№ files_lp_4_process_1_42381
File format: docx
Character count: 2048
File size: 20 KB
Internal memorandum detailing site contamination history, groundwater monitoring data, and remediation status of the Bonneville Power Chehalis Substation.
Year:
2026
Region / City:
Chehalis, Pacific Northwest, USA
Topic:
Environmental Site Assessment / Contamination Monitoring
Document Type:
Memorandum
Organization / Institution:
Bonneville Power Administration (BPA)
Author:
Tyga Howe
Target Audience:
Internal file recipients
Site ID:
FSID 64648972, CSID 10019, UST 2856
Contamination Type:
Petroleum-contaminated soil, Benzene, Lead, VOCs
Monitoring Period:
1995–2025
Historical Actions:
UST closure and soil excavation in 1991–1992, groundwater monitoring initiated 1995–2002
Last Detection of Contaminants:
2014 (Benzene 14.1 μg/L)
Cleanup Status:
All analytes below regulatory cleanup levels since 2015
Next Steps:
Add files to ISIS, draft NFA, consider SHARP if mandated
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2024
Location:
Chehalis, WA
Document Type:
Meeting Minutes
Organization:
Chehalis River Basin Flood Control Zone District
Author:
Tammy Martin, Interim Clerk
Target Audience:
District Supervisors, Project Administrators, Local Officials
Approval Date:
June 18, 2024
Resolution Numbers:
24-007, 24-008
Topics:
Procedural Approvals, Project Updates, Personnel Changes, Financial Approvals
Relevant Grants:
17-1373, 23-1811, 23-1794, 23-1781
Project Updates:
Revised Project, SEPA, EIS Draft
Jurisdiction:
Bonneville County, Idaho
Region:
Unincorporated territory of Bonneville County
Country:
United States
Chapter:
33
Subject:
Subdivision Regulations
Document Type:
County Zoning Ordinance
Governing Bodies:
County Planning and Zoning Commission; Board of County Commissioners
Administrative Authority:
Zoning Administrator; Public Works Department
Scope:
Regulation of subdivision and re-subdivision of land
Approval Process:
Preliminary Plat and Final Plat review and approval
Exclusions:
Legal condemnation sales; street acquisition or widening; boundary line adjustments not creating additional lots
Filing Requirement:
Final plat and covenants to be filed with Bonneville County Recorder
Legal Reference:
Idaho Code (condemnation provisions)
Time Limits:
12 months for submission of final plat after preliminary approval; 3 months for filing after final approval
Year:
2008
Region / City:
Harbor Ridge
Theme:
Homeowners Association Meeting
Document Type:
Meeting Minutes
Organization / Institution:
Home Owners Association
Author:
Catherine Bixler (acting Secretary)
Target Audience:
Homeowners in Harbor Ridge
Period of Validity:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Context:
Record of the annual meeting of the Harbor Ridge Homeowners Association, outlining updates, financial reports, and nominations.
Year:
2025
Region / City:
Soldotna, Alaska
Topic:
Transmission Line Upgrade Project
Document Type:
Legal Notice
Agency:
U.S. Fish and Wildlife Service, U.S. Forest Service
Responsible Official:
Karlin Itchoak, Jennifer K. Youngblood
Target Audience:
Public, Interested Stakeholders
Action Period:
June 23 – July 23, 2025
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2025
Region / City:
UK Power Networks
Subject:
Access to network plans and diagrams for Independent Connection Providers and Independent Distribution Network Operators
Document type:
Process document
Organization / Institution:
UK Power Networks
Author:
Aoife Hanley, Emma Kemp
Target audience:
ICPs, IDNOs, UK Power Networks staff
Period of validity:
From 26/10/2022 to 11/10/2025
Approval date:
11 November 2025
Date of changes:
14 November 2025
Year:
2026
Region / City:
Not specified
Topic:
Substation commissioning and testing
Document Type:
Technical form
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Technicians and engineers involved in substation commissioning
Period of validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
[Insert Year]
Region / City:
[Insert Location]
Theme:
Sabotage Incident
Document Type:
Exercise Manual
Organization:
Cybersecurity and Infrastructure Security Agency (CISA)
Author:
[Insert Author Name]
Target Audience:
Exercise Participants
Period of Validity:
[Insert Exercise Date Range]
Approval Date:
[Insert Date]
Date of Revisions:
[Insert Date]
Year:
2015
Region / City:
N/A
Theme:
Electrical standards, Substation equipment
Document type:
Technical standards
Organization / Institution:
National Grid
Author:
N/A
Target audience:
Engineers, technical specialists
Period of validity:
N/A
Approval date:
22nd Jan 2015
Date of modifications:
N/A
Procurement Reference Number:
ZETDC/DP/05/2024
Year:
2024
Region / City:
Bindura, Mutoko
Subject:
Detailed design, supply, construction, and commissioning of 132kV power line and substations
Document Type:
Standard Bidding Document
Organization / Institution:
Zimbabwe Electricity Transmission & Distribution Company
Author:
ZETDC
Target Audience:
Contractors and suppliers in electrical infrastructure
Effective Period:
October 2024 - October 2024
Approval Date:
03 October 2024
Modification Date:
N/A
Year:
2025
Region / City:
California
Topic:
Energy, Clean Energy, Microgrids, Utility Contracts
Document Type:
Resolution
Organization:
Public Utilities Commission of the State of California
Author:
Pacific Gas and Electric Company
Target Audience:
Energy professionals, regulators, stakeholders in energy resilience
Period of Validity:
June 1, 2025 – September 1, 2025
Approval Date:
July 24, 2025
Date of Changes:
April 1, 2025
Project Reference:
Not specified
Post Code:
Not specified
Name of IDNO:
Not specified
Name of ICP:
Not specified
Name of Connection:
Not specified
Document Type:
Technical connection agreement and schedules
Supply Duration:
Maximum of two years
Voltage of Delivery:
6600/11000 volts
Maximum Import Capacity:
0 kVA
Maximum Export Capacity:
0 kVA
Type of Connection:
Alternative switched connection; Single circuit connection
Feeding Substation:
Primary substation (name not specified)
Feeder Name:
Not specified
Isolation Point:
Outgoing connections to the transformer from the Schneider Electric RMU in NEW SUB NAME substation
Protective Device at Connection Point:
Circuit Breaker with TLF fuse protection
C.T. Ratio:
100/5
TLF Size:
10 amps
Connection Point Substation Name:
NEW SUB NAME
Connection Point Substation Number:
NEW SUB NUMBER
Ownership During Temporary Period:
ENW Ltd responsible for HV cables and RMU
Ownership After Decommissioning:
Energetics Ltd
Generation:
No generation
Land Rights:
Rights within developer boundary acquired by IDNO; external footpath and carriageway adopted by local authority
Certificate of Test and Inspection:
Test Certificates held by named ICP
Year:
2026
Region / City:
New York
Topic:
Energy infrastructure upgrades
Document type:
Cost estimation report
Organization:
National Grid
Author:
National Grid
Target audience:
Energy industry professionals, project managers
Period of validity:
2026
Approval date:
2026
Modification date:
N/A
Year:
2024
Region / City:
South Africa
Topic:
Engineering, Procurement and Construction
Document Type:
Tender/Enquiry
Organization:
Eskom
Author:
Basil Zuma
Target Audience:
Suppliers and Bidders
Period of Validity:
2024-09-30
Approval Date:
2024-10-10
Modification Date:
N/A
Year:
2023
Region/City:
Paraparaumu
Topic:
Oil Spill Management
Document Type:
Contingency Plan
Organization:
Transpower New Zealand Limited
Author:
Transpower Contractors
Target Audience:
Transpower contractors, subcontractors, and approved employees
Period of Validity:
Ongoing
Approval Date:
N/A
Amendment Date:
N/A
Year:
2026
Region / city:
India
Topic:
Internet of Things, Electrical Substations, Smart Grids
Document Type:
Original Research Article
Institution:
Basaveshwar Engineering College
Author:
K. Nagarathna
Target Audience:
Researchers, Engineers in Electrical Engineering, IoT Enthusiasts
Period of Validity:
Ongoing
Date of Approval:
2026
Date of Modifications:
Not specified
Ethical Issues:
None
References:
The references are not fully up-to-date with recent works in IoT-based substation automation.
Language Quality:
High-level scholarly communication
Context:
The document presents a detailed experimental framework for implementing an IoT-based monitoring and control system in electrical substations, focusing on real-world applications in smart grids.