№ lp_1_2_08500
File format: docx
Character count: 22719
File size: 262 KB
The document provides a detailed procedure for managing and controlling Asbestos-Containing Materials (ACM) across the Canberra Health Services network, ensuring worker and public safety.
Year:
2023
Region / City:
Canberra
Topic:
Asbestos Management
Document Type:
Procedure
Organization / Institution:
Canberra Health Services (CHS)
Author:
Not specified
Target Audience:
CHS workers and contractors
Effective Period:
Ongoing
Approval Date:
Not specified
Date of Changes:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Note:
Year
Subject:
Asbestos abatement
Document type:
Technical specification
Organization / Agency:
U.S. Department of Veterans Affairs (VA)
Author:
Architect/Engineer and/or Industrial Hygiene Consultants
Target audience:
Asbestos abatement contractors and project personnel
Regulations referenced:
AHERA, NESHAP, Federal, State, and Local codes
Scope:
Removal, clean-up, and disposal of Transite-type asbestos-containing materials (ACM)
Related sections:
Section 07 84 00 FIRESTOPPING; Section 02 41 00 DEMOLITION; Division 09 FINISHES
Tasks included:
Pre-abatement preparation, abatement activities, cleaning and decontamination
Limitations:
Use of building facilities, regulated area setup, and temporary waste storage per VA procedures
Variations:
+/-10% quantity tolerance; additional work requires unit pricing submission
Year:
2024
Region / city:
East London
Topic:
Asbestos Management
Document Type:
Policy
Organization / Institution:
East London NHS Foundation Trust
Author:
Interim Senior Engineering Manager, Frankham Consultancy Group, Assistant Director of Estates – Engineering and Infrastructure
Target Audience:
ELFT staff, Contractors
Period of validity:
November 2024 - November 2027
Approval Date:
30th March 2024
Date of Ratification:
27th November 2024
Last Review Date:
November 2024
Next Review Date:
November 2027
Note:
Year
Region / City:
Louisiana / Baton Rouge
Subject:
Asbestos Accreditation
Document Type:
Affidavit / Application Form
Organization:
Louisiana Department of Environmental Quality, Office of Environmental Services, Public Participation and Permit Support Division, Notifications and Accreditations Section
Author:
Applicant
Target Audience:
Workers, Contractors, Inspectors, Management Planners, Project Designers
Fee Amount:
Varies by accreditation type and processing speed
Processing Time:
Normal 30 days, Emergency ~5 days
Duplicate Card Fee:
$37
Accreditation Requirements:
Training completion, proof of qualifications, photo ID
Regulations Referenced:
Louisiana Administrative Code, Title 33, Part III, Chapters 27 & 51, Subchapter M
Section number:
02 82 13.41
Subject:
Asbestos abatement in total demolition
Document type:
Technical specifications
Applicable agency:
Department of Veterans Affairs
Regulatory framework:
EPA NESHAP 40 CFR Part 61 Subpart M; EPA 40 CFR Part 763 Subpart E
Scope of work:
Removal of regulated asbestos-containing materials prior to total demolition
Project context:
Total demolition of facilities
Survey requirements:
Full NESHAP asbestos inspection, including intrusive surveys where required
Defined materials:
ACM, RACM, friable asbestos, Category I and Category II non-friable ACM
Related hazards addressed:
Lead-based paint, PCBs, mercury, fluorescent bulbs, batteries, soil contamination
Labor requirements:
Davis-Bacon Act prevailing wage requirements
Related documents:
Contract drawings, Division 01 General Requirements, Accident Prevention FAR 52.236-13
Year:
2022
Region / city:
The Gambia
Theme:
Asbestos removal, health care facility renovation
Document type:
Action plan
Organization / institution:
Ministry of Health, The Gambia
Author:
Ministry of Health, World Bank, Masterplan Architects + Engineers, National Environment Authority
Target audience:
Government officials, healthcare administrators, environmental and social professionals, contractors
Period of validity:
Indefinite
Approval date:
September 9, 2022
Date of amendments:
N/A
Note:
Year
Subject:
Asbestos management
Document Type:
Template
Note:
Year
Year:
2022
Region / city:
Birmingham
Theme:
Asbestos management, health and safety
Document type:
Policy
Organ / institution:
University of Birmingham
Author:
University of Birmingham
Target audience:
University staff, contractors
Period of validity:
Indefinite
Approval date:
Not specified
Date of amendments:
Not specified
Year:
2024
Region / City:
Alberta
Topic:
Asbestos Control
Document Type:
Technical Specification
Organization / Institution:
Alberta Ministry of Environment and Parks
Author:
N/A
Target Audience:
Contractors, Workers, Environmental Consultants
Period of Application:
N/A
Approval Date:
2024-06-18
Date of Amendments:
N/A
Year:
2012
Region / City:
Oxfordshire
Document Type:
Management Plan and Register
Organization:
Oxfordshire County Council
Author:
Not specified
Responsible Person:
Head of Facilities Management
Duty Holder:
Premises Manager
Target Audience:
Staff and contractors on site
Inspection Period:
Annual
Training:
Asbestos Awareness 1 2.3
Reference System:
SHINE system
Related Documents:
OCC Asbestos Policy and Management Plan, Property Action Plan
Survey Type:
Management Survey; Refurbishment and Demolition Survey
Year:
2026
Region / City:
Louisiana
Subject:
Asbestos Contaminated Debris Activity Notification
Document Type:
Form
Agency / Institution:
Louisiana Department of Environmental Quality
Author:
Louisiana Department of Environmental Quality
Target Audience:
Contractors, Demolition and Renovation professionals, Environmental Services
Action Period:
Ongoing
Approval Date:
Not specified
Modification Date:
Not specified
Year:
Not specified
Region / City:
Not specified
Theme:
Asbestos Management
Document Type:
Instruction
Organization / Institution:
ARTC
Author:
Not specified
Target Audience:
Workers and contractors working with asbestos
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Note:
Year
Document type:
Exposure control plan
Subject:
Asbestos management and exposure control
Organization:
Housing Provider
Responsible entity:
Name of Society
Regulatory basis:
WCB Regulations
Scope:
Managed residential properties
Affected materials:
Asbestos-containing materials
Target groups:
Employees, contractors, tenants, building occupants
Program components:
Management procedures; Operations and maintenance procedures
Health risks addressed:
Asbestosis; Mesothelioma; Lung cancer
Appendices:
Asbestos survey reports; Emergency clean up procedures; Bulk sample collection procedures; Safe work procedures
Source type:
Organizational policy and safety plan
Note:
Year
Theme:
Asbestos Abatement
Document Type:
Specifications
Year:
2025
Document code:
CHS25/008
Country:
Australia
Region:
Australian Capital Territory
Subject:
Advance Care Planning
Document type:
Guideline
Issuing organisation:
Canberra Health Services
Target audience:
CHS Network staff
Population:
Adults aged 18 years and over
Care setting:
Inpatient, outpatient, and community health services
Legal framework:
Powers of Attorney Act 2006 and relevant state and territory legislation
Related systems:
Digital Health Record
Focus areas:
End-of-life care, substitute decision-making, culturally diverse populations, disability, elder abuse
Scope:
All Canberra Health Services Network facilities and services
Year:
2021
Region / City:
Canberra
Topic:
Medication Safety
Document Type:
Policy Statement
Organization / Institution:
Canberra Health Services
Author:
Not specified
Target Audience:
CHS staff, including employees, contractors, volunteers, and students
Effective Period:
Indefinite
Approval Date:
12/05/2021
Amendment Date:
12/05/2021
Year:
2022
Region / City:
Canberra
Topic:
Child Protection, Employment-based Child Protection Measures
Document Type:
Policy
Organization / Institution:
Canberra Health Services
Author:
Canberra Health Services Policy Team
Target Audience:
CHS Network Employees and Contractors
Period of Application:
Ongoing
Approval Date:
03 June 2022
Amendment Date:
17/01/2024
Date of Last Update:
11/04/2024
Organization:
Canberra Health Services
Type of document:
Clinical guideline
Topic:
Developmental Dysplasia of the Hip
Clinical setting:
Centenary Hospital for Women and Children; Maternal and Child Health (MACH)
Target audience:
Medical officers; nurses; midwives; maternal and child health nurses; physiotherapists; students
Population:
Newborns, infants, and young children
Condition incidence:
1:1000 live births
Assessment methods:
Clinical examination; hip ultrasound; AP pelvic X-ray
Screening timeframe:
Birth to walking age
Risk factors addressed:
Breech or non-vertex presentation; family history; neuromuscular disease; foot deformities
Management approaches:
Surveillance; imaging; Pavlik harness; referral to orthopaedic surgery
Attachments included:
Screening examinations; assessment flowcharts; consumer and physiotherapy handouts
Note:
Year
Document Type:
Procedure
Organization / Institution:
Canberra Health Services