№ lp_2_2_03861
File format: docx
Character count: 4301
File size: 18 KB
Formal agreements confirming that various licensees, cable owners, and pipeline owners do not object to the crossing of their assets by the Field/Project Name pipelines and cables, detailing approvals for installations, modifications, and decommissioning activities.
Year:
Not specified
Region / Location:
Northern North Sea
Document Type:
Agreement / Approval Letter
Involved Parties:
Licensee Companies, Cable Companies, Pipeline Owners, Project Partners
Project Name:
Field/Project Name (unspecified)
Scope:
Crossing of Blocks, Carbon Storage Areas, Gas Storage Licensed Areas, pipelines, and cables
Approval Type:
PWA and Category 1, Decommissioning, Category 2
Signatories:
Directors / Secretaries / Managing Directors with authority
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2022
Region / City:
Knoxville, Tennessee
Subject:
Property Rights, Property Management
Document Type:
Legal Declaration
Author:
Kevin C. Stevens, Esquire
Target Audience:
Homeowners, Property Owners, Real Estate Associations
Effective Period:
From the date of approval
Approval Date:
2022
Date of Amendments:
2022
Note:
Location
Year:
201#
Region / City:
[location]
Topic:
Level Crossings, Traffic Safety
Document Type:
Legal Order
Organ / Institution:
Department for Transport
Author:
Secretary of State for Transport
Target Audience:
Operators, Traffic Authorities
Period of Validity:
From DD MONTH 201#
Approval Date:
[leave blank]
Modification Date:
[leave blank]
Year:
2024
Jurisdiction:
State of California
Regulatory Framework:
Title 14, California Code of Regulations, Division 1.5, Chapter 4, Subchapters 4, 5, 6, and 7
Subject:
Watercourse Crossings and Emergency Timber Operations
Governing Body:
State Board of Forestry and Fire Protection
Related Statutes:
Z’berg-Nejedly Forest Practice Act of 1973 (PRC § 4511 et seq.); PRC §§ 4551, 4551.5, 4553; Fish and Game Code § 1602; Clean Water Act § 401
Agencies Involved:
California Department of Fish and Wildlife; California State Water Resources Control Boards; CAL FIRE; Regional Water Quality Control Boards; United States Fish and Wildlife Service
Affected Areas:
Watercourse and Lake Protection Zones (WLPZ); watersheds containing listed anadromous salmonids
Document Type:
Initial Statement of Reasons for Regulatory Amendments
Purpose:
Clarification and revision of regulatory requirements concerning approved watercourse crossings and emergency notice timber operations
Legal Authority:
Public Resources Code and Fish and Game Code provisions cited in text
Context:
Regulatory Review Call 2023
Note:
Year
603 KAR 7:
090 Compliant:
Authors:
Tracie McKinney; Carolina Orozco Zamora
Affiliations:
School of Applied Sciences, University of South Wales, Pontypridd, UK; Oficina Subregional de Cóbano, Área de Conservación Tempisque, Sistema Nacional de Áreas de Conservación (SINAC), Costa Rica
Funding:
PSGB Grant 2021 funded by Professor Sandy Harcourt and Dr Kelly Stewart
Year:
2021–2022
Geographic Area:
Puntarenas Province, Nicoya Peninsula, Costa Rica (Malpaís, Santa Teresa, Pochote, Paquera, Cóbano)
Subject:
Wildlife conservation; mitigation of road-related primate mortality; arboreal bridge installation
Species:
Mantled howler monkey (Alouatta palliata)
Organizations Involved:
Sistema Nacional de Áreas de Conservación (SINAC); Instituto Costarricense de Electricidad (ICE); Coopeguanacaste; University of South Wales
Document Type:
Project report
Project Activities:
Installation of five arboreal wildlife bridges; deployment of camera traps; monitoring of bridge use
Project Period:
2021–2022 (rainy and dry season monitoring)
References:
IUCN Red List (2020); SINAC Resolution ACT-OR-DR-037-2021; peer-reviewed and conference sources
Year:
2017
Region / City:
England and Wales
Topic:
Police support volunteers, volunteer management, public sector funding
Document Type:
Report
Organization / Institution:
UNISON
Author:
UNISON
Target Audience:
Police forces, policymakers, public sector administrators
Period of validity:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Year:
201#
Region / City:
[Leave blank]
Theme:
Level crossing regulations
Document type:
Legal Order
Author:
Secretary of State for Transport
Target audience:
Operators, local traffic authorities, railway safety bodies
Period of validity:
From DD MONTH 201#
Date of approval:
[Leave blank]
Date of amendments:
[Leave blank]
Note:
Year
Region / City:
Barnsley
Topic:
Vehicle access
Document Type:
Application form
Organization / Institution:
Barnsley Metropolitan Borough Council
Target Audience:
Residents of Barnsley
Contextual Description:
Form for requesting permission to create a vehicle access crossing over the highway, with options for private contractors or Barnsley MBC services.
Year:
2015
Region / City:
Olympia, Washington
Theme:
Grant Agreement, Transportation, Railroad Safety
Document Type:
Project Grant Agreement
Agency / Institution:
Washington Utilities and Transportation Commission (WUTC)
Author:
Washington Utilities and Transportation Commission (WUTC)
Target Audience:
Port of Chehalis, Grant Recipients, Transportation Authorities
Period of Effectiveness:
October 8, 2015 - December 31, 2015
Approval Date:
October 8, 2015
Amendment Date:
N/A
Note:
Year
Region / City:
Hoppers Crossing, Werribee, Wyndham Vale, Manor Lakes, Point Cook, Tarneit
Theme:
Kindergarten Placements
Document Type:
Schedule
Organization:
Various Kindergartens
Target Audience:
Parents, guardians, and caregivers looking for kindergarten placements
Year:
2025
Region / City:
Hyderabad
Subject:
Tender Document for Power Line Shifting
Document Type:
Bid Document
Organization:
Southern Power Distribution Company of Telangana Limited
Author:
Superintending Engineer, SCADA Circle
Target Audience:
Bidders
Period of Execution:
6 months
Approval Date:
01.10.2025
Modification Date:
N/A
Note:
Year
Subject:
Electrical Engineering, Cable Bus Systems
Document Type:
Specification
Organization / Institution:
Powell Electrical Systems, Inc.
Target Audience:
Electrical engineers, designers, manufacturers, and installers of cable bus systems
Year:
2026
Voltage Rating:
600V
Temperature Rating:
90°C
Standards:
UL 2196, ULC S-139, UL 44, NFPA 70, NFPA 130, NFPA 502, IEEE 1202/FT4-ST1
Type of Cable:
Fire-resistive power cable
Insulation:
Thermoset, Low Smoke Zero Halogen
Conductor Sizes:
14 AWG to 500 MCM
Installation:
Horizontal and Vertical, EMT or Phenolic Conduit
Applications:
Fire Pumps, Emergency Generators, Ventilating Fans, Emergency Lighting, Emergency Elevators, High Rise Buildings, Hospitals, Places of Mass Assembly
Manufacturer:
Best Wire
Year:
2016
Jurisdiction:
Wales
Region:
River Towy, Carmarthenshire
Document type:
EIA consent decision
Legal basis:
Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended)
Regulation:
Regulation 22
Project description:
Deposit of an underground electricity cable using Horizontal Directional Drill
Applicant:
Western Power Distribution Ltd
Marine licence application number:
CML1551
Associated development:
Brechfa Forest onshore windfarm
Competent authority:
Natural Resources Wales Marine Licensing Team
Environmental documentation:
Environmental Statement
Consultation period:
February–March 2016
European protected sites:
River Towy SAC; Carmarthen Bay and Estuaries SAC
Decision outcome:
EIA consent granted subject to conditions
Approval dates:
04/07/2016; 30 November 2016
Document type:
Inspection report form
Project:
Cable route installation
Inspection scope:
Trenching, ULX, URX
Inspection activities:
Cable depth, trench dimensions, bedding, conduits, backfill, compaction, markers, restoration
Measurement units:
Millimetres, metres
Inspection methods:
Visual inspection, measurement prior to backfill
Infrastructure elements:
Pipes, conduits, direct buried cables, ballast, marker tape
Verification fields:
Verified or tested by, initials, date
Compliance reference:
Detailed Site Surveys (DSS)
Work status statement:
Installation in accordance with applicable standards
Follow-up inspections:
24 hours, 72 hours, 2 weeks
Construction features recorded:
Trench width, trench depth, soil type, pipe arrangement, cross section
Source type:
Engineering inspection record used to document compliance and physical conditions of installed cable routes during and after trenching activities.