№ lp_1_2_24889
File format: docx
Character count: 96807
File size: 1211 KB
This document outlines the risk assessment methodology for high-pressure natural gas pipelines, focusing on safety risks and associated land use planning considerations.
Year:
2013
Region / City:
United Kingdom
Topic:
Risk assessment, gas pipelines, safety
Document type:
Standard
Organization / Institution:
Institution of Gas Engineers and Managers (IGEM)
Author:
IGEM Gas Transmission and Distribution Committee
Target audience:
Pipeline operators, planners, engineers
Validity period:
Not specified
Approval date:
Not specified
Amendment date:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2025
Region / City:
United States
Topic:
Natural Gas Pipelines, Energy Regulation
Document Type:
Notice of Proposed Rulemaking
Agency:
Federal Energy Regulatory Commission
Author:
Federal Energy Regulatory Commission
Target Audience:
Industry professionals, regulatory bodies, and energy sector stakeholders
Period of Validity:
Not specified
Approval Date:
October 16, 2025
Amendment Date:
Not specified
Year:
No specific year mentioned
Region / city:
No specific region or city mentioned
Subject:
Oil discharge prevention, marine oil terminals, pipelines, vessel operations, and safety
Document Type:
Regulatory document
Organization / institution:
No specific institution mentioned
Author:
No specific author mentioned
Target Audience:
Operators of marine oil terminals, pipeline operators, vessel operators
Period of validity:
No specific period mentioned
Approval Date:
No specific date mentioned
Date of amendments:
No specific date mentioned
Year:
2016
Jurisdiction:
India
Place of issue:
New Delhi
Issuing authority:
Petroleum and Natural Gas Regulatory Board
Legal basis:
Petroleum and Natural Gas Regulatory Board Act, 2006
Document type:
Regulatory notification
Subject matter:
Technical standards, specifications and safety standards for petroleum and petroleum products pipelines
Scope of application:
Onshore petroleum and petroleum products pipelines, including existing and new pipelines
Applicable standard:
ASME B31.4
Covered activities:
Design, materials and equipment, fabrication, installation, testing, corrosion control, operation, maintenance and safety
Compliance mechanism:
Monitoring by the Board or accredited third party and mandatory quantitative risk analysis for non-conformities
Schedules and annexures:
Schedule I (1A–1H) and Annexure I to Annexure IV
Year:
2025
Region / City:
United Kingdom
Topic:
Gas transmission and infrastructure
Document Type:
Legal Document
Institution:
Independent Gas Transporter
Author:
Not specified
Target Audience:
Gas transporters, shippers, system operators
Period of Validity:
Ongoing
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2018
Agency:
Federal Energy Regulatory Commission
Docket Number:
RM18-11-000
Action:
Notice of Proposed Rulemaking
Keywords:
Natural Gas Pipelines, Federal Income Tax Rate, Rate Changes, Tax Cuts and Jobs Act, United Airlines Decision, Natural Gas Act
Target Audience:
Energy Industry, Regulatory Bodies, Natural Gas Pipelines
Period of Effect:
January 1, 2018
Approval Date:
March 15, 2018
Document Type:
Regulatory Notice
Context:
Regulatory notice issued by the Federal Energy Regulatory Commission addressing changes in rate-setting for interstate natural gas pipelines in response to the Tax Cuts and Jobs Act of 2017 and subsequent policy updates.
Year:
2015
Region / City:
United States
Subject:
Energy regulation, Natural gas pipelines
Document type:
Final rule
Agency / Institution:
Federal Energy Regulatory Commission
Author:
Federal Energy Regulatory Commission
Target audience:
Energy industry professionals, regulatory bodies
Period of validity:
Not specified
Approval date:
April 16, 2015
Amendment date:
Not specified
Year:
2017
Region / City:
Australia
Topic:
Pipelines
Document Type:
Regulations
Authoring Organization:
Government of Australia
Target Audience:
Industry professionals, government bodies, pipeline operators
Period of Validity:
Ongoing from 26 March 2017
Approval Date:
26 March 2017
Amendment Date:
N/A
Year:
2024
Region / City:
New Jersey
Topic:
Data Engineering, Cloud Technologies, ETL Pipelines
Document Type:
Resume / CV
Organization / Institution:
N/A
Author:
Sai Chava
Target Audience:
Employers, Recruiters, Data Engineering Teams
Period of Validity:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Year:
2023
Region / City:
NJ
Subject:
Data Engineering, Cloud Platforms, Real-time Data Pipelines
Document Type:
Resume
Organization / Institution:
Citi Bank
Author:
Deepthi P
Target Audience:
Hiring Managers, Data Engineering Teams, Technical Recruiters
Effective Period:
Current
Approval Date:
Aug 2023
Modification Date:
N/A
Year:
2020
Date:
17 July 2020
Place:
New Delhi
Document Type:
Regulatory Notification
Issuing Authority:
Petroleum and Natural Gas Regulatory Board
Legal Basis:
Section 61 of the Petroleum and Natural Gas Regulatory Board Act, 2006 (19 of 2006)
Subject:
Amendment to Technical Standards and Safety Standards for Natural Gas Pipelines
Amended Regulation:
Petroleum and Natural Gas Regulatory Board (Technical Standards and Specifications including Safety Standards for Natural Gas Pipelines) Regulations, 2009
Related Regulations:
PNGRB (Technical Standards and Specifications including Safety Standards for City or Local Gas Distribution Network) Regulations, 2008; PNGRB (Codes of Practices for Emergency Response and Disaster Management Plan (ERDMP)) Regulations, 2010
Scope:
Natural Gas Transmission and Distribution Pipelines
Key Provisions:
Appointment of responsible director for compliance; revised material specifications for steel pipes; provisions for PE pipelines in Class 1 and 2 locations; valve spacing requirements; installation of fire and gas or multi-sensor detectors; emergency response and disaster management plan requirements; updated fire fighting equipment specifications
Commencement:
On the date of publication in the Official Gazette
Official reference:
F. No. PNGRB/Tech/2-T4SNGPL/(1)/2019
Year:
2015
Date:
April 9, 2015
Region / State:
California, United States
City referenced:
San Bruno, California
Subject:
Natural gas pipeline safety and regulatory compliance
Document type:
Regulatory commission decision
Authority / Institution:
California Public Utilities Commission
Company concerned:
Pacific Gas and Electric Company (PG&E)
Related incidents:
San Bruno gas transmission pipeline explosion of September 9, 2010
Investigations:
Investigation 12-01-007; Investigation 11-02-016; Investigation 11-11-009
Legal basis:
California Public Utilities Code § 451; General Order 112; Title 49 Code of Federal Regulations Part 192
Penalties imposed:
$1.6 billion in fines, credits, and safety investments
Fine to General Fund:
$300 million
Infrastructure safety investments:
$850 million funded by PG&E shareholders
Ratepayer bill credit:
$400 million one-time credit
Additional safety remedies funding:
Approximately $50 million
Number of violations identified:
2,425
Affected infrastructure:
Natural gas transmission pipeline system
Casualties referenced:
8 deaths and 58 injuries
Property damage referenced:
38 homes destroyed and 70 homes damaged
Year:
2026
Region / City:
Not specified
Subject:
Sewer Infrastructure Inspection
Document Type:
Technical Specification
Organization / Institution:
HRSD (Hampton Roads Sanitation District)
Author:
Not specified
Target Audience:
Contractors performing pipeline and manhole inspections
Applicable Period:
Ongoing project duration
Approval Date:
Not specified
Revision Date:
Not specified
Standards Referenced:
NASSCO PACP, MACP, LACP
Year:
2023
Region / City:
Bentonville, AR, Dallas, TX
Theme:
Data Engineering, Cloud Computing, Data Processing, Cloud Architecture
Document Type:
Resume
Organization:
Walmart, Southern California Edison
Author:
Anusha Reddy
Target Audience:
Hiring Managers, Data Engineering Teams
Period of Activity:
Apr 2025-Present, Mar 2024-Feb 2025
Approval Date:
Not specified
Modification Date:
Not specified
Author:
Hamed Habibi, MSc, MME
Position:
Technical Director
Organisation:
Speir Hunter
Address:
Mayden House, Main Street, Long Bennington, Newark NG23 5DJ, UK
Document Type:
Technical paper
Subject:
Pipeline integrity monitoring and stress detection in carbon steel pipelines
Technology Described:
Remote Magnetic Monitoring (RMM), Large Standoff Magnetometry (LSM), Stress Concentration Tomography (SCT)
Scientific Concepts:
Inverse-Magnetostriction, Villari Effect, magnetic field response to mechanical stress
Industry:
Oil and gas pipeline infrastructure
Material Studied:
Carbon steel pipelines
Keywords:
RMM, LSM, SCT, SCZ, Localised Stress, Stress Monitoring, Condition Assessment, Pipeline Integrity
Focus:
Detection and measurement of localised stress in pipeline walls using magnetic field analysis
Year:
2014
Region / city:
Geneva
Subject:
Assessing uniformity by off-types
Document type:
Report
Organization / institution:
International Union for the Protection of New Varieties of Plants (UPOV)
Author:
UPOV Office
Target audience:
UPOV members and experts in plant variety assessment
Period of validity:
Not specified
Approval date:
Not specified
Date of amendments:
Not specified
Year:
2020
Region / City:
San Francisco
Topic:
Airport Operations, Aviation
Document Type:
Research Paper
Institution:
Embry-Riddle Aeronautical University
Author:
Joe B. Student
Audience:
Aviation Students, Researchers
Period of Validity:
Not specified
Approval Date:
May 3, 2020
Date of Last Update:
Not specified
Year:
2026
Region / city:
Neboshville
Theme:
Environmental impact assessment
Document type:
Assessment
Organization / institution:
NPD University
Author:
Not specified
Target audience:
NEBOSH learners
Period of validity:
Not specified
Approval date:
Not specified
Amendment date:
Not specified
Year:
2019
Region / city:
Minnesota
Topic:
Recruitment and selection process
Document type:
Guide
Organization / institution:
State of Minnesota
Author:
Unknown
Target audience:
State agency HR professionals
Period of validity:
Ongoing
Approval date:
Unknown
Modification date:
Unknown
Year:
2026
Region / city:
Global
Topic:
Mental Health, Discrimination, Stigma
Document type:
Research Article
Author:
Ioannis Bakolis, Graham Thornicroft, Silia Vitoratou, Nicolas Rüsch, Chiara Bonetto, Antonio Lasalvia, Sara Evans-Lacko
Target audience:
Researchers, Mental Health Professionals
Period of validity:
Ongoing
Date of approval:
2026
Date of changes:
None
Note:
Year
Topic:
Dietary assessment
Document type:
Survey form
Target audience:
Parents or guardians of children
Contextual description:
A survey form designed for assessing the dietary diversity of children and whether meals were reheated before consumption.