№ lp_1_2_39007
File format: docx
Character count: 12566
File size: 65 KB
Plan and register detailing the management, monitoring, and recording of asbestos-containing materials in premises, including responsibilities, inspections, risk assessments, and staff communication procedures.
Year:
2012
Region / City:
Oxfordshire
Document Type:
Management Plan and Register
Organization:
Oxfordshire County Council
Author:
Not specified
Responsible Person:
Head of Facilities Management
Duty Holder:
Premises Manager
Target Audience:
Staff and contractors on site
Inspection Period:
Annual
Training:
Asbestos Awareness 1 2.3
Reference System:
SHINE system
Related Documents:
OCC Asbestos Policy and Management Plan, Property Action Plan
Survey Type:
Management Survey; Refurbishment and Demolition Survey
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2019
Region / City:
United States
Topic:
Market Research, Contracting
Document Type:
Notice
Agency:
Department of Veterans Affairs (VA)
Author:
Vicki Whiteman, Procurement & Logistics Office (10NA2)
Target Audience:
Potential contractors in the digital health technology sector
Period of validity:
Until further notice
Approval Date:
Not specified
Modification Date:
Not specified
Document number:
01
Document type:
Baseline Risk Assessment
Project number:
CSA 3254
Date:
04-03-2020
Revision:
01
Author:
Bongiwe Gazu
Reviewed and Approved by:
Arty Zondi
Number of pages:
13
Scope of work:
Site access, site establishment, traffic accommodation, bulk earthworks, construction of slabs, excavation work and back filling, drainage/sewage/storm water, emergency management, subcontractor management, community risk management, existing services, removal of rubble and large trees, density testing, landscaping and grassing, construction mobile plant & equipment
Risk estimation method:
Risk score technique (Exposure, Probability, Severity)
Risk profile:
High risk – immediate correction needed
Occupational Health and Safety Act:
Yes
References:
Occupational Health & Safety Act and its Regulation, Physical Inspection of the construction site
Type of document:
Baseline Risk Assessment
Location:
Caneside Occ Health Parkhome Clinic
Industry:
Construction
Purpose:
To evaluate potential risks in a construction environment
Target audience:
Site managers, safety officers, construction workers
Review and monitoring plan:
Part of health and safety plan to be applied on site
Year:
2026
Region / City:
Oxfordshire
Subject:
Educational visits, off-site activities, corporate parenting
Document Type:
Policy
Organization:
Oxfordshire County Council
Author:
Mike Fawcett
Target Audience:
OCC staff, educational institutions, service providers
Effective Period:
2026
Approval Date:
2026
Amendment Date:
N/A
Year:
2022
Region / City:
Oakton Community College, Calumet College of St. Joseph
Subject:
Business Management
Document Type:
Transfer Planning Guide
Institution:
Oakton Community College, Calumet College of St. Joseph
Author:
Oakton Community College, Calumet College of St. Joseph
Target Audience:
Students transferring from Oakton Community College to Calumet College of St. Joseph
Period of Validity:
Ongoing
Approval Date:
2022
Modification Date:
Pending
Year:
2018
Region / City:
U.S.
Subject:
Futures Trading, Margin Requirements
Document Type:
Notice
Organization:
Nasdaq
Author:
Nasdaq Market Operations
Target Audience:
Futures traders, market participants
Effective Date:
July 18, 2018
Period of Validity:
From July 19, 2018
Approval Date:
Not specified
Amendment Date:
Not specified
Context:
The document is a notice regarding the listing of a U.S. Treasury Futures contract and margin requirements for futures trading.
Year:
2025
Region / City:
Not specified
Theme:
Age-friendly care, Medication, Mentation, Mobility
Document Type:
Program Agenda
Organization / Institution:
IHI (Institute for Healthcare Improvement)
Author:
Not specified
Target Audience:
Healthcare professionals
Effective Period:
September 17, 2025 – December 3, 2025
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
[Year]
Region / City:
[Location]
Topic:
Mission Trip, Humanitarian Aid
Document Type:
Letter of Request for Support
Organization:
Samaritan’s Purse
Author:
[Name]
Target Audience:
[Supporters, Donors, Church Community]
Period of Activity:
[Dates]
Approval Date:
[Date]
Date of Changes:
[Date]
Year:
2025
Location:
St. Julian’s, Malta
Organization:
3rd Generation Partnership Project (3GPP)
Working Group:
TSG-RAN WG1
Meeting:
TSG-RAN WG1 Meeting #121
Document type:
Draft Change Request
Specification:
3GPP TS 36.212
Current specification version:
18.1.0
Release:
Rel-19
Category:
B (addition of feature)
Work item code:
IoT_NTN_Ph3-Core
Source:
FUTUREWEI
Date:
27 May 2025
Affected clause:
6.4.3.1
Affected specifications:
36.213
Technical scope:
LTE radio access network; IoT over non-terrestrial networks
Topic:
Downlink Control Information format N0 and OCC support for NPUSCH scheduling
Note:
Year
Subject:
Asbestos abatement
Document type:
Technical specification
Organization / Agency:
U.S. Department of Veterans Affairs (VA)
Author:
Architect/Engineer and/or Industrial Hygiene Consultants
Target audience:
Asbestos abatement contractors and project personnel
Regulations referenced:
AHERA, NESHAP, Federal, State, and Local codes
Scope:
Removal, clean-up, and disposal of Transite-type asbestos-containing materials (ACM)
Related sections:
Section 07 84 00 FIRESTOPPING; Section 02 41 00 DEMOLITION; Division 09 FINISHES
Tasks included:
Pre-abatement preparation, abatement activities, cleaning and decontamination
Limitations:
Use of building facilities, regulated area setup, and temporary waste storage per VA procedures
Variations:
+/-10% quantity tolerance; additional work requires unit pricing submission
Year:
2024
Region / city:
East London
Topic:
Asbestos Management
Document Type:
Policy
Organization / Institution:
East London NHS Foundation Trust
Author:
Interim Senior Engineering Manager, Frankham Consultancy Group, Assistant Director of Estates – Engineering and Infrastructure
Target Audience:
ELFT staff, Contractors
Period of validity:
November 2024 - November 2027
Approval Date:
30th March 2024
Date of Ratification:
27th November 2024
Last Review Date:
November 2024
Next Review Date:
November 2027
Note:
Year
Region / City:
Louisiana / Baton Rouge
Subject:
Asbestos Accreditation
Document Type:
Affidavit / Application Form
Organization:
Louisiana Department of Environmental Quality, Office of Environmental Services, Public Participation and Permit Support Division, Notifications and Accreditations Section
Author:
Applicant
Target Audience:
Workers, Contractors, Inspectors, Management Planners, Project Designers
Fee Amount:
Varies by accreditation type and processing speed
Processing Time:
Normal 30 days, Emergency ~5 days
Duplicate Card Fee:
$37
Accreditation Requirements:
Training completion, proof of qualifications, photo ID
Regulations Referenced:
Louisiana Administrative Code, Title 33, Part III, Chapters 27 & 51, Subchapter M
Section number:
02 82 13.41
Subject:
Asbestos abatement in total demolition
Document type:
Technical specifications
Applicable agency:
Department of Veterans Affairs
Regulatory framework:
EPA NESHAP 40 CFR Part 61 Subpart M; EPA 40 CFR Part 763 Subpart E
Scope of work:
Removal of regulated asbestos-containing materials prior to total demolition
Project context:
Total demolition of facilities
Survey requirements:
Full NESHAP asbestos inspection, including intrusive surveys where required
Defined materials:
ACM, RACM, friable asbestos, Category I and Category II non-friable ACM
Related hazards addressed:
Lead-based paint, PCBs, mercury, fluorescent bulbs, batteries, soil contamination
Labor requirements:
Davis-Bacon Act prevailing wage requirements
Related documents:
Contract drawings, Division 01 General Requirements, Accident Prevention FAR 52.236-13
Year:
2022
Region / city:
The Gambia
Theme:
Asbestos removal, health care facility renovation
Document type:
Action plan
Organization / institution:
Ministry of Health, The Gambia
Author:
Ministry of Health, World Bank, Masterplan Architects + Engineers, National Environment Authority
Target audience:
Government officials, healthcare administrators, environmental and social professionals, contractors
Period of validity:
Indefinite
Approval date:
September 9, 2022
Date of amendments:
N/A
Year:
2023
Region / City:
Canberra
Topic:
Asbestos Management
Document Type:
Procedure
Organization / Institution:
Canberra Health Services (CHS)
Author:
Not specified
Target Audience:
CHS workers and contractors
Effective Period:
Ongoing
Approval Date:
Not specified
Date of Changes:
Not specified
Note:
Year
Subject:
Asbestos management
Document Type:
Template
Note:
Year
Year:
2022
Region / city:
Birmingham
Theme:
Asbestos management, health and safety
Document type:
Policy
Organ / institution:
University of Birmingham
Author:
University of Birmingham
Target audience:
University staff, contractors
Period of validity:
Indefinite
Approval date:
Not specified
Date of amendments:
Not specified
Year:
2024
Region / City:
Alberta
Topic:
Asbestos Control
Document Type:
Technical Specification
Organization / Institution:
Alberta Ministry of Environment and Parks
Author:
N/A
Target Audience:
Contractors, Workers, Environmental Consultants
Period of Application:
N/A
Approval Date:
2024-06-18
Date of Amendments:
N/A
Year:
2026
Region / City:
Louisiana
Subject:
Asbestos Contaminated Debris Activity Notification
Document Type:
Form
Agency / Institution:
Louisiana Department of Environmental Quality
Author:
Louisiana Department of Environmental Quality
Target Audience:
Contractors, Demolition and Renovation professionals, Environmental Services
Action Period:
Ongoing
Approval Date:
Not specified
Modification Date:
Not specified
Year:
Not specified
Region / City:
Not specified
Theme:
Asbestos Management
Document Type:
Instruction
Organization / Institution:
ARTC
Author:
Not specified
Target Audience:
Workers and contractors working with asbestos
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified