)
Author:
NNB Generation Company (SZC) Ltd
Target audience:
Regulatory bodies, nuclear safety professionals
Period of validity:
Ongoing
Approval date:
26/05/2022
Date of changes:
24/03/2023
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2023
Region:
Suffolk, Great Britain
Site:
Sizewell C
Project:
Sizewell C new build project ONR strategy up to licence grant
Document type:
Assessment report
Assessment area:
Conventional Health and Safety and Life Fire Safety
Organisation:
Office for Nuclear Regulation
Prospective licensee:
NNB Generation Company (SZC) Ltd
Nuclear facility type:
Nuclear power station with two UK EPR™ reactors
Regulatory framework:
Health and Safety at Work etc Act 1974; Construction (Design and Management) Regulations 2015; Regulatory Reform (Fire Safety) Order 2005
Licence condition:
LC19 – Construction or installation of new plant
Issue number:
1
Report reference:
ONR-NR-AR-22-007
Record reference:
2022/24235
Assessment rating:
Green
Project phase:
Pre-construction
Assessment basis:
Intelligent replication from Hinkley Point C
Regulatory decision context:
Nuclear Site Licence grant consideration
Year:
2022
Region / city:
Sizewell C
Topic:
Nuclear Site Licence Application Assessment
Document Type:
Assessment Report
Organisation / Institution:
Office for Nuclear Regulation (ONR)
Author:
N/A
Target Audience:
N/A
Period of Validity:
N/A
Approval Date:
27 June 2022
Revision Date:
26 April 2023
Year:
2023
Region / city:
Sizewell C
Topic:
Electrical engineering assessment for nuclear site licence application
Document Type:
Assessment Report
Organization / Institution:
Office for Nuclear Regulation (ONR)
Author:
N/A
Target Audience:
N/A
Period of validity:
N/A
Approval Date:
31 January 2023
Date of amendments:
N/A
Year:
2023
Region / city:
Sizewell C
Subject:
Nuclear site licence application, legal and security of tenure assessment
Document Type:
Assessment Report
Organization / institution:
Office for Nuclear Regulation (ONR)
Author:
Office for Nuclear Regulation (ONR)
Target Audience:
Regulatory bodies, nuclear industry professionals, legal experts
Period of validity:
N/A
Approval date:
26 April 2023
Modification date:
N/A
Year:
2023
Region / City:
Sizewell C
Topic:
Nuclear site security
Document Type:
Assessment note
Organ / Institution:
Office for Nuclear Regulation (ONR)
Author:
NNB GenCo (SZC)
Target Audience:
Regulatory bodies, Nuclear industry professionals
Approval Date:
Expected by mid-May 2022
Revision Date:
April 2023
Year:
2023
Region:
Suffolk, Great Britain
Site:
Sizewell C
Project:
Sizewell C new build project ONR strategy up to licence grant
Document type:
Assessment report
Assessment area:
Conventional Health and Safety and Life Fire Safety
Organisation:
Office for Nuclear Regulation
Prospective licensee:
NNB Generation Company (SZC) Ltd
Nuclear facility type:
Nuclear power station with two UK EPR™ reactors
Regulatory framework:
Health and Safety at Work etc Act 1974; Construction (Design and Management) Regulations 2015; Regulatory Reform (Fire Safety) Order 2005
Licence condition:
LC19 – Construction or installation of new plant
Issue number:
1
Report reference:
ONR-NR-AR-22-007
Record reference:
2022/24235
Assessment rating:
Green
Project phase:
Pre-construction
Assessment basis:
Intelligent replication from Hinkley Point C
Regulatory decision context:
Nuclear Site Licence grant consideration
Year:
2022
Region / city:
Sizewell C
Topic:
Nuclear Site Licence Application Assessment
Document Type:
Assessment Report
Organisation / Institution:
Office for Nuclear Regulation (ONR)
Author:
N/A
Target Audience:
N/A
Period of Validity:
N/A
Approval Date:
27 June 2022
Revision Date:
26 April 2023
Year:
2023
Region / city:
Sizewell C
Topic:
Electrical engineering assessment for nuclear site licence application
Document Type:
Assessment Report
Organization / Institution:
Office for Nuclear Regulation (ONR)
Author:
N/A
Target Audience:
N/A
Period of validity:
N/A
Approval Date:
31 January 2023
Date of amendments:
N/A
Year:
2023
Region / city:
Sizewell C
Subject:
Nuclear site licence application, legal and security of tenure assessment
Document Type:
Assessment Report
Organization / institution:
Office for Nuclear Regulation (ONR)
Author:
Office for Nuclear Regulation (ONR)
Target Audience:
Regulatory bodies, nuclear industry professionals, legal experts
Period of validity:
N/A
Approval date:
26 April 2023
Modification date:
N/A
Year:
2023
Region / City:
Sizewell C
Topic:
Nuclear site security
Document Type:
Assessment note
Organ / Institution:
Office for Nuclear Regulation (ONR)
Author:
NNB GenCo (SZC)
Target Audience:
Regulatory bodies, Nuclear industry professionals
Approval Date:
Expected by mid-May 2022
Revision Date:
April 2023
Year:
2005
Region / City:
Caribbean and Adjacent Regions
Theme:
Tsunami Warning System, Coastal Hazards
Document Type:
Organizational Structure
Organization:
Intergovernmental Oceanographic Commission (IOC)
Author:
ICG/CARIBE-EWS
Target Audience:
Member States, Regional Stakeholders
Period of Effect:
Ongoing
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2024
Jurisdiction:
California, USA
Document type:
Model Program / Guidelines
Authority:
California Division of Occupational Safety and Health (Cal/OSHA)
Regulation reference:
California Code of Regulations, title 8, section 5199.1(a)(2)(A)
Scope:
Employers with occupational exposure to zoonotic aerosol transmissible pathogens
Target audience:
Employers and occupational safety personnel
Publication date:
July 2024
Copyright holder:
State of California, Department of Industrial Relations
Professional Lead:
Civil Engineering and External Hazards (CEEH)
Authored by:
Principal Inspector
Approved by:
PL – CEEH
Issue No.:
1.2
Publication Date:
Nov-21
Next Major Review Date:
Apr-25
Doc. Ref. No.:
NS-TAST-GD-013 – Annex 1
Record Ref. No.:
2018/315700
Type:
Guidance Document
Scope:
Nuclear licensed and authorised sites in the UK
Topics:
Seismic hazards, earthquake assessment, nuclear safety, emergency planning, soil-structure interaction, historical development of seismic hazard analysis
Year:
2022
Region / city:
United Kingdom
Topic:
Nuclear safety, internal hazards
Document type:
Technical Assessment Guide
Organization / institution:
Office for Nuclear Regulation (ONR)
Author:
Nuclear Safety Inspector
Target audience:
ONR inspectors
Period of validity:
2022 - 2026
Approval date:
December 2022
Date of revisions:
October 2026
Year:
2023
Region / city:
Heredia, Costa Rica
Topic:
Tsunami and coastal hazards warning system
Document Type:
Annotated Agenda
Institution / Organization:
Intergovernmental Coordination Group for the Tsunami and Other Coastal Hazards Warning System for the Caribbean and Adjacent Regions (ICG/CARIBE EWS)
Author:
Dr Silvia Chacón Barrantes, Chair
Target audience:
Delegates of ICG/CARIBE EWS and other national authorities
Period of validity:
25-28 April 2023
Approval date:
N/A
Date of amendments:
N/A
Year:
N/A
Region / city:
N/A
Topic:
Explosive and flammable hazards in HUD-assisted projects
Document type:
Legislation
Author:
N/A
Target audience:
Project developers, environmental reviewers
Period of validity:
N/A
Approval date:
N/A
Date of changes:
N/A
Year:
2021
Region / City:
Caribbean
Topic:
Tsunami and Coastal Hazards Warning System
Document Type:
Annotated Agenda
Organization:
Intergovernmental Oceanographic Commission (IOC)
Author:
Dr. Silvia Chacón Barrantes
Target Audience:
Delegates of the ICG/CARIBE EWS
Period of Effect:
27-29 April 2021
Date of Approval:
April 2021
Date of Modifications:
None
Year:
2024
Region / City:
United Kingdom
Topic:
Internal Hazards, Safety Case, Regulatory Assessment
Document Type:
Regulatory Observation
Organization / Institution:
Office for Nuclear Regulation (ONR)
Author:
Office for Nuclear Regulation (ONR)
Target Audience:
Regulatory Authorities, Nuclear Industry Stakeholders
Effective Period:
2024-2025
Approval Date:
04/12/2024
Modification Date:
05/02/2025
Year:
2025
Organization:
Rolls-Royce SMR Limited
Document type:
Resolution Plan
Related Regulatory Observation:
RO-RRSMR-005
Technical topics:
Internal Hazards, Civil Engineering, Life Fire Safety, Conventional Health and Safety, Mechanical Engineering, Electrical Engineering, Fault Studies
GDA step:
Step 3
Scope:
Internal Hazards Safety Case, design maturity, regulatory compliance
Intended audience:
Office of Nuclear Regulation (ONR)
Reference documents:
Interim Hazards Schedule and Requirements for Design Reference Point 2, Internal Hazards Design Maturity Justification Document, Generic E3S Case Scope and Deliverable Document – Internal Hazards
Year:
2025
Region / City:
Caribbean and Adjacent Regions
Theme:
Tsunami and Coastal Hazards
Document Type:
Executive Summary
Organization / Institution:
UNESCO-IOC
Author:
Intergovernmental Coordination Group for the Tsunami and other Coastal Hazards Warning System for the Caribbean and Adjacent Regions
Target Audience:
Member States, Observers, and disaster risk management stakeholders
Period of Effect:
May 2025
Approval Date:
Not specified
Date of Changes:
Not specified
Contextual Description:
Executive summary of the online session of the Intergovernmental Coordination Group for the Tsunami and Other Coastal Hazards Warning System held in May 2025, reporting on various updates and decisions regarding regional tsunami risk management and preparedness efforts.