№ lp_1_2_17218
File format: docx
Character count: 16004
File size: 343 KB
The document provides a proposal for separating ASN.1 code from RRC procedure definitions to streamline development and improve code manageability within the 6G specifications.
Year:
2026
Region / City:
Global
Subject:
6G, ASN.1, RAN2, Radio Resource Control (RRC), Protocol Definitions
Document Type:
Proposal
Organization / Institution:
3GPP
Author:
Nokia, Ericsson
Target Audience:
Industry experts, developers, and engineers working on 6G and ASN.1 implementations
Validity Period:
N/A
Approval Date:
15th January 2026
Modification Date:
N/A
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2026
Region / City:
Gothenburg, Sweden
Topic:
ASN.1 Structure, 6G
Document Type:
Discussion Document
Organization / Institution:
3GPP TSG-RAN WG2
Author:
Ericsson
Target Audience:
Companies participating in 6G ASN.1 structure discussion
Period of Validity:
Until January 23rd, 2026
Approval Date:
N/A
Modification Date:
N/A
Year:
2020
Region / City:
Electronic, 1 - 12 June 2020
Topic:
NR ASN1
Document Type:
Summary
Organization / Institution:
Huawei, HiSilicon
Author:
Huawei, HiSilicon
Target Audience:
Technical experts in 3GPP
Period of Validity:
N/A
Approval Date:
N/A
Modification Date:
N/A
Note:
Context
Year:
2020
Region / city:
Online
Topic:
RRC open issues for power saving
Document type:
Discussion document
Organization / institution:
MediaTek Inc.
Author:
MediaTek Inc.
Target audience:
RAN2 participants and other stakeholders involved in NR and LTE RRC CRs
Period of validity:
Until next meeting
Approval date:
Not specified
Date of amendments:
Not specified
Year:
2020
Region / City:
Online
Topic:
ASN.1 review of NB-IoT
Document Type:
Draft
Organization / Institution:
Huawei
Author:
Huawei (rapporteur)
Intended Audience:
RAN WG2 participants
Period of Validity:
Until 27-04-2020
Approval Date:
Not specified
Date of Modifications:
Not specified
Year:
2020
Location:
Online
Subject:
NB-IoT and eMTC ASN.1 specifications review
Document type:
Meeting report / draft
Organization:
3GPP TSG-RAN WG2
Author:
Huawei (rapporteur)
Participants:
Qualcomm, Ericsson, other WG2 members
Agenda item:
7.2.6
WID:
NB_IOTenh3-Core, LTE_eMTC5-Core
Purpose:
Discussion and decision on ASN.1 RIL class 3 and 4 issues
Status:
Not started
Deadline:
June 5, 2020, 10:00 UTC
Sections:
Introduction, RIL issues not for discussion unless flagged, PUR related issues, Timing alignment validation
Year:
2020
Region / city:
Online
Topic:
5G, RIL, ASN.1, NB-IoT, eMTC
Document type:
Draft
Organization / institution:
Huawei
Author:
Huawei
Target audience:
Technical experts, industry stakeholders
Period of validity:
June 1-12, 2020
Approval date:
N/A
Date of changes:
N/A
Year:
2026
Region / City:
Goa, India
Topic:
Structuring of ASN.1
Document Type:
Technical Report
Organization:
3GPP
Author:
Ericsson
Target Audience:
Stakeholders in 6G charging mechanisms
Period of Validity:
February 9-13, 2026
Approval Date:
Pending
Changes Date:
February 2026
Work Item:
FS_6G_CH
Agenda Item:
7.6.1
Specification:
3GPP TR 32.801-02
Version:
0.2.0
Comments:
Addition of solution for structuring ASN.1
Context:
Technical document on the structuring of ASN.1 for 6G services charging mechanisms.
Year:
2026
Region / City:
N/A
Theme:
Power monitoring, System migration
Document type:
Technical guide
Organization:
Schneider Electric
Author:
N/A
Target audience:
System administrators, IT professionals
Action period:
N/A
Approval date:
N/A
Modification date:
N/A
Year:
2022-2023
Region / City:
[Insert relevant location details]
Subject:
Bushfire Preparedness and Emergency Response Plan
Document Type:
Emergency Response Plan
Author:
[Insert Principal’s Name]
Target Audience:
School staff, students, contractors, visitors
Effective Period:
Annual, before bushfire season
Approval Date:
[Insert Date]
Date of Changes:
[Insert Date, if applicable]
Year:
2024
Note:
Region / city
Subject:
Audit report
Document Type:
Audit Report
Organ / Institution:
ABC Company Private Limited
Target Audience:
Stakeholders of ABC Company Private Limited, including shareholders and auditors
Effective Period:
Year ending March 31, 2024
Year:
2023
Region / City:
Ohio
Theme:
Environmental Protection, Waste Management
Document Type:
Application Form
Organization / Institution:
Ohio Environmental Protection Agency (Ohio EPA)
Author:
Ohio Environmental Protection Agency
Target Audience:
Construction and Demolition Debris Processing Facility Operators, Permitting Authorities
Period of Action:
Ongoing
Approval Date:
N/A
Amendment Date:
N/A
Note:
Year
Topic:
Construction & Demolition Debris (C&DD) Processing
Document Type:
Form
Authority:
Ohio EPA
Author:
Ohio EPA
Target Audience:
Certified Operators, Processing Facility Personnel
Valid Period:
Annual
Year:
January 2017
Region / city:
N/A
Topic:
PCI DSS, Security Standards, Self-Assessment Questionnaire
Document type:
Self-Assessment Questionnaire
Organization / Institution:
PCI Security Standards Council
Author:
N/A
Target audience:
Merchants using standalone, PTS-approved point-of-interaction devices with an IP connection
Period of validity:
N/A
Approval date:
N/A
Date of amendments:
N/A
Note:
Year
Year:
2026
Institution:
University of [Name Redacted]
Module Type:
Standalone module
Prepared by:
Module Lead with module team
Audience:
Faculty Board, Senior Marketing Managers, Faculty Finance Manager
Review Period:
Academic year 2025–2026
Evaluation Areas:
Module performance, external requirements, marketing, resources, student experience, teaching, learning and assessment, employability, quality assurance
Sources of Evidence:
Module reports, external examiner reports, staff and student feedback, PSRB reports, statistical data, career practitioner input
Recommendations:
For consideration by Faculty Board regarding staffing, facilities, resources, and module adjustments
Year:
2026
Region / City:
United States
Subject:
Accessible prescription instructions for visually impaired users
Document Type:
Product information / User guide excerpt
Organization:
Hadley Institute for the Blind and Visually Impaired; CVS Pharmacy
Author:
Hadley Education Team
Target Audience:
Individuals with vision loss or low vision
Availability:
Free of charge through CVS Pharmacy
Instructions:
Enrollment required at CVS Pharmacy; tactile buttons provided
Contact:
800-323-4238
Related Workshop:
Getting Started workshop
Description:
User guide excerpt detailing the Spoken Rx Standalone Reader service, including enrollment, usage instructions, and access to Hadley resources for individuals with vision loss.
Year:
2020
Region / city:
Wales, United Kingdom
Topic:
Emissions Monitoring
Document type:
Compliance Assessment Report
Organization / Institution:
Natural Resources Wales
Author:
Geraint Harris
Target audience:
Operators, Regulatory Authorities
Period of validity:
Not specified
Approval date:
22/01/2020
Amendment date:
Not specified
Year:
2026
Region / City:
Chidambaram, Tamil Nadu, India
Subject:
Photovoltaic energy systems, intelligent control, battery management
Document Type:
Research paper
Institution:
Annamalai University, Department of EEE
Authors:
K. Vinoth Bresnav, Dr. S. Singaravelu
Target Audience:
Electrical engineering researchers and practitioners
Methodology:
ANN-based MPPT, bi-directional DC-DC converter, three-level NPC inverter, PI control
Simulation Environment:
MATLAB/Simulink
Key Components:
Standalone PV system, lithium-ion battery, DC link, three-phase AC load
Applications:
Off-grid renewable energy systems, dynamic load management
Performance Metrics:
MPPT efficiency, battery management effectiveness, AC output stability
Keywords:
ANN, MPPT, PV system, Bi-Directional Converter, NPC Inverter, DC Link, PI Controller
Year:
2026
Region / City:
Global
Topic:
3GPP Specifications
Document Type:
Technical Report
Organization:
3GPP
Author:
Huawei
Target Audience:
Technical professionals involved in 3GPP specifications
Period of validity:
N/A
Approval Date:
15th January 2026
Change Date:
N/A