№ files_lp_4_process_2_83291
File format: docx
Character count: 2498
File size: 27 KB
Year:
2026
Region / city:
India
Topic:
Internet of Things, Electrical Substations, Smart Grids
Document Type:
Original Research Article
Institution:
Basaveshwar Engineering College
Author:
K. Nagarathna
Target Audience:
Researchers, Engineers in Electrical Engineering, IoT Enthusiasts
Period of Validity:
Ongoing
Date of Approval:
2026
Date of Modifications:
Not specified
Ethical Issues:
None
References:
The references are not fully up-to-date with recent works in IoT-based substation automation.
Language Quality:
High-level scholarly communication
Context:
The document presents a detailed experimental framework for implementing an IoT-based monitoring and control system in electrical substations, focusing on real-world applications in smart grids.
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2008
Region / City:
Harbor Ridge
Theme:
Homeowners Association Meeting
Document Type:
Meeting Minutes
Organization / Institution:
Home Owners Association
Author:
Catherine Bixler (acting Secretary)
Target Audience:
Homeowners in Harbor Ridge
Period of Validity:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Context:
Record of the annual meeting of the Harbor Ridge Homeowners Association, outlining updates, financial reports, and nominations.
Year:
2025
Region / City:
Soldotna, Alaska
Topic:
Transmission Line Upgrade Project
Document Type:
Legal Notice
Agency:
U.S. Fish and Wildlife Service, U.S. Forest Service
Responsible Official:
Karlin Itchoak, Jennifer K. Youngblood
Target Audience:
Public, Interested Stakeholders
Action Period:
June 23 – July 23, 2025
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2025
Region / City:
UK Power Networks
Subject:
Access to network plans and diagrams for Independent Connection Providers and Independent Distribution Network Operators
Document type:
Process document
Organization / Institution:
UK Power Networks
Author:
Aoife Hanley, Emma Kemp
Target audience:
ICPs, IDNOs, UK Power Networks staff
Period of validity:
From 26/10/2022 to 11/10/2025
Approval date:
11 November 2025
Date of changes:
14 November 2025
Year:
2026
Region / City:
Not specified
Topic:
Substation commissioning and testing
Document Type:
Technical form
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Technicians and engineers involved in substation commissioning
Period of validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
[Insert Year]
Region / City:
[Insert Location]
Theme:
Sabotage Incident
Document Type:
Exercise Manual
Organization:
Cybersecurity and Infrastructure Security Agency (CISA)
Author:
[Insert Author Name]
Target Audience:
Exercise Participants
Period of Validity:
[Insert Exercise Date Range]
Approval Date:
[Insert Date]
Date of Revisions:
[Insert Date]
Year:
2015
Region / City:
N/A
Theme:
Electrical standards, Substation equipment
Document type:
Technical standards
Organization / Institution:
National Grid
Author:
N/A
Target audience:
Engineers, technical specialists
Period of validity:
N/A
Approval date:
22nd Jan 2015
Date of modifications:
N/A
Procurement Reference Number:
ZETDC/DP/05/2024
Year:
2024
Region / City:
Bindura, Mutoko
Subject:
Detailed design, supply, construction, and commissioning of 132kV power line and substations
Document Type:
Standard Bidding Document
Organization / Institution:
Zimbabwe Electricity Transmission & Distribution Company
Author:
ZETDC
Target Audience:
Contractors and suppliers in electrical infrastructure
Effective Period:
October 2024 - October 2024
Approval Date:
03 October 2024
Modification Date:
N/A
Year:
2025
Region / City:
California
Topic:
Energy, Clean Energy, Microgrids, Utility Contracts
Document Type:
Resolution
Organization:
Public Utilities Commission of the State of California
Author:
Pacific Gas and Electric Company
Target Audience:
Energy professionals, regulators, stakeholders in energy resilience
Period of Validity:
June 1, 2025 – September 1, 2025
Approval Date:
July 24, 2025
Date of Changes:
April 1, 2025
Project Reference:
Not specified
Post Code:
Not specified
Name of IDNO:
Not specified
Name of ICP:
Not specified
Name of Connection:
Not specified
Document Type:
Technical connection agreement and schedules
Supply Duration:
Maximum of two years
Voltage of Delivery:
6600/11000 volts
Maximum Import Capacity:
0 kVA
Maximum Export Capacity:
0 kVA
Type of Connection:
Alternative switched connection; Single circuit connection
Feeding Substation:
Primary substation (name not specified)
Feeder Name:
Not specified
Isolation Point:
Outgoing connections to the transformer from the Schneider Electric RMU in NEW SUB NAME substation
Protective Device at Connection Point:
Circuit Breaker with TLF fuse protection
C.T. Ratio:
100/5
TLF Size:
10 amps
Connection Point Substation Name:
NEW SUB NAME
Connection Point Substation Number:
NEW SUB NUMBER
Ownership During Temporary Period:
ENW Ltd responsible for HV cables and RMU
Ownership After Decommissioning:
Energetics Ltd
Generation:
No generation
Land Rights:
Rights within developer boundary acquired by IDNO; external footpath and carriageway adopted by local authority
Certificate of Test and Inspection:
Test Certificates held by named ICP
Year:
2026
Region / City:
New York
Topic:
Energy infrastructure upgrades
Document type:
Cost estimation report
Organization:
National Grid
Author:
National Grid
Target audience:
Energy industry professionals, project managers
Period of validity:
2026
Approval date:
2026
Modification date:
N/A
Year:
2024
Region / City:
South Africa
Topic:
Engineering, Procurement and Construction
Document Type:
Tender/Enquiry
Organization:
Eskom
Author:
Basil Zuma
Target Audience:
Suppliers and Bidders
Period of Validity:
2024-09-30
Approval Date:
2024-10-10
Modification Date:
N/A
Year:
2026
Region / City:
Chehalis, Pacific Northwest, USA
Topic:
Environmental Site Assessment / Contamination Monitoring
Document Type:
Memorandum
Organization / Institution:
Bonneville Power Administration (BPA)
Author:
Tyga Howe
Target Audience:
Internal file recipients
Site ID:
FSID 64648972, CSID 10019, UST 2856
Contamination Type:
Petroleum-contaminated soil, Benzene, Lead, VOCs
Monitoring Period:
1995–2025
Historical Actions:
UST closure and soil excavation in 1991–1992, groundwater monitoring initiated 1995–2002
Last Detection of Contaminants:
2014 (Benzene 14.1 μg/L)
Cleanup Status:
All analytes below regulatory cleanup levels since 2015
Next Steps:
Add files to ISIS, draft NFA, consider SHARP if mandated
Year:
2023
Region/City:
Paraparaumu
Topic:
Oil Spill Management
Document Type:
Contingency Plan
Organization:
Transpower New Zealand Limited
Author:
Transpower Contractors
Target Audience:
Transpower contractors, subcontractors, and approved employees
Period of Validity:
Ongoing
Approval Date:
N/A
Amendment Date:
N/A
Year:
2026
Region / City:
Waikato
Document Type:
Compliance Schedule Form
Organization / Authority:
Waikato District Council
Intended Audience:
Building consent applicants and IQPs
System Type:
Automatic Doors (sliding and revolving)
Standards Referenced:
NZS 4239:1993, AS 4085:1992, AS 5007:2007, AS 4290:2000
Inspections Frequency:
Daily, Monthly, Annually
Maintenance Requirements:
Belt/chain tension adjustment, brake settings, wheel maintenance, battery recharge
Reporting Requirements:
On-Site Logbook and annual Form 12A submission
Note:
Year
Region / City:
Ontario
Subject:
Family Law
Document Type:
Court Order
Authority / Institution:
Ontario Court
Target Audience:
Legal parties involved in family law cases
Registered Entity:
Registered name of entity being audited
NCR Number:
NCRnnnnn
Compliance Enforcement Authority:
Region or NERC performing audit
Compliance Assessment Date(s):
Month DD, YYYY, to Month DD, YYYY
Compliance Monitoring Method:
[On-site Audit | Off-site Audit | Spot Check]
Names of Auditors:
Supplied by CEA
Applicability of Requirements:
BA, DP, GO, GOP, PA/PC, RC, RP, RSG, TO, TOP, TP, TSP
Requirements Covered:
D.B.1, D.B.2, D.B.3, D.B.4, R6, R7, R8, R9, R10, D.B.11, D.B.12
UFLS Entities Definition:
Distribution Providers, UFLS-Only Distribution Providers, Transmission Owners, and Transmission Owners that own Elements identified in the UFLS program
Supporting Evidence:
Compliance narratives, reports, memorandums, emails, and other documentation demonstrating compliance with PRC-006-5 requirements
Subject Matter Experts:
SME Name, Title, Organization, Requirement(s)
Compliance Assessment Approach:
Verification of joint regional review participation, island identification, and UFLS program adoption within Western Interconnection
Time Horizon:
Long-term Planning
VRF Level:
Medium
Year:
2024
Region / City:
Utrecht
Topic:
Literary translation, machine translation, translation quality assessment
Document Type:
Thesis
Organization / Institution:
Universiteit Utrecht
Author:
Lola van Scharrenburg
Target Audience:
Academic community, translation professionals
Period of Validity:
N/A
Date of Approval:
May 2024
Date of Changes:
N/A
Year:
2026
Region / City:
Longview, TX
Subject:
Utility Billing, Automatic Bank Draft
Document Type:
Agreement
Organization / Institution:
City of Longview Utility Billing Services
Author:
City of Longview
Target Audience:
Utility customers in Longview
Effective Period:
Ongoing
Approval Date:
Not specified
Amendment Date:
Not specified
Context:
A form that allows residents of Longview, TX to sign up for automatic bank draft payments for utility services, with detailed instructions for completing and submitting the agreement.
Year:
2011
Region / City:
Not specified
Topic:
Automatic planning of kanban jobs
Document type:
Concept Paper
Organization / Institution:
Microsoft
Author:
Not specified
Target audience:
Users of Microsoft Dynamics AX 2012
Period of validity:
Not specified
Approval date:
Not specified
Modification date:
Not specified
Note:
Contextual description