№ files_lp_4_process_3_128209
Year: 2026
Region / City: Goa, India
Topic: Network Capacity Optimization
Document Type: Technical Report
Organ / Institution: 3GPP
Author: Nokia
Target Audience: 3GPP members, network operators
Effective Period: 09 – 15 February 2026
Approval Date: Not specified
Date of Changes: Not specified
Work Item: Closed Control Loop Management phase 2
Spec: 3GPP TR28.889
Version: 0.2.0
Agenda Item: 6.20.10
Comments: This document proposes changes to network capacity optimization through CCL for energy saving control.
Context Description: Technical report providing details on proposed changes for network capacity optimization in RAN through Closed Control Loop (CCL) technology, aimed at automating network management.
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.